MISCELLANEOUS COMMENTS ON PLANS & SPECS FOR MOVEABLE SHELVING BUILDING A-18

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP74-00005R000100110023-7
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
19
Document Creation Date: 
November 11, 2016
Document Release Date: 
August 31, 1998
Sequence Number: 
23
Case Number: 
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP74-00005R000100110023-7.pdf1018.66 KB
Body: 
Sanitized - App,oved For Release.: CIA-RDP74-00005R000100110023-7 MISCELLANEOUS COMMENTS ON PLANS & SPECS FOR MOVEABLE SHELVING BUILDING A-18 PLANS 1 of 3 Shelving Layout a. Has general work area (Contractor)')4en elineated? b. Will there be any problem with the '3-Deep' in the fixed storage areas? c. Building wing locator on drawing - put-on. d. Incre ent ocator on d wing - put on. a. There seems to be some confusion as to what is existing and what is to be new work - clear up. b. New Service for Shelving (1) Is it on floor or overhead. (2) How many circuits are available per Bay/Motors? 3 of 3 Existing Shelving Layout a. No Questions MISCELLANEOUS NOTES a. A site location plan is needed delineating contractor entrance and egress points at the center. b. Building entrance points for both material and personnel (contractor) should be more clearly del eated A ~ at some I oint in th ? n1 a n cc: a," 1ei~%~ V`.'.Cr) UZI C c. ontractor parking area/areas sho i eated 1 Alk/ ??a ` L""z1)AvFoi?lease : CIA-RDP74-00005R0001001 Sanitized - AQproved For Release : CIA-RDP74 00005R000100110023-7 d. Consideration should be given a site/building for the storage of salvage. If an open site is chosen vs. an enclosed building, weather conditions should be con- sidered. SPECIFICATIONS . 1. Site inspection for prospective bidders is covered in spec time, place, contact, etc. 2. Does on bay (motor) carry the load of pushing thee remaining bays - Are they synchronous in operation? 3. The number of test cycles needs to be spe1) pd out, What would a typical days use be? 4. Contractor shall notify the user -mays prior to starting test on mock-up. 5. Key components (motors, link belts, gears, pulleys, wheels, wheel bearings, relays, cords, switches, plugs, general chassis components) shall be visually inspected (without dis- assembly) for obvious signs of wear, deterioration or damage after the test cycle has been completed. This inspection shall be carried out by the user. 6. Size of mock-up actually depends on the basic working principal of the unit chosen. Under any and all circumstances, the motor/drive assembly should be tested under full scale load. The storage load may be simulated, however. The load imposed on the motor/drive unit by the actual structure and/or struc- turers of the storage assembly must hbt. be simulated. Sanitized - Approved For Release CIA-RDP74-00005R000100110023-7 Sanitized -proved For Release : CIA-RDP74-00005R000100110023-7 .7. Will the contractor have any problems as far as the delivery of materials to the site? - Security? Any problems with subcontractors? 8. The spec mentions the contractors responsibility for delivering 'prison-industry' shelving to the site - This material may already have been delivered to the site re f the contractor. 10. T'btere are some conflicting areas in regards to lead times for review of plans and mock-up. Part of the plan requi- sition possibly may be omitted in lieu of the mock-up provided by the contractor. 11. What exact items will the contractor personnel be re- quired to furnish, what form shall be used by these personnel? 12. Contractor should be notified that he should excercise Creme care in avoiding damage to delicate.equipment presently installed in the work spaces. 13...Escort requirements should be more clearly indicated in the security section of the spec. 14. Is a contractor quality control section needed in the spec? 15. Should a set 'reaction time' be included in the con- tractors warranty - Present wording calls for a'reasonable time, What is a reasonable time in an emergency? - In a routine repair matter? - What is routine. What is an emergency? Sanitized - Approved For Release : CIA-RDP74-00005R000100110023-7 Sanitized - Approved For Release : CIA-RDP74-00005R000100110023-7 16. The painting of damaged items/areas is covered in the paihting spec. 17. Should shelving ranges be 'opened' vs. 'cleared'? 18. The testing of the motor/drive/assembly should be con- tinuous from increment to increment completion; i.e., increment #1 should be tested during the construction of increment #2 - Test #1 and #2 during the construction of #3, etc. Testing should be considered complete at the end of testing increment #4 and final acceptance by user. This test should be a 1 week minimum. 19. The existing maintenance clause in the spec may not be essential. This maintenance clause could be separated into a separate bid item for other FY 71 funds. This would tend to simplify the contract in the eyes of the contractor. A main- tenance contract should not be required during the initial warrantee period - provided the warantee has a decent reaction time built in. 20. Is 30 f c sufficient illumination for the bottom shelf vs. 50 fc? 21.What should be the maximum? Motor/drive per circuit? Consideration should be given not only to electricity-fire safety hazards but also to personnel safety and also to a minimum down factor at and one time. Sanitized - Approved For Release --CIA-RDP74-00005R000100110023-7 AREAS PRESENT CAPACITY PROPOSED CAPACITY INCREASE (CUBIC FEET) PERCENT INCREASE INDIVIDUAL AREAS PERCENT INCREASE ENTIRE HOLDINGS EQUIPMENT COST TOTAL COSTS D & C 53,910 8 ,716 z 26,806 2- 2 50% 240 D & B 67,470 105,502 38,032 58% 35% $470,250 D & A 49,800 79,366 29,566 59% 27% C & B 57,000 79,666 22,666 4o% 21% C & A 39,330 53,530 14,200 31% 13% B & A 52,890 78,316 25,426 48% 24% CAPACITY CU. FT.) PERCE PERCENT EQUIPMENT TOTAL AREA PRESENT PROPOSED INCREASE INCREASE INCREASE COST COSTS INDIVIDUAL AREA ENTIRE HOLDINGS iDtt SECOND 32,190 53,276 21,086 65% 19% $271,050 FLOOR ADDITION C SECOND FLOOR 21,720 27,440 5,720 26% 5% 175,750 ORIGINAL IBn FIRST FLOOR 35,280 52,226 16,946 48% 160 270,900 ADDITION "A" FIRST 17,610 26,090 8,480 48% 8% 162,500 FLOOR ORIGINAL TOTALS 106,800 159,032 52,232 491 * INCLUDES A&E, INSPECTION, RENOVATION, AND OTHER COSTS. EML asec A4t 4-O m 58000100110023-7 Sanitized - AppnmB;d MOVEABLEE HELVING - AGENCY RECORDS CENTER Sanitized - Approved For Release : CIA-RDP74-00005R000100110023-7 or, m-POIN-O"O Sanitized - Aoproved For Re. ,.ase, Y?CIA- DP74-00005R000100110023,,7 Sanitized - Approved For Release : CIA-RDP74-00005R000100110023-7 Sanitized - Approved For Release : CIA-RDP74-00005R000100110023-7 Sanitized - Approved For Releas IA=RDP74-00005R000100110021-7 Sanitized - Aproved For Release : CIARDP74-00005R00 Sanitized - Approved For Release1: CIA-RDP74-00005R000100110023-7 Sanitized - AAOrtvec `hb'r Release`: CIA-RDP74-00005R000100110023-7 Sanitized - 'r K RDP74-00005ROO0100110023-7 Sanitized - Approved For Release : CIA-RDP74-00005R000100110023-7 ef~ N p w Sa iitized Aol1r6veo For Release: CIA-RDP74-00005R000100110023-7 25X1A5a1 Sanitized - Appr Sanitized - Approved For Release : CIA-RDP74-00005R000100110023-7 25X1A5a1 an'tize =6o /7' S3, y7~ z/,o~ 3s anitized - Approved For Release : CIA-RDP74-00005R000100110023-7 Sanitized - Appro d For Release : CIA-RDP74-OEW5R000100110023-7 iF -f 44.4~7 11 33 4 defiwf 3 C Y 9 d 13 .2 G OZ 0a 25X1A5a1 - va 9,? ? 00 ar 1 0 2 t3 71.0 ,:? Tcl13 qfo~j c~.a .ems. J y 4 IPA t3&ued, l? r/ 7?,, k COIAO 13 e . 7,, d a 9 ., 'a, v = 's ' S_ I-% Sanitized - Approved For Release : CIA-RDP74-00005R000100110023-7 Sanitized - Approy.;d For Release : CIA-RDP74-00W5R000100110023-7 S- J o f 4 1 8 Q' j. - JO 4Y /,& X,2a X47 x *dAcd lo at AD --3., X 3 :3 z 741 ca 0):&" faG?-3 ca a0 B Ad" 25X1A5a1 '3.3&/d 3- 9 /3ofz 77 &3/ 07 d 91Vr - ~_ Sanitized - Approved For Release: CIA-RDP74-00005R000100110023-7 ? JIZ- 4/3 Sanitized - Approved F2? : CI/RDP74-00005R000023-7 G~~ 5 b moo Sanitized - Approved For Release : CIA-RDP74-00005R000100110023-7 CI a-DFP~k-0);ffl>jboqoqO1 Sanitized - Approved r eleaso : I -RMF Z4-OOOn , 1001.100,23-7 -1/jam-'- - ~'CJ Z q ~, V~& 15 e or Release : CIA-RDP 4O &Ol OU110023-7 4 x` _.rr~~ f~. A-Z Sani oved For RDP7 -0 005R000100110023-7 OTV ~G s~ o00 79, 666 z~C~~ Sanitized - Approved For Release : CIA-RDP74-00005R000100110023-7