Request for Special Estimate of Civilian Petroleum Requirements, USSR and Satellites
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP75-00662R000100180016-8
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
1
Document Creation Date:
December 12, 2016
Document Release Date:
July 28, 1998
Sequence Number:
16
Case Number:
Publication Date:
October 31, 1952
Content Type:
MEMO
File:
Attachment | Size |
---|---|
![]() | 112.03 KB |
Body:
25X1A9a
STANDARD FORM NO. 64+ ' In
Approved For Release 20 0 I : A-RDP75- 001 x 016-8
[Elie s..' I"
Office iemor fld ? `UNITED STATES GOVERNMENT
Assistant Director, Research & Reports
DATE: 31 October 1952
FROM Chief, 1 aterials Division
SUBJECT: Request for Special Estimate of Civilian Petroleum Requirements,
USSR and Satellites
1. The Petroleum Branch has completed a rather heavy study of
civil requirements for the Soviet Bloc through fiscal year 1953. This
was done on the basis of both peace and war. The study was circulated
to members of the Petroleum Subcommittee of the EIC and discussed in
one or more meetings. The representative members of the other IAC
agencies were invited to make suggestions and present contributions.
There was some discussion but no assistance was forthcoming. It seemed
to be the consensus that the study was well done.
in the very near future. The branch program will be disrupted to some
extent during the last quarter of 1952, but not to any major extent.
This is the type of request that the Petroleum Branch is now becoming
prepared to take in its stride.
hat the terms of reference can be presented to the Petroleum Branch
done by 5 December in accordance with your memorandum. It is hoped
2. There are acknowledged weak points in the estimates and the
proposed research program should materially strengthen them? On the
basis of past analysis, the Petroleum Branch can extend the estimates
for fiscal 1954 under the assumption of a war beginning 1 July 1953-
We believe that such estimates will be adequate for WSEG. Unless the
ctual terms of reference contain some unforeseen requests, this can be
3. 1WJhereas the Petroleum Branch can prepare the estimates and
informally present them before the Petroleum Subcommittee of the EIC
for comments and suggestions and can incorporate any significant dif-
ferences of opinion, the Branch cannot assure a coordinated paper by
5 December or any specific date. It is therefore recommended that the
action be limited to informal comments and suggestions at the Petroleum
Subcommittee level and that the paper go forward as an ORR study. A
single member at the Subcommittee level or the EIC level could delay
formal coordination indefinitely and we are most hesitant to see the
Petroleum Branch placed in a position of completing the work on schedule,
but not being able to present it due to delay in the formal coordination
process*