FY 1973 FINANCIAL PROGRAM, FY 1974 BUDGET, AND FY 1975 THROUGH FY 1978 PLANNING

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP75B00159R000200010007-2
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
4
Document Creation Date: 
December 19, 2016
Document Release Date: 
November 15, 2006
Sequence Number: 
7
Case Number: 
Publication Date: 
March 21, 1972
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP75B00159R000200010007-2.pdf85.83 KB
Body: 
Approved For Release 2006/11/15: CIA-RDP75B00159R000200010007-2 Approved For Release 2006/11/15: CIA-RDP75B00159R000200010007-2 r oease 2006/11/15: CIA-RDP75B00159f-~000200010007-2 SECRET ? Copy of 2 1 MAIi 1972 MEMORANDUM FOR: Deputy Director for Science and Technology SUBJECT: FY 1973 Financial Program, FY 1974 Budget, and FY 1975 through FY 1978 Planning REFERENCE: Draft NRO Memo for D/CIA/RP dated 16 March 1972; Subject: Same as above, unsigned 25X1 25X1 25X1 1. As you recall, in August 1971 one of our U-2R aircraft at Edwards AFB was tr d ("loaned") to the USAF. This left us with a total of two at and two at Edwards. Significantly, 25X1 there was no reduction in our training requirement nor a change in our contingency commitment since the transferred aircraft could ostensibly be recovered on short notice in case of a deployment. 2. To plan for a deployment in which we are to meet a minimum response time, we should, ideally, have at least two opera- tionally ready OR aircraft available at all times. To meet commit- ments such as I uin which two aircraft must deploy on 25X1 short notice, a minimum of three aircraft are necessary. Possession of only two aircraft has precluded us from maintaining such a capabil- ity. Likewise, a minimal training level for aircrews has generally been maintained since last August. 3. In order to maintain a maximum capability within the limitations of our resources, it has been necessary to retain the maintenance crew previously assigned to the transferred aircraft. Even with the extra crew, weekend and overtime work has been required. Despite this, due to maintenance and inspection requirements since the aircraft was transferred, we have had 54 days during which only one aircraft was OR and on 5 days neither aircraft was OR. 253~~X1 Page 2 4. I believe we should continue to budget for this aircraft in CIA. This would allow us to at least be able to plan to pull the third aircraft back to the fleet, should it be necessary on a future deployment. 25X1 25X1 Brigadier General, US F Director of Special Activities 25X1 25X Approved For Releas1e T 2006/11/15 ~CL RD'7,B0015 000200010007-2 Page 3 SAS/O/OSA~ Distribution. 1 - DDS&T 2 - DDS&T 3 - DDS&T Registry 4 - D/ SA 5 - EO-COMPT/SA 6 - D/ M/ OSA 7 - D/O/OSA 8- SAS/O/OSA 9 - BF D/ OSA 10 - CMD/OSA 11 - IDEA/O/OSA 12 - RB / OSA 25X1 25X1 25X1 I (21 March 1972) 25X1 25X1 25X1