PROPOSED EPR FLUX FLIGHT TEST PROGRAM
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP75B00405R000100010016-9
Release Decision:
RIFPUB
Original Classification:
K
Document Page Count:
2
Document Creation Date:
November 11, 2016
Document Release Date:
September 23, 1998
Sequence Number:
16
Case Number:
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 67.83 KB |
Body:
Approved For Release 1999/09/07 :CIA-RDP75B00405R000100010016-9
PRO.POSLD uP??_~ LT7f ~i~IC:~~'.i' i-~T }'ROGP~:~`~i
~'~' ~- ~~'P-"s.3~ ~riRire
FLTOHT P.RC C ~; tJ^~,
A, Normal Pticl Control P?2ode
1. ihzrinu a t;lpical cliri.:'o, at B:-15~~ ft. and 665?C r'~T, chance `
altitude to straight and level. Stabilize for two (2} minutes
and record data for one;-half (2} :~v.nute. Take note of audible
sensations at all tim;s and descr~.be.
2. ':duce PLA to obtain 655?C :~T ar~d record transient data.
Sta'Oi.liGe Ln;;i ne for tiro (2} minutes and record data for one-
half (~-~} ~~.r~ute.
3. If an;;ire fluctuatio::s contin~,z~, reduce DLL until the condi-
tion is elimi.na,ed and r.;cord data.
~.. Reprat Para. ;~-1 to A-3 at 2000 i?t. intervals to max altitude.
B. I~.anual Gael Control 1Tode
1. At an altitnc., of ~+10~f ft., szv~tch from nornal to nanual fuel
control rccd~. Fopea,t Para. A--1 at 2000 ft. int?rvals.
Th: attached viable 1 pros,: =ts the instr^amentation rec,,uir~;d For the test pro-
grar~i, All data recording should be done at approx. rata of one (1} inch
per second oscillograph spsed. x.11 pressure measurements should include
quick response. close coupled transducers.
Approved For Release 1999/09/07 :CIA-RDP75B00405R000100010016-9
Approved For Release 1999/09/07 :CIA-RDP75B00405R000100010016-9
T iV 5 T i?.tT~~~ i~? Tr`. T I O V
Al ~itude
TestinS
Range
~ccurac
Recording
J]evice
Aitituda
t.L~
~ 4~
Photo
panel
TT2 ov
FAT oC
Nl % 0-? 10
i~2 ;~ 0-110
~ .~
~- ~ ?~
Fuel Pip ln].et Temp -5a-200oF
Fuel Control Inlet Temp -bs-200oF
i- 3oF
~. 3oF
PT2 D3Pv A 1.5-3.5
~p
Oscillograph
Psi PSIA 0-0
Pb PS:~~ 3..20
PT7 r'Hg A Stag c Tap 0-20
PSO r:~ A Loca-ced. o:~ outside cf 1.0-.3. ~
jet nozzle e.~tcnsion
EPk2 1. P4-~..0
FAT ? C 0-700
`rJf Pi ~ ~00-200
Primary. Gael '_'ressure 0-300n
Secondary ~~u~al Pressure O~100x
Pa~7 U'alve ~~.~o Slgnal Pressure O~uOc}~
~.{ 'el Pump Inlet Pressure 0--x'0
Fuel Put~.p interstage Pressure 0-200
~'uul Control l~zsa~aw~e Pressu.?:: 0-x;00:.
Fuel Control Tizrottle Val~7e p P 0-307,-
~`izel Control Shutoff Valve p P 0-250
~ 1000 Psi Pickup Necd~d for Sea Lovel Protection
Approved For Release 1999/09/07 :CIA-RDP75B00405R000100010016-9