DIARY NOTES

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP76-00183R000300010089-5
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
November 17, 2016
Document Release Date: 
August 16, 2000
Sequence Number: 
89
Case Number: 
Publication Date: 
March 11, 1958
Content Type: 
NOTES
File: 
AttachmentSize
PDF icon CIA-RDP76-00183R000300010089-5.pdf126.32 KB
Body: 
Approved For Reese 2000/09/08 76-00183ROQQ60010089-5 SOPTiff DIARY NOTES DDS 11 March 1958 25X1A 1. With Bob Macy attended a meeting in e to discuss the proposed revisions to certain NSCIDs. I think explanation sat- isfied Bob on most counts and that in all probability Mr. Brundage will not raise any questions at the next meeting of the National Security Council. 2. reported that at his recent meeting in Richmond with the State Highway Commissioner it was agreed that improvements to Route 123 would be started without further delay. Three separate contracts are going to be let: the first one will be for the purpose of four-laning that section of Route 123 between its intersection with the George Washington Memorial Parkway and the entrance to the CIA site; the second for the so-called McLean bypass which takes off from Route 123 at the entrance to the CIA site and goes behind Senator Kennedy's house, joining up with Route 123 again down the road; and the third for improvements to the existing Route 123 via the Langley fork which includes the controversial Scattergood and Thorne right-of-way. The National Park Service, supported by the Bureau of Public Roads, still refuse to allow the con- struction trucks to drive on the Parkway. However, they seem willing to make certain changes which will make available a large part of the Parkway to regular traffic; there- by taking the load off of Route 123. Yet to be settled is a proposal whereby the empty trucks en route from the site for another load use that section of the Parkway from its intersection with Route 123 to the site. 3. H. S. also reported that as a result of meeting with representatives of Harri- son & Abramovitz and the Public Buildings Service they now have the estimate down to one per cent (about $380, 000) of the amount which we had allowed for construction. This seems close enough and will no doubt be accepted by the Public Buildings Service as well as ourselves. He commented that Messrs. Johnston and Sella had advised him that they could not complete the final working drawings before 1 September. This would provide for the opening of bids on or about 17 December and the awarding of a contract within thirty days thereafter. (I briefed the Director on this and, of course, he was quite disappointed. He agreed to telephone Wally Harrison to see if anything could be done to expedite their work.) 4. Messrs. were in to discuss the Ramac (305) machine. They feel that the Logistics people are not only dragging their feet on the installation of this machine but that they would sabotage it if we insisted that they put it in. They are Approved For Release 2000/09/08 '1 & 76-00183R000300010089-5 f%r Approved For Release 2000/09/08 76-00183R00 010089-5 having another meetin on this matter next Thursday afternoon and I told John that I would talk to Messrs. prior to this session. This, I have done, and while Logistics is pessimistic about the machine, especially I do not find any deliberate footdlragging. However, it is incredible that with all of this ar- gument and misunderstanding going on they have not been able to get together for a meeting since November.) I talked to John again, advising him of my feeling in this connection, and said that I was not prepared to believe that the situation was all the fault of Logistics and thought it would serve a useful ur ose if re resentatives of his Staff and the Office of Logistics went to the and stayed there until they had sorted out the matter once and for all. 5 came up for his usual biweekly briefing and brought along Bob _Who r; e ec us on Project This Project seems to be going along 25X1A9a 25X1A9a 7. Discussed with the proposed transfer of to the Operations Coordinating Board. I told him that we were not anxious to see Don go on this job but that if he did so as far as I knew he would not have any re-employment rights in CIA. 25X1A2g 25X1A2g Approved For Release 2000/09/08 76-00183R000300010089-5