Trip and Progress Report -ATF-3 -Investigating the Use of Sand Castings - Arlington Bronze & Aluminum Corporation, Baltimore, Maryland

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-02820A000100080022-8
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 9, 2016
Document Release Date: 
April 27, 2001
Sequence Number: 
22
Case Number: 
Publication Date: 
August 29, 1956
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78-02820A000100080022-8.pdf116.02 KB
Body: 
Approved For Release 2001/07/16 : cIA-PrIP7R:6015qAo00l00060022-8 August 1956 25)(13pX1A9a Trip and Progress Report -ATP-3 - Invest ting the Use of Sand Castings - 25X1A 25X1A 25X1* 25X14 On 14 At 1956, was v te? 0 -ib it of cast for the ATP-3. also &oared to Obtain goner on the casting of small parts for future reference. 25X1A a formation it Mr. Sales Manager, and Mr. Geffney or rw ftsineering 25X1A y stated that on an order of our size (65 pieces tinge would be practical. Bowever, only three of the pieces, the frame block, the cover, and the case could be cast by this method. It was pointed out that, in general, the thinnest section economically feasible to sand cast was 3/16"; thinner sections would have to be machined.. All mounting surfaces would have 1/16" machining stock remaining and no windows or holes would be cast in the pieces. 3. The company indicated that the three pieces named above would cost somevhat less than $1000.00 in lots of 65 each. The quote is tentative and subject to revision based on finish ma- chine prints which we would have to provide. The above figure is very encouraging when savings in machine labor and tie-up are concidered, A breakdown of thie vote and all pertinent infor- mation on deliveries, alloy, etc., viii be presented in the ATP-3 program study now in preparation. 4. Laboratory pereonnel toured the plant accompanied by Mr. Hammond who explained the operation of the foundry, pattern shop, and metal finishing departments. The company vas processing nu- merous itemm for commercial aircraft and Government rocket work both, of which regains 100% X-ray analysis. The facilities Observed and the degree of complexity of the work in process, provide ade- ovate evidence of capability in terms of the ATP-3 vork. 5. The sand casting of the three major pieces vould still leave numerous smaller parts to be caapietely machined.. It was Approved For Release 2001/07/16: CIA-M8oi28ra00100080022-8 Approved For Release 2001/07/16 : CIA-RDP78-02820A000100080022-8 to nvetite investment castings (loss process) for se parts. To this end) three firm in the New York - Philadelphia areas were visited on a separate trip. Results are reported under separate cover. 25X1A9a Lab/DLC/rkb (29 August 1956) Distribution: Original -Addressee 1 - Monthly Reports- 1 - R&D/EP 1 - O&T 1 - R&D Chrono 1 - Dev/s Approved For Release 2001/07/16 : CIA-RDP78102820A000100080022-8