NOTICE: In the event of a lapse in funding of the Federal government after 14 March 2025, CIA will be unable to process any public request submissions until the government re-opens.

Monthly Report 1 Sept-30 September 1957 SYSTEMS ENGINEERING BRANCH ENGINEERING DIVISION

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-02820A000300020004-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
4
Document Creation Date: 
December 9, 2016
Document Release Date: 
May 18, 2001
Sequence Number: 
4
Case Number: 
Publication Date: 
September 30, 1957
Content Type: 
PERRPT
File: 
AttachmentSize
PDF icon CIA-RDP78-02820A000300020004-2.pdf145.08 KB
Body: 
Approved For Release 2001/07/28 : - 8- 02820A000300020004-2 b' ~3 -rte MONTHLY REPORT 1 September - 30 September 1957 SYSTEMS ENGThEERING BRANCH ENGThEERING DIVISION Project E-5500, Design of Signal Center Facility for New 25X1A6a Station, came to life for a brief period this month with a request from the Real Estate and Construction Division/LO for the project engineer to examine drawings of the space allocated to the Office of Communications in Building 35, which will house the Agency activity in lieu of Building 26. No changes are necessary in the layout in Building 35 as it is identical to the layout we submitted for Building 26 with the exception that we have gained additional office space. The plans were also examined by of the Signal Center Staff. 2. A contract has been negotiated with involving $121,850.64 for the procurement of Teletype equipment. 25X1A9a 25X1A5a1 3. NSA was visited twice during the last month, during which time discussions were held between members of the manufacturing section of that a e and Mr. of W-15. Basically we discussed the possibility of transferring small type manufacturing jobs to that agency for fabrication. We specifically discussed the possibility of NSA fabricating portable Recording Studios, Electronic Motor Stops, and Dial Door Locks. During a subsequent meeting, NSA informed us that it would be impractical for them to manufacture the Portable Recording Studio. However, they would give us price and delivery on the Electronic Motor Stop and the Dial Door Lock. NSA supplied us'with a model of their type door lock and we subsequently got an approval from Security to substitute for our present model. Arrangements are being made to order 26 of these units from NSA. No decision, however, had been decided on the Motor Stops. However, since NSA's prices are so low (direct labor and parts- no over-head) we expect to get most of our units that are manufactured from them at approximately half price. 25X1A9a 4. We are in the process of preparing a requisition for t _ 25X1A5a1 facture of 6 Portable Recording Studios with the Company. We expect delivery in approximately 2 mon s om the date of order placing. Approved For Release 2001/07/28 : CIA-RDP78-02820A000300020004-2 Approved For Release 2001/07/28 : Cl 5 ? of this Branch is currently spending time -S/PROT) on Electro-Magnetic Radiation T 25X1A9a briefings Reduction. 6. A Bill of Materials for Project - has been compiled and 25X1A2d1 forwarded to Materiel Support Branch. This list, which included 189 line items, was prepared in a period of seven days and turned over to MSB on 23 September. Since that date, the requisition has been made up and hand carried all the way through. As of this time, all items, except local puri$ases, have been checked out, packed and turned over to Transportation. Close liaison with the Technician who will install the equipment was maintained while compiling the Bill of Materials and he is very familiar with the requirements of the Project. 7. Project E-5020, Modification Work Orders: No Modification Work Orders were issued during this reporting period. 8. Project E-5085, Communications Systems Planning for New Head- quarters Building: No work was required on this project during this reporting period. 9. NEW PROJECTS E-5112 - Base Radio Station (Base I) E-5113 Thermocouples and Meters as used in the TAC-1 Antenna Tuner E-5111 Communications Link for E-5115 Standardization of VHF Mobile/AC Utility Transmitter-Receiver in the Range of 144 to 174 Megacycles 10. Ca4PLETED PROJECTS B-5050 Modification of the 16-F and 231-D Transmitters ll. SUSPENDED PROJECTS None 12. CANCELLED PROJECTS B-5363 Kuildings Maintenance TOTAL NUMBER OF PROJECTS REPORTED ON THIS MONTH Thirty-five Approved For Release 2001/07/28 02820A000300020004-2 25X1A9a Approved For Release 2001/07/28 : CIA-RDP78-0282OA000300020004-2 Approved For Release 2001/07/28 : CIA-RDP78-0282OA000300020004-2 Approved For Release 2001/07/?oCQP78-02820A0`0100300020004-2 ATTACHMENTS : Memorandum for the File, Subject: Navy D. F. Equipments Memorandum for the File, Subject: Thermocouples and Meters in the TAC-1 Antenna Tuner Memorandum for the Record, Subject: Trip to Memorandum for the File, Subject: Discussion of VHF Mobile Equipment with OC-O&T Memorandum for the File, Subject: Meeting with TSS on Mobile Equipment Projects and Activities of the September Monthly Report Approved For Release 2001/07/28 : CIA-RDP79-0282OA000300020004-2