Monthly Report 1 Sept-30 September 1957 SYSTEMS ENGINEERING BRANCH ENGINEERING DIVISION
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-02820A000300020004-2
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
4
Document Creation Date:
December 9, 2016
Document Release Date:
May 18, 2001
Sequence Number:
4
Case Number:
Publication Date:
September 30, 1957
Content Type:
PERRPT
File:
Attachment | Size |
---|---|
![]() | 145.08 KB |
Body:
Approved For Release 2001/07/28 : - 8- 02820A000300020004-2
b' ~3 -rte
MONTHLY REPORT
1 September - 30 September 1957
SYSTEMS ENGThEERING BRANCH
ENGThEERING DIVISION
Project E-5500, Design of Signal Center Facility for New
25X1A6a Station, came to life for a brief period this month with
a request from the Real Estate and Construction Division/LO for the
project engineer to examine drawings of the space allocated to the
Office of Communications in Building 35, which will house the Agency
activity in lieu of Building 26. No changes are necessary in the
layout in Building 35 as it is identical to the layout we submitted
for Building 26 with the exception that we have gained additional
office space. The plans were also examined by of the
Signal Center Staff.
2. A contract has been negotiated with involving
$121,850.64 for the procurement of Teletype equipment.
25X1A9a
25X1A5a1
3. NSA was visited twice during the last month, during which time
discussions were held between members of the manufacturing section of
that a e and Mr.
of W-15. Basically we discussed the possibility of
transferring small type manufacturing jobs to that agency for fabrication.
We specifically discussed the possibility of NSA fabricating portable
Recording Studios, Electronic Motor Stops, and Dial Door Locks. During
a subsequent meeting, NSA informed us that it would be impractical for
them to manufacture the Portable Recording Studio. However, they would
give us price and delivery on the Electronic Motor Stop and the Dial
Door Lock. NSA supplied us'with a model of their type door lock and we
subsequently got an approval from Security to substitute for our present
model. Arrangements are being made to order 26 of these units from NSA.
No decision, however, had been decided on the Motor Stops. However, since
NSA's prices are so low (direct labor and parts- no over-head) we expect
to get most of our units that are manufactured from them at approximately
half price.
25X1A9a
4. We are in the process of preparing a requisition for t _ 25X1A5a1
facture of 6 Portable Recording Studios with the
Company. We expect delivery in approximately 2 mon s om the date of
order placing.
Approved For Release 2001/07/28 : CIA-RDP78-02820A000300020004-2
Approved For Release 2001/07/28 : Cl
5
?
of this Branch is currently spending time
-S/PROT) on Electro-Magnetic Radiation
T
25X1A9a briefings
Reduction.
6. A Bill of Materials for Project - has been compiled and 25X1A2d1
forwarded to Materiel Support Branch. This list, which included 189
line items, was prepared in a period of seven days and turned over to
MSB on 23 September.
Since that date, the requisition has been made up and hand carried
all the way through. As of this time, all items, except local puri$ases,
have been checked out, packed and turned over to Transportation.
Close liaison with the Technician who will install the equipment
was maintained while compiling the Bill of Materials and he is very
familiar with the requirements of the Project.
7. Project E-5020, Modification Work Orders: No Modification Work
Orders were issued during this reporting period.
8. Project E-5085, Communications Systems Planning for New Head-
quarters Building: No work was required on this project during this
reporting period.
9. NEW PROJECTS
E-5112 - Base Radio Station (Base I)
E-5113 Thermocouples and Meters as used in the TAC-1 Antenna Tuner
E-5111 Communications Link for
E-5115 Standardization of VHF Mobile/AC Utility Transmitter-Receiver
in the Range of 144 to 174 Megacycles
10. Ca4PLETED PROJECTS
B-5050 Modification of the 16-F and 231-D Transmitters
ll. SUSPENDED PROJECTS
None
12. CANCELLED PROJECTS
B-5363 Kuildings Maintenance
TOTAL NUMBER OF PROJECTS REPORTED ON THIS MONTH
Thirty-five
Approved For Release 2001/07/28 02820A000300020004-2
25X1A9a
Approved For Release 2001/07/28 : CIA-RDP78-0282OA000300020004-2
Approved For Release 2001/07/28 : CIA-RDP78-0282OA000300020004-2
Approved For Release 2001/07/?oCQP78-02820A0`0100300020004-2
ATTACHMENTS :
Memorandum for the File, Subject: Navy
D. F. Equipments
Memorandum for the File, Subject: Thermocouples
and Meters in the TAC-1 Antenna Tuner
Memorandum for the Record, Subject: Trip to
Memorandum for the File, Subject: Discussion of
VHF Mobile Equipment with OC-O&T
Memorandum for the File, Subject: Meeting with
TSS on Mobile Equipment
Projects and Activities of the September Monthly
Report
Approved For Release 2001/07/28 : CIA-RDP79-0282OA000300020004-2