MONTHLY REPORT 1 December - 31 December 1958

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-02820A000400040048-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
4
Document Creation Date: 
December 12, 2016
Document Release Date: 
August 13, 2002
Sequence Number: 
48
Case Number: 
Publication Date: 
December 31, 1958
Content Type: 
PERRPT
File: 
AttachmentSize
PDF icon CIA-RDP78-02820A000400040048-1.pdf166.73 KB
Body: 
Approved For Release 2002/08/26 : CIA-RDP78-0282OA000400040048-1 25X1A9A 25X1A 25X1A6D 25X1A MONTHLY REPORT 1 December - 31 December 1958 SYSTEMS ENGINEERING BRANCH ENGINEERING STAFF 2. 0 did not accept the OL Real Estate and Construction Division's a proval of one additional 100 KW Diesel generator for the receiving site and, instead, requested the shipment of a 200 KW unit. The problem is now in the hands of RECD and they have queried0 by cable asking for a further justification. 3. Procurement action was initiated for the Selective Calling equipment which is to be used to provide an alarm feature for a two way radio-telephone system requested . We have received word, however, that there is a change in the require- representative who will be on TDY at Headquarters in early January and will further define the requirement. ment and procurement is being held up pending the arrival of a 4. Work continues on the redesign of the Tiny Tot for use with the Teletape System. In order to utilize the standard 8-inch key tape reel mounted on the cover of the encipher TD it will be necessary to provide a reperforator shelf that stands approximately 2 inches higher than existing shelves so that, when installed over the encipher TD, there will be sufficient room for the key to a container. Six of these new shelves are being built 25X1A 25X1A 25X1A 25X1A5A1 5. A visit was made to the to negotiate for 25X1A5A1 the procurement of approximately $260,000 worth of teletype equipment and to discuss our request for a quotation covering the development of an all mechanical tape combiner/printer. A. trip report is attached. Approved For Release 2002/08/26 : CIA-RDP78-0282OA000400040048-1 Approved For Release 2002/08/26 : CIA-RDP78-0282OA000400040048-1 equipment investigated in conjunction with Project II was prepare25X1A6 D and added to the existing study on VHF-UHF multiplex equipment. 7. At the request of OC-ED, an R.F. antenna/equipment patch panel 25X1A6A is being designed for the 0 radio station. The patch panel will be fabricated at Headquarters and shipped to thelonmiunicator 25X1A6A during February 1959. 8. An investigation was started to determine the cause of audio noise in the KL-7 and possible methods of reducing it. It was found that the major source of noise was caused by the print arm hitting against the print magnet solenoid. A G.R. 1551-A Sound Level Meter is being used in order to make more accurate sound level readings to determine the amount of noise generated by various components of the KL-7. 6. A chart outlining the characteristics of the UHF multiplex -pe 9. During this reporting d a conference was held with 25X1A5A1 I. Ag%Jy requirements for rour different LP antennas were discussed. These include a 55-600 me pouchable, indoor antenna; a 30-600 me collapsable outdoor antenna and a 60-600 me steel parabolic with an attached rim mounted 600-1000 me parabolic with 360? azimuth and 90? elevation control, both remotely operated. A prototype of the 55-600 me antenna has already been received and is now being evaluated by R&D. A proposal for an additional 5 each 55-600 me antennas and 5 each 30-600 me antennas has been received and is 25X1A5A1 now being studied. I --I was also requested to send us a quotation for supplying and installing two receiving and one transmitting Logarithmic Periodic antennas. These cover from 6.5 to 60 megacycles and will be installed They will be mounted on self-supporting masts, will be rotatable through 360? and controlled from within the station. 10. The Drafting unit has prepared 66 drawings of which 4 were forwarded to two field stations as part of ByBECI. 11. NEW PROJECTS 25X1 E-5117 - 25X1A6A E-5140 - Model 231-D Transmitter Pre-emphasis and Speech Clipping Modification E-5i49 - Communications Facilities 12. SUSPENDED PROJECTS 25X1A2D2 E-5350 - Approved For Release 2002/08/26 : CIA-RDP78-0282OA000400040048-1 25X1A6D Approved For Release 2002/08/26 : CIA-RDP78-02820A000400040048-1 13. INACTIVE PROJECTS E-5085 - Communications Systems Planning, New Building 25X1A6A E-5112 -E Base Radio Station E-5080 - mobile Message Center 25X1A6A E- 5126 -1 14. COMPLETED PROJECTS E-5147 - Receiving Antenna Patch Panel 15. ADMINISTRATIVE 25X1A9A 25X1A9A SUBMITTED BY : Chief, Systems Engineering Branch, OC-E Attachments: (Listed on the next Page) Approved For Release 2002/08/26-: ;QIA-RDP78-02820A000400040048-1 Approved For Release 2002/08/26 : CIA-RDP78-0282OA000400040048-1 25X1 C8A 1. 2. Memorandum to the File, SUBJECT: Report of Trip to Detroit, Mich., 3? and Mankato, Minn. 25X1A5A1 Memorandum for the File, SUBJECT: Report of Trip t to discuss possible further miniaturization of the CPC-2 `t'ra6X1A5A1 mitter-Receiver combination. L 25X1A6A Memorandum to the File, SUBJECT: Meeting with 5. Memorandum for the File, SUBJECT: Trip Report to 6. Memorandum to the File SUBJECT: Trip Report on Engineering y of New Station Sites 25X1A6A 7. Memorandum to the File, SUBJECT: Engineering Survey for the New Station Installation 25X1A6A 8. Memorandum to the File, SUBJECT: Trip Report 9. Projects and Activities of the December Monthly Report Approved For Release 2002/08/26 911 Ai DP78-02820A000400040048-1 25X1A6A