MONTHLY PROJECT REPORT

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-02820A000500020038-3
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
38
Document Creation Date: 
November 17, 2016
Document Release Date: 
September 4, 1998
Sequence Number: 
38
Case Number: 
Publication Date: 
April 30, 1959
Content Type: 
FORM
File: 
AttachmentSize
PDF icon CIA-RDP78-02820A000500020038-3.pdf2.18 MB
Body: 
Approved For Release 2000/09/11: CIA-RDP7402820A000500020038-3 (*hen filled In) MONTHLY PROJECT REPORT ,RIGTNATOR(S/ r ? OC-E BUDGET EST FY AMOUNT 1FUTuRE 1 1-ACTIVE PROJECT NUMBER PRIORITY CLASS x E-5010 PROJECT TITLE Receiving Antenna Multicoupler REPORTING PERIOD .1.30 April 1959 ACT I ON COMPLETED r CANCELLED PRIM'. RESPONSIBILITY EES -LSUSPENDED PROJECT ENGINEER PROJECT REQUIREMENT TO provide for OC requirements the best possible receiving antenna muiticompler. PROJECT DESCRIPTION To monitor the commercial and military developments in the field to determine If any of these multicauplers provided sufficient improvement to warrant replacing those now used in OC requirements. APPROVAL DATE , 1 March 1956 i - IREMARKS APPROVED BY WAB STARTING DATE 1 ZUne 1956 COMPLETION DATE April 1.959 During this reporting period, the i3.1 (Cu 565 OM has been added to the Office of Communications Equipment Standards list, and procurement has been initiated. These units viii cost $1250 each and delivery is expected to begin in December of 1959. With this actiOn project E-5010 is completed. CIPM RDP78-02820A000500020038-3 (20-421 Approved For4elease T1IARDP7820A0005000200383 Filled In MONTHLY PROJECT REPORT ORIGINATOR(S) OCA: BUDGET EST. REPORTING PERIOD 1 April - 30 April 1959 FY AMOUNT ACTION 1FUTURE ilACTIVE I COMPLETED FCANCELLED SUSPENDED PROJECT NUMBER E-5020 PROJECT TITLE Modification PRIORITY CLASS I PRIM. RESPONSIBILITX PROJECT ENGINEER FES Work Orders PROJECT REQUIREMENT To notify all field _ PROJECT DESCRIPTION Reproduce necessary Modification Work of distribution and stations of standard modifications to equipment. copies, assemble and prepare cover letters for all Orders. Obtain approval and coordination. Determine category forward to appropriate areas. APPROVAL DATE IAPPROVED BY 1 L ._ REMARKS MWO #29 "Tiny Tot Diplex Transmitter/Distributor Equipment Conversion prepared and is being MWO #30 "Modification of Tuning mance of the HT-4 Transmitter Frequency Range," will ents are known. MWO #5 "Installation of R-C Keying on each Audio corrected and all areas AJW /s/ STARTING DATE 8 February 55 COMPLETION DATE JJK /s/ and Associated Teletypewriter from Model "B" to Model "C", Mark II" has been composed for approval and publication. Unite TU-55 and TU-56 for Improving the Perfor- When Operating withii the 18-30 mcs. Extended be completed when stock numbers for required compon- Filter Network in P7715-A Adapter Plug for External Frequency Carrier Transmitter.Y A component error was notified. FORM 10. ? 1543 (20.42) Approved For Release 2000/09/11: CIA-RDP78-02820A000500020038-3 Approved For Release 2000/09/11: CIA-RDP79-02820A000500020038-3 Nee C E C 4n ;NI? ORIGINATORTir 00* 0C-0+T MONTHLY PROJECT REPORT BUDGET EST'FY REPORTING PEIOD AMOUNT 1-30 April 1959 0 FUTURE ACT I VE 0 CONIPLETED 0 CANCELLED o Sit5 P EN r PROJECT NUMBER PRIORITY CLASS Fe,5012.1 II PRIM. RSP. 133 PROJECT TITLE EF Development and Replacement Progrum IPRoJECT ENGINEER PROJECT REOUIREMENT 2b provide standard DF equipments of the following types to meet Agency requirements:. (a) 8emi-11=d HF, DF. (b) POrtable HF, DP. (e) Portable VHF, DF. (d) Close range, body type HF, PROJECT DESCRIPTION InT*Stlglit* military,FCC, and ecnemercial developments in the field of DP. Compile am/art on the latest development, including met, availability and specification and recommend equipments for standardisation. Should the investi- gation be mnfruitful, prepare specificatiOns for the development and manufacture of equipments to meet Communications requirements. APPROVAL DATE Nareh 1957 APPROVED }VW MY" STARTING DATE mrch 1957 The NSA AN/TRD-15 installation at is scheduled for completion in early May. il rangsu et ir een made with NSA to visit the installation on 15 May for an operational demonstration. Approved For Release 2900/p9/1,1 : FIA,-,R778-02820A000500020038-3 25)01 25X1A1 Approved For WR 200(.917trfilM-RDP74,02820A000500020038-3 MONTHLY PROJECT REPORT OR I CI NATOR IS FY OC -E BUDGET EST. AMOUNT REPORTING PERIOD 1 April - 30 April 1959 1ur TURE ? PROJECT NUMBER E-5037 PROJECT TITLE ii' ACTIVE PRIORITY CLASS II ACTION iI COMPLETED CANCELLED PRIM. RESPONSIBILITY Technical Bulletins FES I'SUSPENDED PROJECT ENGINEER PROJECT REQUIREMENT To keep the field supplied with current technical information pertinent to general operation. PROJECT DESCRIPTION Scan technical literature to determine and select items for field distribution, determine distribution category, reproduce required number of copies, prepare cover letter, arrange approval and coordination, and forward to appropriate areas. APPROVAL DATE REMARKS APPROVED BY MW /s/ JjK /s/ STARTING DATE COMPLETION DATE 2 February ' Field Handbook Numbers were assigned to all Technical Bulletins and this information was forwarded to all Areas and Divisions. The following Technical Bulletins have been published and distribution to all required recipients has been completed: TB 425 - "Performance and Design of Sloping Vee Antennas" TB 428 - "Field Alignment of Collins 514 Receiver using 100 kc. Oscillator as a Signal Generator" Technical Bulletin 427, "Extending Electron Tube Life with Tube Shields" will be published when manufacturer's details (now on request) are. received. FORM a43 Io- 58 I 4 Approved For Release 2000/09/11: CIA-RDP78-02820A000500020038-3 (20-42) Approved For Release 2000/09/11: CIA-RDP78-02820A000500020038-3 alimmowim (When Filled In) MONTHLY PROJECT REPORT ORIGINATOR(SI FY OC -E BUDGET [ST. AMOUNT IRTPORTINT PFRIOD 1-30 April 1959 1FUTURE IPROJECT NUMBER E-5041 PROJECT TITLE TACTIVE PRIORITY CLASS ACT ION r - COMPLETED I CANCELLLD L,0,eiN0.0 1 T 4 PRIM.. RESPONSIBILITY PROJEC INGINFF RT-4 Transmitter Repackaging PROJECT REQUIREMENT L. EES Improve the reliability and operation features of the RT-4 Transmitter and package it with a Portable Master Oscillator in a rack for base station use. PROJECT DESCRIPTION The RT-4 Transmitter was originally made for small station intermittent use. Operational use has revealed some technical discrepancies and the trans- mitter has been placed "on the shelf." This project will be to correct these discrepancies and to mount the transmitter and PM10 in the 4L, inch rack for base station use. The task of redesign will be given to a coniulting firm. A second firm will be given the task of compiling test data on a number of RT-4 Transmitters currently undergoing blower modification. This data will then be given to the first consulting firm. APPROVAL DATE APPROVED BY /WAB 28 February 1956 /_AT REMARKS I March 1956 A review of the evaluation reports which have been received indicates that the repackaged transmitter has met with general acceptance, the consensus of opinion being that the RT4A seems to have corrected all of the serious faults and most of the minor problems found in the original (RT-4). Ease of operation, "built-in" PMO, frequency stability, and expressed preference for the RT4A over the RT-4 are typical of the favorable comments. Adverse comment included such minor itens as location of the test key, time delay feature in series with door interlocks, and errors in the instruction manual. In order to determine a basis for proceeding effectively on this project, a memorandum has been sent to the Telecommunications, Training, and Techniques Staff of OC requesting guidance as to present and future requirements for the RT-4A. 1543 Approved For Release 2000/094011041A-RDP78-02820A000500020038-3 ORM Approved Forgplease2000/09/11 : CIA-RDP78-02820A000500020038-3 vow ammilmmommi*mmr.m.4.. f.I.PITHLY PROJECT;-?...PONT E-5053 3 C 1 t :13,0,,Li-Y r Tv CLASS rRim, EES URT-11 Power Supply Arcing 1730 April 1959 n c, - The filament winding of a high voltage ,transformer and the filter choke are arcing at the feed-through bushings. This project is to determine the cause of and corrective measures for this problem. -1 r45ClirPTIoN Preliminary investigation has indicated this arcing-over is not caused by insufficient voltage ratings of the components. It may be caused by a resonance. The problem will be turned over to a consulting firm for investigation and recommendations. Corrective measures for eliminating this probleln will be distributed as a Modification Work Order. AL DATE 15 September 1955 1 AppkovEL WAB /s/ TARTiNL, DATi. .. ----- -I 20 September 1955 r_ ' The first relay selected for switching of the transient eliminating exhibited a tendency to vary in pull-in time. Under some conditions the pull-in time was so quick that the swamping resistors were removed prior to the formation of the high voltage switching transcient, thereby negating the effect of the swamping circuit. A replacement relay with the proper pull-in time characteristics has been ordered and will be given a series of life tests during the next reporting period. Approved For Release 2000/09/11: CIA-RDP78-02820A000500020038-3 Approved For.15please 2000/09/11: CIA-RDP78,42820A000500020038-3 4161WW4m, (When Filled In) MONTHLY PROJECT REPORT 1 ORIGINATOR(S) OC -P HUDGET [Si FY AMOUNT REPORTING PERIOD 1 - 30 April 1959 iPROJECT TITLE IWUTURE PROJECT NUMBER .1IX [ACTIVE T PRIORITY CLASS ACT ION f COMPLETED .1 I I CANCELLED [ I SUSPENDED IPRIM. RESPONSIBILITY PROJEC1 ENGINEER Strategic Reserve Program PROJECT REQUIREMENT SDS ? To provide readily available transportable type package radio stations at convenient locations throughout the world for immediate installation and operational use in the event of an emergency, PROJECT DESCRIPTION To provide bills of materials for 2, 5, 10, 13, 15, and 20 position transportable type package radio stations with suggested floor plan layouts and standard wiring diagrams to provide efficient equipment utilization. APPROVAL DATE ? APPROVED DY Sept. 53 1 REMARKS WAB /8/ JUK /s/ 1S1ARTING DATI September 53 A memo from OC-P was received requesting 0C-13 to investigate the availability, cost, and procurement lead time of prefabricated shelters suitable for use with the packaged positions. Thin information was compiled and forwarded. The priority of other projects has prevented further work on other phases of the project. ' i5144PProved For Release 2000/09/1578:02820A000-5110720-0313-3 Approved For leas 2&OOTO9I1 : CIA-RDP78-02820A000500020038-3 MONTHLY PROJECT REPORT ORIGINATOR(S) DC-S BUDGET EST.FY AMOUNT REPORTING PERIOD 1 - 30 April 1959 El FUTURE KACTIVE 0 COMPLETED 0 CANCELLED 0 SUSPENDED PROJECT NUMBER E-5071 PRIORITY CLASS I PRIM. RSPN. SDS PROJECT ENGINEER PROJECT TITLE Tiny-Tot Electro-Magnetic Radiation Reduction PROJECT REQUIREMENT Reduction of the radio-magnetic radiiition to a maximum of 3 feet. PROJECT DESCRIPTION The present Tiny-Tot has detectable compromising electro-magnetic radiation up to 15 feet from the unit. Determine the radiation reduction by: shielding the magnets; reductions of magnet current; use of dumMy magnets wired in opposition to the normal field; and use of external masking elector-magnetic field. Radiation recordings to be made on an oscilliscope for comparative reduction by individual and combinations of methods. . APPROVAL DATE 29 October 1956 APPROVED NAB STARTING DATE COMPLETION DATE Egf 29 October 1956 ' The final multilith copies of MWO #29 are in the stage of final reading and approval. One photograph, yet to be added to complete the manual, will be taken Friday, I May. Final printed copies of MWO #29 will be ready for distribution to the field during the May reporting Period. Approved For Release i006/09911 CIX-RDP78-02820A000500020038-3 25XlM 25X1 K1A9a Appieved For Release 2000/09/11: CIA-14114378-02820A000500020038-3 ,??????????????????????????1?01.1111.1111111, VONTHLY?PROJECT REPORT ORIGINAToprs) QC_-O&T (Ata)___ ? 0 FUTURE X . BUDGET LST. _I FY. [NE*PoRTIN.7, PEkl0:1 1 30 APril 3939 COmPLETLD 0 CANCE.ELED PROJECT NumSER PR)OR1TY CLAS PPIm. RsPN. E_Tole PROJECT TITLE b Antenoa UNi:t.`, PROJECT REQuIPEmENT Prec,eat. ro:r;b.ft it ma iiaAuecii.tate for pnent frequency asoi6nments and antenna sy7,1 t),.; reviil for the prespat communication paths. PROJECT DESCRIPTION Desiax i1C!:.11tenne :Z te It:mitable directioaal character15ticLi for fluencie ;11) 1;) C Mc. Oct9ber 1956 ? A usserandwa was received fres a revision of the antenna fields at parties from OCAI and OC-0 will he study of the present situation at reactivated. STARTIN1:; DATE ? ComPLETI:JN DATE setting forth the requirements for Al 'forking sonnittee of interested sed to undertake a review and staff This project will consequently be Approved Forlakileagiail6444141.041101%. RDP78-02820A000500020038-3 25X1N 25X1AE 25X1AE Approved ForRelease2000/09/11 : CIA-RDP78-02820A000500020038-3 JECR:T 4, MONTHLY PROJECT REPORT , ORIGINATOP(S) BUDGET EST.F Y. AMOUNT REPORTING PERIOD 1 - 30 April 1.959 , 0 FUTURE go ACT I VE 0 COmPL E TED 0 CANCEL LED 0 SuspuNoLo PROJECT NUMBER E-5085 PRIORITY CLASS . I PRIM, RSPN. SDS PROJECT ENGINEER PPOJECT TITLE Communications Systems Planning for New Headquarters Building PROJECT REQUIREMENT To determine the types of CommUnications systems, and thequantities of equipment that will be required for installation in the new Headquarters Build- ing to meet Agency communications requirements. PROJECT DESCRIPTION , ' To investigate and compile information on net/ communications systems and equipment. To meet regularly with representatives of the Message Center Staff, Operations, Engineering, sad Security Divisions, and the OC member of the New Building Planning Staff to discuss communications requirements for the new building. To prepare a list of the equipment that will be required and suggested floor plans and equipment layouts defining spare requirements. ? iApPROVAL DATE APPROVED WAB /15/ STARTING DATE ComPLET/oN DATE 1 January 1957 January 1957 A memorandum was received from OC-T setting forth a requirement for a microwave link between the CIA Building at Langley, Virginia, and the NOMIONINOIBuilding, Washington, D. C. A study, including path profiles, will be made to determine the most feasible system to satisfy the requirements. 25X1A6a Approved For Release 201.miuoill ...,1pORLdia 8-02820A000500020038-3 25X1A Approved For Release 2$00/e9/1C 1 :fflAcRIT74412820A000500020038-3 MONTHLY PROJECT REPORT oct.M149?si Ms 00- .O&T BUDGET EST.Fr AMOUNT REPORTING PE-Ingo r 1-1Q April 1959 El FUTURE MI ACTIVE 0 COMPLETED 0 CANCELLED 0 SUSPENDED PROJECT NUMBER B.-.5089 PRIORITY CLASS I PRIM. RSPN. EES PROJEOT ENGINEER PROJECT TITLE Selective Calling Systems PROJECT REQUIREMENT To determine what type, if any, selective calling system cati'bis adapted:.for use in our overseas installations in order that stations maybe aleita4-4114740, ?. unattended watch periods of emergency situations. PROJECT DESCRIPTION , To investigate and compile a listing of all typet*of selective Calling . . systems with such information as purpose, operational, technical; and physical . _ characteristics, and cost. To select by operational and teehnical evaluations, if necessary, and recommend one of these systems be adopted. ? If approved, to implement procurement And installation. APPROVAL DATE December 1956 APPROVED WAD STARTING DATE January 1957 COMPLETION DATE? . JJK 0 During this reporting period, it was decided that all immediate beee,. sub-base selective calling requirements would be filled with Mbtorol?elcal.- Equipment. This decision was based upon the following: A) 06Mmercially available system B) Short delivery time, $ to 6 weeks C) Operationally proven, FAA Approved. D) Competitive price, $550 per encoder, $325 per decoder. Investrgation of an A-1 calling system has been suspended peal. (..,. ? further QC-T investigation of the need for such a systeml ... Approved For Release 2000/09/11: CIA-RDP78-02820A000500020038-3 EC fl ET Approved Foszo-Release 2000/09/11: CIA-RDP7402820A000500020038-3 ICC T MONTHLY PROJECT REPORT 0 --IBUDGET EST. y REPORT;NG PERIOD OC...4000-FT AMOUNT April_1959 f.-.1] FUTURE 8 ACTIVE 0 COMPLETED PRIORITY CLASS PRIM. RES _ RSPN. 0 CANcuLEJ 0USPENDED PROJECT ENGINEER ,,---------- 25X1A9 ! PROJECT NUMBERI E...5102 PROJECT TITLE Voice Link for 6-ST P:WJECT RE WIREMENT Ttoilde a voice link between the transmitter and receiver vans based on suggestions from operation r)R6JECT-6iSCRIPTION Design and install in the tvo 6-ST units currently at the ware- 25X A6a house a voice link capable of providing communication between the transmitter and receiver vans. The link should have the following capabilities: a. Bower output and range -approximately the MUX link. b. Be portable or work in conjunction with an extra portable unit. c. Work into the present MUX antenna system or provide a separate antenna system. Once the above is accomplished, a modification work order viii be published for the rework of the remaining 6-ST' s. 25X1A2d 1 APPROVED 4wAsk STARTING DATE /.7:IY/ MAY 1957 COMPLETION DATE An interstage low pass filter) with cut-off at 1,000 cps (UTC Model 1241-1000) has been requisitioned for installation in the VHF MUX Audio Circuit to prevent abrupt Changes in signal level from appearing at the modulator as high audio frequency signals. Procurement of the item will require from 30 to 60 daysvdme to the fact that it is not a stock item and must be obtained from a commercial source. Approved For Release 2000/09/11: CIA-RDP78-02820A000500020038-3 Approved FoOelease 2000/09/11: CIA-RDP78-Q2820A000500020038-3 (When Pi fled In. r AT OR (S) 4 OC -E opt_ J1( ; NUMBFR E -5103 qc.? CI ACT IVY MONTHLY PROJECT REPORT -T t SI .RI PuRT ING PI-R101) Y ,1 AMOUNT 1 30 April 1959 ArTON , COMPLETi ANC.' L. L ; PR IOR II Y CLASS 'PRIM. RESPONSIBILITY SDS Multiplex System for Base Station to Sub-Base Stations Communications I PL. MENT To provide a system of communications for base to sub-base operation to meet expanding communication commitments without extensive plant expansion. 1,1 R r ,N Investigate and compile a report on the practicability of utilizing multiplex equipment on staff circuits, formulate systems where utilization is practical and make comparison costs with systems currently in use where expansion is contemplated or in areas where'expanding communication commitments to staff circuits could Justify multiplex communications. ? .; V E. L!, ? May 1957 AW May 1957 An investigation will be made into single sideband multiplex systems which are currently available for utilization on the communications high frequencies. This project will be reported upon during the next reporting period. sit-Approved For Release 2000/09/1)P78-02820A000500020038-3 Approved For Release 2000/09/11: CIA-RDP7U2820A000500020038-3 GIMON??? (When Filled In) MONTHLY PROJECT REPORT ORIGINATOR(S) 0C-B BUDGET EST. REPORTING PERIOD 1-30 4'41 1959 FY 58 , 1--- I COMPLETED AMQUNT *5,000 ACT I ON FUTURE ACTIVE ' CANCELLED ISUSPENDED PROJECT NUMBER R-5105 PRIORITY CLASS 1 PRIM. RESPONSIBILITY ERB PROJECT ENGINEER PROJECT TITLE RT.4 Rxciter.Nbdification PROJECT REQUIREMENT Some of the HT4 transmitters do not have sufficient output from the exciter between 18 and 30 megacycles to drive the power amplifier to full output. PROJECT DESCRIPTION The exciter circuitry will be investigated to find methods of increasing its output in the 18 to 30 megacycle range. Any changes necessary will be , kept as simple as possible. An outside consulting firm may be called in on this problem if additional help is needed. When the exciter drive is increased to the proper level, modification kits will be made up to he used in conjunction with MAification Work Order NO. 7 (Revised). APPROVAL DATE August 1957 APPROVED BY STARTING. DATE August 1957 COMPLETION DATE REMARKS . Modification Work Order Number 30 (Optional) is complete except for the assignment of a stock number to the modification kit. , ? I543Approved For Release 2000/09/46041A6RDP78-028 0 313-J (20-42) ,X1C4a Approved For Release 2000/09/11: CIA-RDP78-V20A000500020038-3 (When Filled In) MONTHLY PROJECT REPORT oRiGINATOR(S) OC -E )JDGET EST. VAMOUNT _[REPORTING PERIOD 1 - 30 April 1959 IFUTURE PROJECT NUMBER E-5117 PROJECT TITLE ACT I ON [ACTIVE I 1 (OMPLETED L j CANCELLED [PRIORITY CLASS 'PRIM. RESPONSIBILITY 25X1A6a SDS ISUSPENDED PROJECT ENGINEER EngineeringDesign of Stations and Determination of Their Space Requirements 25x1A6a PRoJEC1 REQUIREMENT To design new radio stations for and to determine the power, space, and constructional requirements necessary for the installation of communications 5X1C44 facilities in PROJECT DESCRIPTION 25X194a uroectis for the purpose of supplying the ith Communications requirements in 25X1C4a constructed in the Americas Area and the engineering o new radio stations to be installed elsewhere in 25X1A6a 5X1A6d 3X1A6d 15X1A6 1X1A6ai 5X1A64 ;X1A6a1 '5X1A6 APPROVAL DATE I APPROVED BY GBG /s/ December 1958 REMARKS [STARTING DATE I December 1958 COMPLETION DATE The standard position was viewed by CC-AD personnel and minor changes were suggested. PRASE A: - No action on this station. PHASE B: - Inactive pending installation. Inintilli lu-*ng this reporting period. PHASE 0: Teletype wiring diagrams were dispatched to this PRASE Ds PHASE E; PHASE 7: PHASE G: - Transmitters and are being procured by NSB. antenna equipment for the new installation - Transmitters and antenna equipment for the new station are being procured by NSB. - Drawings showing air conditioning and door locations have been prepared for - The Project Engineer is leaving on TD Y to complete the station installation. ,R 15143Approved For Release 2000/09/1.111ilPPRDP78-02820A000500020038-3 ,2.-42) 25X 25X1 25X1 25X Approved For Release 2000/09/11: CIA-RDP78-02820A000500020038-3 Im, Ca FUTURE MONTHLY PROJECT REPORT BUDGET EST. Fr. AMOUNT 15 ACTIVE Q COMPLETED REPORTING PERIOD ArAll X959 0 CANCELLED CSuSPENDED X1A5a1 PROJECT TITLE Review of Present Converter field and Evaluation of Diversity Reception Systems PROJECT REQUIREMENT Review what is currently on the market to determine if there is an economically suitable replacement for the Northern 107 Model 2 Frequency Shift Con r. determine tke advent s or die es of space/frequency PROJECT DESC IPTIO Prepare a comparison chart of all Frequency Shift Conterters currently being produced, sun& as theNestrex 50-B0 TM CFA, Hoffman CV-116, Northern 107 and 174, etc., to determine whiCh is the most suitable unit to meet our requirements. To evaluate each converter in a diversity system. APPROVAL. DATE January 1958 APPROVED STARTING DATE February 1958 COMPLETION DATE The contractor has completed testing of all aonvertws with the exception of the Mbdel 50-B. Since the delay in delivery Of the 504 has been encountered, the contractor is proceeding with the reduction of accumulated data toward a final report. Latest information indicates thet the 50-3 converter with associated line Myer will be delivered on 15 Mly 1959. Approv820A000500020038-3 CCC9C 25X' 25X1, 25X 5X1 A9 Approved For Release 2000/09/1464116111278-02820A000500020038-3 (When Filled In) MONTHLY PROJECT REPORT oRiGiNAToRIsI WC? BUDGET EST. REPORTING PERIOD l.3.0 April 1959 FY AMOUNT , ACTION FANCELLED SUSPENDED 1FuTuRE X AcTiyf, 17cOMPLETED PROJECT NUMBER PRIOR TY CLASS PRIM. AESPOSSIBILITY PROJECT ENGINEER ?,..5123. 1 EES PROJECT TITLE. KY-1 'Voice Operated Relay PROJECT REQUIREMENT , Investigate the feasibility of installing a voice operated rely in the KY-11 , PROJECT DESCRIPTION ? A voice -operated relay will be fabricated At the R + D LO end will be given an evaluation on a KY-1 lir* between the office of the 6 DiC0 and NSA will be queried to find what work they have done Faong this line. APPROVAL DATE APPROVED I1Z StARTING DATE COMPLETION DATE January 1959 GBa I7X- -w .71140.ry 1959 R MARKS e No reply has been received /Praia the NSA engineete regarding what, if anything can be done to shorten the time delay experienced betveen the time the push-to-talk button:id depressed and the time the XY-1 is ready to pass intelligence. ismoorandwavill be fOiliarded to NSA in an effort to expedite their investigation. Further -progress on this project is dependent upon a favorable ropLy from. NSA. FORM FORM 10-SA "Jeelliqmi 5X3pproved For Release 2000/09/11: CIA-RDP78-02820A000500020038-3 (20- 42.1 5X1C4a Approved For Wease 2000/09/11 X : gailiPP78-40820A000500020038-3 PROji.CT RFPORT 1-30 April 1959 Aotenna :iystems for 25X1C4a rT-) provide an antenna system, wfth the receiving antenna(s) ? i)ei ? : by other offices, for communications nets installed in The antenna installation should perform efficiently rom the esthetic appearance of the building. To investigate and test various types of multicouplers, vertical antennas with associated tuning networks, 'both remotely operated and passive, and to determine the type multicoupler and antennas best suited to meet the applicable requirements. April 1956 rT?ry iTTV/ ART ING nATFI(MPF r oN fl 1 ! April 1958 i 25X1A5a1 Delivery of the antenna couplers has been delayed. Further activity on this project will be delayed pending receipt of the 25X1A5a1 " 1543 firomro Approved For Release 2000/09/11: CIA-RDP78-02820A000500020038-3 .1 ? ;X1A2d Approved FoLpelease 2000/09/11 ? CIA_-RDP7f42820A000500020038-3 E C .11 T ORIGINATORCS) 0C-SVEA MONTHLY ,PROJECT REPORT BUDGET EST. Tx. Aq0ONT 0 FUTURE OD ACTIVE 0 COMPLETED REPORTING PERIOD 1 - 30 April 1959 0 CANLEL LED 0 E ND F.) PROJECT NUMBER E.-5126 - ? - - PROJECT Ti TLE PRIORITY CLASS PRIM. RSPN. SDS - SPD Monitoring Station in.. PROJECT REQUIREMENT Tb provide engineering support for ProjectIIIIIII PROJECT ENG;Ncr, PROJECT DESCRIPTION Support required will consist of detailed systems engineering design for various communications facilities as requested by the cognizant divisions and the preparation of cost estimates, bills of materials and all necessary installation drawings. APPROVAL DATE April 1958 STARTING DATE April 1958 COMPLETION ''ATE Critical generator parts required by were hand carried by an electronics technician who departed during this period on a UT assignment to 25X1A6b Approved For Release 2000/09/11: CIA-RDP78-02820A000500020038-3 25X1) 25X1A 25X1i 25X1A 25X1i 25X1 Approved For&lease 200R/O9I1 : ChA-F78,W820A000500020038-3 MONTHLY PROJECT REPORT ORIGINATOR(S) 0C-E BUDGET EST.Fy. 59 AMOUNT 20,000 REPORTING PERIOD Aril 1959 ' El SUSPENDED _1-30 0 FUTURE %ACTIVE 0 COMPLETED 0 CANCELLED PROJECT NUMBER E-5131 PRIORITY CLASS 1 PRIM. ?RSPN. ERS PROJECT ENGINEER PROJECT TITLE modification of RS-1 PROJECT REQUIREMENT 25X1A6b Complaints were received from the field concerningfailures of the power crystal sockets., and waterproOfing of the RS-1, reference 57-1738, V31) 57-1042. PROJECT DESCRIPTION - " The newly designed power cable will be life tested to assure that it will sustain the operational stresses. A new crystal socket, which has been previously life tested, will be installed. A new pliobond seal will be used to increase the effectiveness of the waterproofing. An RS-1 will be removed from stock and the new parts and seal will be used to modify it. This project will culminate in the issue of a modification work order to all concerned treas. APPROVAL DATE July 1958 APPROVED STARTING DATE delay. COMPLETION DATE ? i July 1958 has caused another to begin the modification Fabrication of the crystal sockets A tentative date of 6 Nay has been set work. Approved For Release 2,000 9p1 ilCI-RipP78-02820A000500020038-3 Approved For _Release 2000/01101KelA-RDPN)2820A000500020038-3 1. (When Willed In) FY MONTHLY PROJECT REPORT BUDGET EST. AMOUNT .01.11?111?Me REPORTING PLRIOD 1 - 30 April 1959 1F1ITURE PPoJEcT NUMBER / PRoJJc E-5132 TITLE ACTIVE PRIORITY CLASS AT. T ION COMPLETED 1 I CANCELLED ? FPRIM. RESPONSIBILITY SDS Operating Positions for New Agent Transmission Systems Ro JfCT REOOIREMENT ISUSPENDEU PROJECT ENGINEER Incorporate necessary components into base station operating positions. I? I Of SCR I PT ION Design base station operating positions that will include equipment that will be needed to receive and translate high speed and/or other new forms of agent communication signals. OATE . APPROVE ; GING February 1959 I JJK MAI.,F STARTING E.ATF I February 1959 COMPLETION DATE The AS-3 receiving position will require modification to make it A241 compatible with ' agent transmissions. A study is being made to determine the feasibility of modifying the AS-3 receiving equipment for receiving F-1 as well as A-1 modes of trans- mission. foRm 1543 Approved For Release 2000/09/11 : CIA-RDP78-02820A000500020038-3 (20.421 25X1 25X1A9 Approved FoOelease 2000/09/11- : CIA-RDF'7W2820A000500020038-3 461116511. OC-c+T 58-766 F UTORF IPROJE C T NUMBER (Whe7,1 Filled In) MONTgLY'PROJECT REPORT . 8 UDGE! EST I mo LIN 7. AC t I ON R P 1 I F)) R 1 1-30 April 1959 ------- ENL IN) IR Modernization of 7 4 7!ontrol ranel Redesi the 77,14 Control Panel and fabricate 100 units. PRO)ECT DE I;CR IPT I nedesign the CP-4 control panel as a more efficieA unit and retuild from the start, using miniaturization techniques wherever possfae and pract1c4, icorporatinE features in the equipmeLt from experiece gained from prey:1.0,as models of the control panel. j?PPi,) A7C July 195P APPROV, /8 ,/ , !' I NC:, 1,1'44) July 1958 A bid was received from a manufacturer for the fabrication of five CP-5 Control Panels. .1 The price quoted is $308 is per unit for the prototypes. It has been requested that the same manufacturer quote a price for the fabrication of 50 to 100 units. They have agreed to supply this information. The requirement for 0 R.F. monitor oscillator has been cancelled. Instead, a transistorized side tone Oscillator will be designed and fabricated in a vector plug in unit. This unit will plug into the octal 8oc1c4provided in the CP-5 chassis, The necessary controls will be brought out to the CP-5 front panel. ' I Approved For Release 2000/09/1144ArapP78-02820A000500020038--3 Approved For Release 2000/09/11 : CIA-RDP74-02820A000500020038-3 0411ENNIalmi I ien F ! I erf .1n P E-5136 IT, At 1 IV} RIIY Cl MONTHLY PROJECT REPORT R rP{31 it I OD 1-30 April 1959,_ PI: !NA Pi p 7 Nt Maximum Cryptographic Part Alarm (MACPAL) - P1_l IPf Mi n Provide an alarm for the TSEC/KL-7 which will notify the operator when a pre-determined number of groups have been typed. The MACPAL should be an incandescent lamp which will light at 90 groups or 335 groups and which will continue to burn until the counter is re-set. July 1958 /GBG/ /JJK/ I July 1958 The contract for the fabrication of five AL-1 units was awarded. The successful bidder has been 'provided all necessary specifications, design information, and drawings. One KL-7 unit has been delivered to facilitate the design of the microswitch mounting bracket and for final testing of the AL-1. The manufacturer estimates 90 days for delivery of the five units. _Approved For Release 2000/09/11: CIA-RDP78-02820A000500020038-3 I543 alarsiiam ? ? 7, M Approved For ,Release 2000/09/11: CIA-RDPW2820A000500020038-3 MONTHLY PROJECT REPORT t ORIGINATOP1S) OC?E BUDGET EST. FY AMOUNT ID REPORTING PERIOD. 1 ILARr11 1959 CANCELLED 0 SUSPENDED ILD FUTURE 8 ACTIVE 0 COMPLETED PROJECT NUMBER PRIORITY CLASS PRIM-. RsPN. EES PROJECT ENGINEER I_ ---- PROJECT TITLE , Coaxial Output Network for the 231-D Transmitter ROJECT REQUIREMENT A coaxial output network, independent of the existing unbalanced output is required for the 231-D Transmitter. PROJECT DESCRIPTION _ The output circuit of the 231-D Transmitter will be investigated and a suitable network, with provisions for metering, will be designed and fabricated to accommodate coaxial fittings. The.existing outputs (i.e., unbalanced and balanced 600 ohm line feed) of this transmitter will not be affected. A modi- fication kit with instructions will be drawn up. APPROVAL DATE ..., 1 41111y 1958 APPROVED STARTING DATE Jul 19,8 COMPLETION DATE Requests for bids for the fabrication of KM-14e are being distributed by Logistics. The requests are asking for 30 day delivery on the first unit and 60 days delivery for the balance after acceptance of the first unit. 25X1 25X1, Approved For Release 2000/09/11: CIA-RDP78-02820A000500020038-3 n 1A5a1 Approved For Release 2000/09/11: CIA-RDP7402820A000500020038-3 MONTHLY PROJECT REPORT ORIGINATOR(S) CSD 8-517 BUDGET EST.FY AMOUNT 0 REPORTING PERIOD 1-30 April 1959 CANCELLED 0 SUSPENDED ? C3 FUTURE 8 ACTIVE 0 COMPLETED PROJECT NUMBER E-5138 PRIORITY CLASS I PRIM. RSPN? EES PROJECT TITLE Teletype Clear Text Alarm PROJECT REQUIREMENT A device is required which will detect the clear text word "CITE" when transmitted to a signal line." Upon detecting this word the device will provide a disabling circuit for the transmitter-distributor and an audible and/or visual alarm shall be given. PROJECT DESCRIPTION All signal lines are monitored by model-14 reperforators. Contact assemblies are available that are operated by the pull bars on the M-14. These contacts can be added so that they are operated by the space, C, I, To and E pull bars. These contacts can be used to control the Clear Text Alarm device. The Clear Text Alarm device will be either relay or diode operated and contain its own power supply. APPROVAL DATE August 1958 APPROVED STARTING DATE August 1958 COMPLETION DATE I I Two SSZ-5 electronic line monitors were received and evaluated. The unit is designed to give an alarm with either Pour Nark-space characters or eight monoalphabetic characters in sequence depending upon the mode of operation selected. TThe unit is designed for 60 W.P.M. operation and requires modification for 100 W.P.M. operation. The SSZ-5 does not completely satisfy our requirement for a teletype clear text alarm. is providing a type LS Sequential Line !!!!!!!I Bilelig on i for test And evaluation.' This unit will operate at either 60 or 100 W.P.M. can be preset for any desired sequence of characters. Time required for delivery is approximately two week*., -__ Approved For Release 2000/09/11: CIA-RDP78-02820A000500020038-3 Er T 25X1A '25X1A1 Approved For Release 2000/09/11: CIA-RDP7402820A000500020038-3 CECIIC T MONTHLY PROJECT REPORT ORIGINATOR(S) BUDGET EST. FY. AMOUNT RLPOR1!NG PER)0;) 0 FUTURE ACTIVE PROJECT TITLE Investigation of Possibility of Increasing the Speed of Teletype Staff Comiunications 1-34 April 1959 0 COMPLETED 0 CANCEL1ED N-L; PRIORITY CLASS 111111.11 PRIM.FSPN PROJECT REQUIREMENT To determine the maximum reliable transmission speed of Agency teletype staff circults.when using couNA.-ntior-al Fri( techniques. PROJECT DESCRIPTION Engineer a high speed radio teletype communication system and evaluate the operation of this system at speeds up to 300 wpm over an ionospheric path. Con- ventional FSK techniques are to be employed except that the shift may be optimized , for the speed actually transmitted. All equipments employA are to be commercially ! available items, however, modifications to the equipments are permitted. If possib1e,1 terminal equipments are to be selected which will operate at speede in excess of 300 wpm. The system should be compatible with existing facilities to the extent that no major change% in radio transmitting and receiving equipment will be requimi.! APPROVAL DATE Deceiber 1958 APPROVED STARTING DATE COMPLETi!.)N DATI During this reporting period, plans have been formulated for a field trip to determine the maximum reliable transmission speed of teletype circuits when using conventional FSK techniques. Tentative plans are, during 1, 1959, tests will be conducted between a 25X1A6 transmitting site located at and a mobile receiving facility located in the vicinity of Vincennes, Indiana, a path length of approximately 500 miles. Conventional frequency shift keying viii be utilised, and a Teletype Corporation High Speed TOpe System, modified for operation atApeeds of 3000240, and 180 words per minute, will be used as terminal equipment. The receiving van of a partially "stripped" 63T has been drawn from stock, and is being outfitted vith appropriate test and experimental equipment to serve as the receiver site. Personnel of IM B and SEB are cooperating in the effort to make the unit, including its tractor, ready for the trip. Preliminar1 tests of a modification to the electronic circuitry of the High Speed. Tape System to reduce its operating speed from the rated 600 WPM to our testing speeds have indicated no problem in this respect. Changes in the motor-to-drive shift gear ratio of the tape reader will enable the insertion of data at the proper rates. Approved For Release 2000/09/11: CIA-RD178-02820A000500020038-3 Aproved For Release 2000/09/11 : CIA-RDRZA-02820A000500020038-3 7 -?7 C 11CT. REPORTING PERIOD CI.COMPLETED? 0 CANCELLED c3 SUSPENDED ASS RIM. RSPN. ROJECT ENGINEER 5X1A5a 25X1 ntphae s and Bpeech Clipping Modification PRO ECT REQUIREMENT o iflOreaRe ihe average perceTtae ofmodaation Of the 231-D transmitter by vidizg. -tire aid and speech clipping circuits which will yield a wave- , a higher average paver to peak.amplitude ratio. PRo, CT SCRIP "R._ - ' is. 'sna speech clippingequipment (1 ea.) will be obtained from . the resPectiliilliiiiifliiiiiii111 paver Q e 4tiohArAtwill be obtained from a entire eh wifl then be installed and tested on a 231-0 trans- It test reaitlt5 axe favorable,additional as mblies will be purchased clAmAt to the 14 wherever dltetnect raegOisarz, ?R0vAL DATE TARTING DATE AUGUSTAUST 958 1958 COMPLETION DATE 5X1A5a etea dee*Ou of an asrptitier and all DOOSAISOrY 44) to accept the clipper waveform. Delivery made and evaluation of the io"bniti)r 1h4 b;::'speech clipper has Prove2i::::=7 t?Uhoa the need fora fey ii ion has blguns' minor changes hes been speech etorli al always will be eorporeted into the recent -tea se Approved ForR fease 2000/09/11': CIA-RDP78-02820A000500020038-3 atimmipmmiiimmErn 25X1 25X1/ 25X1i 25X1 Approved For Release 444211.140-02820A000500020038-3 MONTHLY PROJECT REPORT ORIGINATOR(S) 0C-0&T 58-807 BUDGET EST.Fy AMOUNT 0 REPORTING PERIOD 14'30 APril 1959 CANCELLED 0 SUSPENDED _ in FUTURE 8 ACTIVE 0 COMPLETED PROJECT NUMBER E.?5141 PRIORITY CLASS I PRIM. RSPN. EES PROJECT TITLE Device to Produce MIMIC Capabilities PROJECT REQUIREMENT Provide 15 my= present on the received It should also be Iftich Shquld control Units capable of determining when there is modulation signal and reproduce this modulation for rebroadcast. able to determine if the unmodulated carrier is present, the carrier of the MIMIC transmitter. . a prototype MIMIC Unit and make up manufacturing drawings. Test and evaluate prototype unit and obtain of production units. Distribute specifidations for a quantity of production units to fill OC require- PROJECT DESCRIPTION Design and construct specifications and approval for the manufacture and drawings for bids ments. 44aRovAL DATE AUGUST 1958 APPROVED ARTING DATE AUGUST 1958 to build COMPLETION DATE the et- ...: The manufacturer who -was given the contract CU-94 has started work on construction of the units. Delivery of completed units expected in approximately weeks. .., Approved For Release 210.2.9.41-...1 Tolgregaga-02820A000500020038-3 25X1 A! Approved For Release 20f3car lit.(i's 02820A000500020038-3 MONTHLY PROJECT REPORT ORIGINATOR(S) C3 FUTURE PROJECT NUMBER 3-5144 BUDGET EST. FY. AMOUNT go ACTIVE - 0 COMPLETED ?REPORTING, PERIOO 3.-30_April. 3959 0 CANCELLED 0 Si4SPENDED PRIORITY CLASS PR PROJECT RSPN. rROJECT ENGINEER I. PROJECT TITLE 00-SP Dna ELectronic Power Supply PROJECT REQUIREMENT TO fillarequirmeant for SP fora400 cycle 600 volt-amp. and 28 VIC 10 amp. dual electronicomer eupply. PROJECT DESCRIPTION To prepare specifications whieh willifulfill Srs requirements for 10 each portable &nal electronic power supplies. TO examine the proposals received to determine Which is best sated, taking into consideration veight, sik;effl efficiency, delivery time: and method of operation. TO monitor the fabrication of the production unite. To conduct tests on the pre-oproduction model to insure that it meets all specifications. 25X1 A9 PPROVAL DATE APPROVE TART1 S DATE . COMPLETION DAT. I i t i r , Work Continues 40 a satisfactory rate on the dual electronic power supply. Full load and over load tests of the engineering model have been conducted With excellent results, indicating that an effective circuit design has been realised. Fabrication of the prototype will begin as soon as the contractor completes all necessary tests required to determine compliance with all specifications. Approved For Release 200q1051/11 .i.(711:?77111 02820A000500020038-3 Approved FocRelease 2000/09/11: CIA-RDP7402820A000500020038-3 61.11161. HGINATORISI OC-E I FY (When Filled In) MONTHLY PROJECT REPORT BUDGET [ST . AMOUNT IREPORTINT PERIOD 1 - 30 April 1959 'FUTURE !fROJECT NUMBER 13.'5172 IPROJECT TITLE CTIVF [ PRIORITY CLASS AC C IN AI I- [ COMPLETED ' CANCELLED ; SUSPENDED ;PRIM. RESPENSIBILITY PROJECT ENGINEER SDS AS-6 Base Station Systems Design [PROJECT REQUIREMENT ? To design the base station antenna system and AS-6 equipment installation. I1T ;Uri DESCRIPTIDN The project will include the antenna design, equipment layout, installation drawings and preparation of a bill of materials to incorporate the AS-6 system into existing base stations. APPROVAL OAT! February 1959 nil MAPKS APPROVED BY NITATE 'COMPLETION DATE G33. February 1959 nor decided that the Base Station location for the AS-6 X1A6L1 will be 25X1A6b Installation plans are being drafted which will be forwarded to Chief) for review and comment. 25X1A6a Satisfactory tests between Los Angeles and the field unit located at were conducted during the last week in April. 5X1A64 -Tests between are scheduled to be conducted during the period 1-2314 op m , 54 pproved For Release 2D0D/09/1Uri1A-RDP78-02820A00-0-00-62-6038- S? ? Approved For Release 2000/09/11 : CIA-RDP7V2820A000500020038-3 (When Filled in OC -E !t-L! WoN1M;IR MONTHLY PROJECT REPORT -7 BUDGET EST NC PERIOD !Pr AMOUNT 1 1-30 _April 1959 211:1 ACT I VE I , ? ? PRIORITY CLASS ACTIUN COMPLFTED I CANCELLED IPRIM. RISPONSIDILITY Voice Frequency Carrier Telegraph Systems ISOSPENDED PPo k I R To improve the operation of our present voice frequency carrier (VFC) 25X1 A5a1 telegraph system investigate the feasibility of modifying this equlpment to provide 100 wpm operation and select a new "standard"100 wpm VFC eWPM,T40 5X1A9a Improve reliability of present Microwave and VHF MUX systems, particularly in respect to VFC channel frequency stability, for 60 wpm operation. 25) Investigate the possibility of adapting, by modification or substitution of components, present VFC equipment for 100 wpm teletype operation. Investigate commercial developments in the field of VFC telegraph systems to provide 12 or more 100 wpm teletype channels in a single voice frequency spectrum of itoo to 3,000 cps. Make appropriate recommendations to OC based on results of abo? ve investigatioss. APEEOVLI., OY - STEP INS 5AI; ;COML-115 ? An investigation has been made or the ommercial delielopments in the A field of VFC telegraph systems. Transistorised telegraph systems are being manufactured by Northern Radio, Lenkurt, and Tele-Signal. While all three systems are considered high quality, the Tele -Signal equipment has several features not found in the Northern or Lenkurt equipment. Some of these features are 1) self-contained power supply in each unit, 2) speeds up to 2500 WPM, 3) plug-in frequency determining network, 4) all adjustments on front panel and 5) proven reliability. The price of a twelve channel simplex system is approximately $5000. This is considerably less than competitive systems. 25X1 A6b Four channels of Tele-Signal equipment have been reiiiiioned; This equipment will be evaluated by EES and later shipped to Estimates have been received from . for modification kits to increase the operating speeds to 100 WPM and to increase reliability of our 25X1A5a1 presently installed Multiplex equipment. 5'4Approved For Release 2000/09/1DP78-02820A000500020038-3 25X1 P - Approved For Release 2000/09/11: CIA-RDP4-02820A000500020038-3 D T MONTHLY PROJECT REPORT PROJECt NUMBER Ewil73 * CONTINUED PRIM, RSPN% EES REPORTING PERIOD 1-30 April 1959 These Estimates were for: 100 Channels 13 each 200 Channels 348 each 400 Channels 316 each 600 Channels *298 each 1000 Channels $284 each These prices seem excessively high in comparison to new equipment designed to operate at 100 WPM. Upon receipt of test equipment now on order preliminary examinations will, be made to determine if operation of present equipment can be improved at a lover cost per channel. (1A9a X1A6a iX1A9a '.5X1A6b 5X1A6a ?5X1C4a Approved Fote5elease 2000/09/1144fRDP7t92820 (Whom Ft/tc/ /n) OC -E (I0,410 R IP.-51714. MONTHO PROJECT REPORT BUDGET' EST: 7REP1RTiNC, PERiOD AMOUNT 1959 1 - 30 April 1959 Ae r ION IVF I COMPLFTED (.7ANCELLFE ? PRIORITY CLASS !PRIM. RESPONSIBILITY FES General Engineering Support to all Communications Areas. NT- Same as Above quSPF NO ED Provide engineering representation and liaison with and Agency elements for new construction and relocation of ommun cat ons facilities not covered under other projects. Support is also to be given to the Area,lin providing general engineering information and resolving individual technical problems as required. 25X1A2d2 Records are to be maintained for Area Base and Field Stations reports and drawings 111111111 March 1959 25X' 1. A discussion was held between personnel of OC-E/SEB/FES and OLmRE&CD relative to new construction, a o . 25X1A61 opilogovements.erage and power retire AIM (REMO) will go to for six weeks se- 25X1A6a 25X1A6b 2. Details of a Logarithmic Periodic antenna to receive between 25X1A5a1 30 and 180 mos, designed and constructed by sent to Chief. Permission for installation at 25X1A for use by was requestid. 3. Assistance was given in regard to tenativelpians for the Installation of KW-26 e4tillithent-at the4 receiving station. 25X1) 5X1-Pk: 25X1( New UNION space requirements were coordinated with 00-MD. fications and a drawing was submitted to the 25X1C4a iiiiiiiiiiifor inclusion with their requirements on.I building plans. Chief, and OL-RELCD will be advised of these plans. 25X1A6b ?Rm 1543 8 Approved For Release 2000/09/ 11 ILIAC 25X1A6a 25X1A6a 25X1A6 15X1C4a 25X1A6a 25X1A6b Approved For Release 2000/09/11: CIA-RDP78-02820A ? .M14.1?????WMIlbeaae....1?Weome A.C7 NUMBER E..5174 l",,,,25X4A6b 150, 4;- 41911111/41 ;I"( MONTHLY PROJECT REPORT TPIM RSPN. 1 FES ri;t7n, PEFon 1 1 ? 30 April 1959 25X1A6b 25X1A6b 25X1A2d2 1. A request was sent to OL-BE&CD for selection of equipment to meet deh ? tion requirements of the warehouse in the proposed Headquarters building. Engineering will procure a s p the specified equipment for installation by the contractor. A memorandum to the file was prepared. 2. At a meeting held with Communicationsfloor learnedconstruction pir of the building will not be started by 31 Nisy as antici e n he field. Ardaechural drawings still require completion and 1111approval before contractual services can be solicited. A 30 kw diesel-generator was requisitionad and notification of delivery to the field in July was sent. Installation drawings were also forwarded. Preliminary details on the La Port tandem rhombic antenna were sent as requested. 25X1A2d2 Twelve correcteddrawings were sent for inclusion with MI records.. Semi-annual Engineering reporting forms were sent to all areas. pproved-FaRMassr-2t300109/4i--.-GIA-RDP-78-112.82GA000501142003a-3 ? Approved For Ulease 2000/09/1141:iRDP78-02820A0999.0001011At ?111r rIthen Filled In OC-P : ACT I vi: :FY MONTHLY PROJECT REPORT HUDGFT _ AMOUNT _AEI I ION OMELETED 1 CANCELLED IA I NAMRf,? PRIORITY CLASS 'PRIM RESPONSIBILITY JREPORrING PERIOD 1 1. - Aprt.3._ 1959 E-5175 25X16a m, Nit 25X1A6a Radio Station SDS ISUSPENDED I PROJECT ENGINEER EMMMMA 25; To formulate plans for the installation of a Radio Station at for use as a backup or in the event MEbecame inoperable. 25X1 6b Determine the magnitude of the station required; select suitable locations with sufficient land to accommodate a receiver and transmitter site; survey, clear, and grade sites as required; design and locate antennas, buildings, and necessary shelters; locate accessible water, power, and sewer mains; and prepare bill of materials. Actual phases of construction and operation will take place when required. 'STARTING BAEE May 1959 COMPLETION DATE Preliminary discussions have been held recently regarding the require- ments for this project. This project will be in the active status during the next reporting period. 1543 Approved For Release 2000/09/19011.44-RDP78-02820A000500020038-3 (2O-42) 25X1 K1 A9a ,X1A5a Approved For Release 2000/09/11: CIA-RDP78-02820A ' 3 , -- 'vier , , OC 8095 (When Filled In) MONTHLY PROJECT REPORT BUDGET F's( 1 AMOUNT IRIPOR.INC PERIOD 1 - 30 April 1959 HITURL PROJECT NUMBER E-5197 POJECT TITLE ACTIVE PRIORITY CLASS AU (IN r COMPLETED CANCELLED 1PRIM. RESPONSIBILITY Portable Emergency Broadcast Station pROA[c7?RirUUIREMEN-7 SDS 1 HSPENDEO 7 PROJECT ENGINIA'R To provide packages medium and shortwave 1 kilowatt broadcast stations for field use. PRDJECT OF 5CR (PT ION 1. Find a suitable 1 KW broadcast transmitter for the 535/1605 KC band. 2. Find a suitable 1 KW broadcast transmitter for the 2-26.1 MC band. 3. Find antennas useable in the 550/1600 KC band and supporting towers for dipoles in the 2-30 MC band. 4. Determine materials and accessories necessary for installation and operation of a complete broadcast station.and requisition these items. 5. Install and field test the stations near Washington, D. C. APPROVAL DATE 5pppnrn I OTART DAT( COMPLETION DATE January 1959 kFMARKS January 1959 pids e received on the transmitters and antenna coupler from and was selected as meeting all specifications. Their bids were: Antenna Coupler $ 1,070 Medium Wave Broadcast Transmitter 4 4,735 Short Wave Broadcast Transmitter $ 6,361 Variable Frequency Oscillator 4 1,047 A rough estimate on cost of a portable Butler building with flooring and a wood foundation is $1,500. A complete portable station including transmitter, building, generator, and other equipment would cost approximately $25,000. ? 1 543 Approved For Release 2000/09AMIA-RIXMVEttpAtO20038-3 i20-42) 25X1 A 25X1 A! 25X1 A6b Approved For Release 2000/09/11: CIA-RDP78-02820A0005000 aulM1111WErit. *11". ,c?5, T 5) XONTHLY PROJECT REPORT 11111[0C-O&T 0 FUTURE PROJECT NUMBER E-5386 PROJECT-T2E0(1 1 BUDGET EST ..FY. TREEORTING PERIOD I_ 1 ? 30 April 1959 I ACTIVE: AQOUNT 0 COMP L E TED Base Station Relocation PPIM. RSPN. SDS 0 CANCEE LEO 0 SuGPENDED PRoJECT REQUIREMENT Design a new transmitter and receiver facility because the resent transmit- ting and receiving facilities are housed in a Quonset Hut and respectively, and are inadequate for present circuit re uirements. The transmittin station _must_move in the near future to prmi PROJECT DESCRIPTION 25X1 25X1 25X1 C Future planning calls for the delimit Base ARM4iio be constructed on 25X1 C4a outside of the area. element between the field, Agency elements, and X1t elements. 25X1 We will act as the coordinating25 C 25X1 C4 25X1 C4a 25X1 C4a 25X1A9a PPRoYAL DATE September 1956 APPROVED wABJE3/ JJK Js/ STARTING DATE COMPLETION DATE September 1956 25X1 A6b Installation drawings for both the receiver and transmitter buildings have been completed. Installation schedule and equipment status reports have also been completed. Co les of the above dravin s and reports are being made for trauma to expect to t t e 11 Ma 5cflooj. na depart for around the 25th of May. will follow in approximately 3 months. 25X1A6b No construction progress reports have been received, via the MARE Resident Engineer, since March; however, it is assumed that installation of equipment and material may proceed in June 1959. C lotion date for the communications buildings is 30 June 1959, however, may occupy the buildings on a "beneficial occupancy" basis, prior to that date, without jeopardising our right to reject poor workmanship or correction of building defects. Approved For Release 2",111.1111661216P78-020?44pHORMAti.3 25X1N 25X1 A2d This project was originally started in September 1950 to prepare a bill of materials and associated drawings to cover the installation of a one man radio 25X1A6a station in It has been expanded to cover the installation and renovation of all one man stations. Using the one man station design as a guide, a complete bill of materials, associated drawings and installation specifications will be prepared according to the requirements of each particular station. APPROVAL DATE Approved For Release 2000/09/11 : CIA-RDP78-02820A000500- 'IGINATOTTS-) QC-0+T MONTHLY PROJECT REPORT BUDGET EST .r AmouNT 0 FuTuRE CO ACTIVE 0 COmPLETED REPOPTIN6 " 30 April 1959 0 CANCELLED PROJECT NUMBER E-5412 PRIORITY CLASS PRIM. RSPN. SDS PROJECT TITLE One Man Radio Station 0 PF,DJECT RE')UIREMENT Design a complete one an radio station to be used as a standard for the planning of all new one man stations or when renovating existing stations. PROJECT DESCRIPTION 25X1C4 September 1:256 APPROVED AJ W /h/ Ja is/ STARTING DATE September 1956)_ CompLEIta? During this reporting period the station was presented to various interested members of OC Staffs. Both favorable comments and constructure criticism vas received. From these comments and suggestions certain changes in the position were generated. These consist chiefly of equipment location and represent no major changes in the basic position. The specifications for the being written and will be completed in the near future. the contractor for the prototype, is presently engaged in producing the drawings and should be finished by approximately 6 May. I'slanped to ship the prototype to new during June 1959. Approved For Release--"' for installation at the 25X1 25X1A& 25X1A&