MONTHLY PROJECT REPORT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-02820A000500020038-3
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
38
Document Creation Date:
November 17, 2016
Document Release Date:
September 4, 1998
Sequence Number:
38
Case Number:
Publication Date:
April 30, 1959
Content Type:
FORM
File:
Attachment | Size |
---|---|
![]() | 2.18 MB |
Body:
Approved For Release 2000/09/11: CIA-RDP7402820A000500020038-3
(*hen filled In)
MONTHLY PROJECT REPORT
,RIGTNATOR(S/
r ?
OC-E
BUDGET EST
FY
AMOUNT
1FUTuRE 1 1-ACTIVE
PROJECT NUMBER PRIORITY CLASS
x
E-5010
PROJECT TITLE
Receiving Antenna Multicoupler
REPORTING PERIOD
.1.30 April 1959
ACT I ON
COMPLETED r CANCELLED
PRIM'. RESPONSIBILITY
EES
-LSUSPENDED
PROJECT ENGINEER
PROJECT REQUIREMENT
TO provide for OC requirements the best possible receiving antenna
muiticompler.
PROJECT DESCRIPTION
To monitor the commercial and military developments in the field to determine
If any of these multicauplers provided sufficient improvement to warrant
replacing those now used in OC requirements.
APPROVAL DATE
, 1 March 1956
i -
IREMARKS
APPROVED BY
WAB
STARTING DATE
1 ZUne 1956
COMPLETION DATE
April 1.959
During this reporting period, the i3.1 (Cu 565 OM
has been added to the Office of Communications Equipment Standards list,
and procurement has been initiated. These units viii cost $1250 each
and delivery is expected to begin in December of 1959. With this actiOn
project E-5010 is completed.
CIPM
RDP78-02820A000500020038-3
(20-421
Approved For4elease T1IARDP7820A0005000200383
Filled In
MONTHLY PROJECT REPORT
ORIGINATOR(S)
OCA:
BUDGET EST.
REPORTING PERIOD
1 April - 30 April 1959
FY
AMOUNT
ACTION
1FUTURE ilACTIVE I COMPLETED FCANCELLED
SUSPENDED
PROJECT NUMBER
E-5020
PROJECT TITLE
Modification
PRIORITY
CLASS
I
PRIM. RESPONSIBILITX PROJECT ENGINEER
FES
Work Orders
PROJECT REQUIREMENT
To notify all field
_
PROJECT DESCRIPTION
Reproduce necessary
Modification Work
of distribution and
stations of standard modifications to equipment.
copies, assemble and prepare cover letters for all
Orders. Obtain approval and coordination. Determine category
forward to appropriate areas.
APPROVAL DATE IAPPROVED BY
1
L ._
REMARKS
MWO #29 "Tiny Tot Diplex Transmitter/Distributor
Equipment Conversion
prepared and is being
MWO #30 "Modification of Tuning
mance of the HT-4 Transmitter
Frequency Range," will
ents are known.
MWO #5 "Installation of R-C
Keying on each Audio
corrected and all areas
AJW /s/
STARTING DATE
8 February 55
COMPLETION DATE
JJK /s/
and Associated Teletypewriter
from Model "B" to Model "C", Mark II" has been
composed for approval and publication.
Unite TU-55 and TU-56 for Improving the Perfor-
When Operating withii the 18-30 mcs. Extended
be completed when stock numbers for required compon-
Filter Network in P7715-A Adapter Plug for External
Frequency Carrier Transmitter.Y A component error was
notified.
FORM
10. ? 1543
(20.42)
Approved For Release 2000/09/11: CIA-RDP78-02820A000500020038-3
Approved For Release 2000/09/11: CIA-RDP79-02820A000500020038-3
Nee C E C 4n ;NI?
ORIGINATORTir
00* 0C-0+T
MONTHLY PROJECT REPORT
BUDGET EST'FY REPORTING PEIOD
AMOUNT 1-30 April 1959
0 FUTURE
ACT I VE 0 CONIPLETED
0 CANCELLED o Sit5 P EN r
PROJECT NUMBER PRIORITY CLASS
Fe,5012.1 II
PRIM. RSP.
133
PROJECT TITLE
EF Development and Replacement Progrum
IPRoJECT ENGINEER
PROJECT REOUIREMENT
2b provide standard DF equipments of the following types to meet Agency
requirements:. (a) 8emi-11=d HF, DF. (b) POrtable HF, DP. (e) Portable VHF,
DF. (d) Close range, body type HF,
PROJECT DESCRIPTION
InT*Stlglit* military,FCC, and ecnemercial developments in the field of DP.
Compile am/art on the latest development, including met, availability and
specification and recommend equipments for standardisation. Should the investi-
gation be mnfruitful, prepare specificatiOns for the development and
manufacture of equipments to meet Communications requirements.
APPROVAL DATE
Nareh 1957
APPROVED }VW
MY"
STARTING DATE
mrch 1957
The NSA AN/TRD-15 installation at is
scheduled for completion in early May. il rangsu et ir een made
with NSA to visit the installation on 15 May for an operational
demonstration.
Approved For Release 2900/p9/1,1 : FIA,-,R778-02820A000500020038-3
25)01
25X1A1
Approved For WR 200(.917trfilM-RDP74,02820A000500020038-3
MONTHLY PROJECT REPORT
OR I CI NATOR IS
FY
OC -E
BUDGET EST.
AMOUNT
REPORTING PERIOD
1 April - 30 April 1959
1ur TURE ?
PROJECT NUMBER
E-5037
PROJECT TITLE
ii'
ACTIVE
PRIORITY CLASS
II
ACTION
iI COMPLETED CANCELLED
PRIM. RESPONSIBILITY
Technical Bulletins
FES
I'SUSPENDED
PROJECT ENGINEER
PROJECT REQUIREMENT
To keep the field supplied with current technical information pertinent to
general operation.
PROJECT DESCRIPTION
Scan technical literature to determine and select items for field distribution,
determine distribution category, reproduce required number of copies, prepare cover
letter, arrange approval and coordination, and forward to appropriate areas.
APPROVAL DATE
REMARKS
APPROVED BY
MW /s/
JjK /s/
STARTING DATE COMPLETION DATE
2 February '
Field Handbook Numbers were assigned to all Technical Bulletins and this
information was forwarded to all Areas and Divisions.
The following Technical Bulletins have been published and distribution to
all required recipients has been completed:
TB 425 - "Performance and Design of Sloping Vee Antennas"
TB 428 - "Field Alignment of Collins 514 Receiver using 100 kc.
Oscillator as a Signal Generator"
Technical Bulletin 427, "Extending Electron Tube Life with Tube Shields"
will be published when manufacturer's details (now on request) are. received.
FORM a43
Io- 58 I 4
Approved For Release 2000/09/11: CIA-RDP78-02820A000500020038-3
(20-42)
Approved For Release 2000/09/11: CIA-RDP78-02820A000500020038-3
alimmowim
(When Filled In)
MONTHLY PROJECT REPORT
ORIGINATOR(SI
FY
OC -E
BUDGET [ST.
AMOUNT
IRTPORTINT PFRIOD
1-30 April 1959
1FUTURE
IPROJECT NUMBER
E-5041
PROJECT TITLE
TACTIVE
PRIORITY CLASS
ACT ION
r -
COMPLETED I CANCELLLD L,0,eiN0.0
1 T 4
PRIM.. RESPONSIBILITY PROJEC INGINFF
RT-4 Transmitter Repackaging
PROJECT REQUIREMENT
L. EES
Improve the reliability and operation features of the RT-4 Transmitter
and package it with a Portable Master Oscillator in a rack for base station
use.
PROJECT DESCRIPTION
The RT-4 Transmitter was originally made for small station intermittent
use. Operational use has revealed some technical discrepancies and the trans-
mitter has been placed "on the shelf." This project will be to correct these
discrepancies and to mount the transmitter and PM10 in the 4L, inch rack for base
station use. The task of redesign will be given to a coniulting firm. A
second firm will be given the task of compiling test data on a number of RT-4
Transmitters currently undergoing blower modification. This data will then
be given to the first consulting firm.
APPROVAL DATE APPROVED BY
/WAB
28 February 1956
/_AT
REMARKS
I March 1956
A review of the evaluation reports which have been received indicates
that the repackaged transmitter has met with general acceptance, the consensus
of opinion being that the RT4A seems to have corrected all of the serious
faults and most of the minor problems found in the original (RT-4). Ease of
operation, "built-in" PMO, frequency stability, and expressed preference for
the RT4A over the RT-4 are typical of the favorable comments. Adverse
comment included such minor itens as location of the test key, time delay
feature in series with door interlocks, and errors in the instruction manual.
In order to determine a basis for proceeding effectively on this project,
a memorandum has been sent to the Telecommunications, Training, and Techniques
Staff of OC requesting guidance as to present and future requirements for
the RT-4A.
1543 Approved For Release 2000/094011041A-RDP78-02820A000500020038-3
ORM
Approved Forgplease2000/09/11 : CIA-RDP78-02820A000500020038-3
vow
ammilmmommi*mmr.m.4..
f.I.PITHLY PROJECT;-?...PONT
E-5053
3 C 1 t
:13,0,,Li-Y
r
Tv CLASS
rRim,
EES
URT-11 Power Supply Arcing
1730 April 1959
n c,
-
The filament winding of a high voltage ,transformer and the filter choke are
arcing at the feed-through bushings. This project is to determine the cause of
and corrective measures for this problem.
-1 r45ClirPTIoN
Preliminary investigation has indicated this arcing-over is not caused by
insufficient voltage ratings of the components. It may be caused by a resonance.
The problem will be turned over to a consulting firm for investigation and
recommendations. Corrective measures for eliminating this probleln will be
distributed as a Modification Work Order.
AL DATE
15 September 1955 1
AppkovEL WAB /s/ TARTiNL, DATi.
..
----- -I 20 September 1955 r_
'
The first relay selected for switching of the transient eliminating
exhibited a tendency to vary in pull-in time. Under some conditions
the pull-in time was so quick that the swamping resistors were removed
prior to the formation of the high voltage switching transcient, thereby
negating the effect of the swamping circuit. A replacement relay with
the proper pull-in time characteristics has been ordered and will be
given a series of life tests during the next reporting period.
Approved For Release 2000/09/11: CIA-RDP78-02820A000500020038-3
Approved For.15please 2000/09/11: CIA-RDP78,42820A000500020038-3
4161WW4m,
(When Filled In)
MONTHLY PROJECT REPORT
1 ORIGINATOR(S)
OC -P
HUDGET [Si
FY AMOUNT
REPORTING PERIOD
1 - 30 April 1959
iPROJECT TITLE
IWUTURE
PROJECT NUMBER
.1IX [ACTIVE
T
PRIORITY CLASS
ACT ION
f COMPLETED .1 I
I CANCELLED [ I SUSPENDED
IPRIM. RESPONSIBILITY PROJEC1 ENGINEER
Strategic Reserve Program
PROJECT REQUIREMENT
SDS
? To provide readily available transportable type package radio stations at
convenient locations throughout the world for immediate installation and
operational use in the event of an emergency,
PROJECT DESCRIPTION
To provide bills of materials for 2, 5, 10, 13, 15, and 20 position
transportable type package radio stations with suggested floor plan layouts
and standard wiring diagrams to provide efficient equipment utilization.
APPROVAL DATE
? APPROVED DY
Sept. 53 1
REMARKS
WAB /8/ JUK /s/
1S1ARTING DATI
September 53
A memo from OC-P was received requesting 0C-13 to investigate the
availability, cost, and procurement lead time of prefabricated shelters
suitable for use with the packaged positions.
Thin information was compiled and forwarded.
The priority of other projects has prevented further work on other phases
of the project. '
i5144PProved For Release 2000/09/1578:02820A000-5110720-0313-3
Approved For leas 2&OOTO9I1 : CIA-RDP78-02820A000500020038-3
MONTHLY PROJECT REPORT
ORIGINATOR(S)
DC-S
BUDGET EST.FY
AMOUNT
REPORTING PERIOD
1 - 30 April 1959
El FUTURE KACTIVE 0 COMPLETED 0 CANCELLED 0 SUSPENDED
PROJECT NUMBER
E-5071
PRIORITY CLASS
I
PRIM. RSPN.
SDS
PROJECT ENGINEER
PROJECT TITLE
Tiny-Tot Electro-Magnetic Radiation Reduction
PROJECT REQUIREMENT
Reduction of the radio-magnetic radiiition to a maximum of 3 feet.
PROJECT DESCRIPTION
The present Tiny-Tot has detectable compromising electro-magnetic radiation
up to 15 feet from the unit. Determine the radiation reduction by: shielding the
magnets; reductions of magnet current; use of dumMy magnets wired in opposition
to the normal field; and use of external masking elector-magnetic field. Radiation
recordings to be made on an oscilliscope for comparative reduction by individual
and combinations of methods. .
APPROVAL DATE
29 October 1956
APPROVED
NAB
STARTING DATE
COMPLETION DATE
Egf
29 October 1956
'
The final multilith copies of MWO #29 are in the stage of final reading
and approval. One photograph, yet to be added to complete the manual, will
be taken Friday, I May.
Final printed copies of MWO #29 will be ready for distribution to the
field during the May reporting Period.
Approved For Release i006/09911 CIX-RDP78-02820A000500020038-3
25XlM
25X1
K1A9a
Appieved For Release 2000/09/11: CIA-14114378-02820A000500020038-3
,??????????????????????????1?01.1111.1111111,
VONTHLY?PROJECT REPORT
ORIGINAToprs)
QC_-O&T (Ata)___
?
0 FUTURE
X
. BUDGET LST.
_I FY. [NE*PoRTIN.7, PEkl0:1
1 30 APril 3939
COmPLETLD 0 CANCE.ELED
PROJECT NumSER
PR)OR1TY CLAS
PPIm.
RsPN.
E_Tole
PROJECT TITLE
b
Antenoa
UNi:t.`,
PROJECT REQuIPEmENT
Prec,eat. ro:r;b.ft it ma iiaAuecii.tate for pnent frequency asoi6nments and
antenna sy7,1 t),.; reviil for the prespat communication paths.
PROJECT DESCRIPTION
Desiax i1C!:.11tenne :Z te It:mitable directioaal character15ticLi
for fluencie ;11) 1;) C Mc.
Oct9ber 1956 ?
A usserandwa was received fres
a revision of the antenna fields at
parties from OCAI and OC-0 will he
study of the present situation at
reactivated.
STARTIN1:; DATE
?
ComPLETI:JN DATE
setting forth the requirements for
Al 'forking sonnittee of interested
sed to undertake a review and staff
This project will consequently be
Approved Forlakileagiail6444141.041101%. RDP78-02820A000500020038-3
25X1N
25X1AE
25X1AE
Approved ForRelease2000/09/11 : CIA-RDP78-02820A000500020038-3
JECR:T 4,
MONTHLY PROJECT REPORT
,
ORIGINATOP(S)
BUDGET EST.F
Y.
AMOUNT
REPORTING PERIOD
1 - 30 April 1.959
, 0 FUTURE go ACT I VE 0 COmPL E TED 0 CANCEL LED 0 SuspuNoLo
PROJECT NUMBER
E-5085
PRIORITY CLASS .
I
PRIM, RSPN.
SDS
PROJECT ENGINEER
PPOJECT TITLE
Communications Systems Planning for New Headquarters Building
PROJECT REQUIREMENT
To determine the types of CommUnications systems, and thequantities of
equipment that will be required for installation in the new Headquarters Build-
ing to meet Agency communications requirements.
PROJECT DESCRIPTION
, '
To investigate and compile information on net/ communications systems and
equipment. To meet regularly with representatives of the Message Center Staff,
Operations, Engineering, sad Security Divisions, and the OC member of the New
Building Planning Staff to discuss communications requirements for the new
building. To prepare a list of the equipment that will be required and suggested
floor plans and equipment layouts defining spare requirements.
?
iApPROVAL DATE
APPROVED WAB /15/
STARTING DATE
ComPLET/oN DATE
1 January 1957
January 1957
A memorandum was received from OC-T setting forth a requirement for a
microwave link between the CIA Building at Langley, Virginia, and the
NOMIONINOIBuilding, Washington, D. C. A study, including path profiles, will
be made to determine the most feasible system to satisfy the requirements.
25X1A6a
Approved For Release 201.miuoill ...,1pORLdia 8-02820A000500020038-3
25X1A
Approved For Release 2$00/e9/1C
1 :fflAcRIT74412820A000500020038-3
MONTHLY PROJECT REPORT
oct.M149?si
Ms 00- .O&T
BUDGET EST.Fr
AMOUNT
REPORTING PE-Ingo r
1-1Q April 1959
El FUTURE MI ACTIVE 0 COMPLETED 0 CANCELLED 0 SUSPENDED
PROJECT NUMBER
B.-.5089
PRIORITY CLASS
I
PRIM. RSPN.
EES
PROJEOT ENGINEER
PROJECT TITLE
Selective Calling Systems
PROJECT REQUIREMENT
To determine what type, if any, selective calling system cati'bis adapted:.for
use in our overseas installations in order that stations maybe aleita4-4114740,
?.
unattended watch periods of emergency situations.
PROJECT DESCRIPTION ,
To investigate and compile a listing of all typet*of selective Calling . .
systems with such information as purpose, operational, technical; and physical
. _
characteristics, and cost.
To select by operational and teehnical evaluations, if necessary, and
recommend one of these systems be adopted.
? If approved, to implement procurement And installation.
APPROVAL DATE
December 1956
APPROVED
WAD
STARTING DATE
January 1957
COMPLETION DATE? .
JJK 0
During this reporting period, it was decided that all immediate beee,.
sub-base selective calling requirements would be filled with Mbtorol?elcal.-
Equipment. This decision was based upon the following:
A) 06Mmercially available system
B) Short delivery time, $ to 6 weeks
C) Operationally proven, FAA Approved.
D) Competitive price, $550 per encoder, $325 per decoder.
Investrgation of an A-1 calling system has been suspended peal. (..,.
? further QC-T investigation of the need for such a systeml
...
Approved For Release 2000/09/11: CIA-RDP78-02820A000500020038-3
EC fl ET
Approved Foszo-Release 2000/09/11: CIA-RDP7402820A000500020038-3
ICC T
MONTHLY PROJECT REPORT
0 --IBUDGET EST.
y REPORT;NG PERIOD
OC...4000-FT AMOUNT
April_1959
f.-.1] FUTURE
8 ACTIVE
0 COMPLETED
PRIORITY CLASS
PRIM.
RES
_
RSPN.
0
CANcuLEJ 0USPENDED
PROJECT ENGINEER
,,----------
25X1A9
! PROJECT NUMBERI
E...5102
PROJECT TITLE
Voice Link for 6-ST
P:WJECT RE WIREMENT
Ttoilde a voice link between the transmitter and receiver vans based
on suggestions from operation
r)R6JECT-6iSCRIPTION
Design and install in the tvo 6-ST units currently at the ware- 25X A6a
house a voice link capable of providing communication between the transmitter
and receiver vans. The link should have the following capabilities:
a. Bower output and range -approximately the MUX link.
b. Be portable or work in conjunction with an extra portable unit.
c. Work into the present MUX antenna system or provide a separate
antenna system.
Once the above is accomplished, a modification work order viii be
published for the rework of the remaining 6-ST' s.
25X1A2d 1
APPROVED 4wAsk STARTING DATE
/.7:IY/ MAY 1957
COMPLETION DATE
An interstage low pass filter) with cut-off at 1,000 cps (UTC Model
1241-1000) has been requisitioned for installation in the VHF MUX Audio
Circuit to prevent abrupt Changes in signal level from appearing at the
modulator as high audio frequency signals. Procurement of the item
will require from 30 to 60 daysvdme to the fact that it is not a stock
item and must be obtained from a commercial source.
Approved For Release 2000/09/11: CIA-RDP78-02820A000500020038-3
Approved FoOelease 2000/09/11: CIA-RDP78-Q2820A000500020038-3
(When Pi fled In.
r AT OR (S)
4
OC -E
opt_
J1( ; NUMBFR
E -5103
qc.? CI
ACT IVY
MONTHLY PROJECT REPORT
-T t SI .RI PuRT ING PI-R101)
Y ,1 AMOUNT
1 30 April 1959
ArTON
, COMPLETi ANC.' L. L
;
PR IOR II Y CLASS 'PRIM. RESPONSIBILITY
SDS
Multiplex System for Base Station to Sub-Base Stations Communications
I PL. MENT
To provide a system of communications for base to sub-base operation to
meet expanding communication commitments without extensive plant expansion.
1,1 R r ,N
Investigate and compile a report on the practicability of utilizing
multiplex equipment on staff circuits, formulate systems where utilization
is practical and make comparison costs with systems currently in use where
expansion is contemplated or in areas where'expanding communication commitments
to staff circuits could Justify multiplex communications.
? .; V E. L!, ?
May 1957 AW
May 1957
An investigation will be made into single sideband multiplex systems
which are currently available for utilization on the communications high
frequencies. This project will be reported upon during the next reporting
period.
sit-Approved For Release 2000/09/1)P78-02820A000500020038-3
Approved For Release 2000/09/11: CIA-RDP7U2820A000500020038-3
GIMON???
(When Filled In)
MONTHLY PROJECT REPORT
ORIGINATOR(S)
0C-B
BUDGET EST.
REPORTING PERIOD
1-30 4'41 1959
FY
58
,
1--- I COMPLETED
AMQUNT
*5,000
ACT I ON
FUTURE ACTIVE
'
CANCELLED
ISUSPENDED
PROJECT NUMBER
R-5105
PRIORITY CLASS
1
PRIM. RESPONSIBILITY
ERB
PROJECT ENGINEER
PROJECT TITLE
RT.4 Rxciter.Nbdification
PROJECT REQUIREMENT
Some of the HT4 transmitters do not have sufficient output from the exciter
between 18 and 30 megacycles to drive the power amplifier to full output.
PROJECT DESCRIPTION
The exciter circuitry will be investigated to find methods of increasing
its output in the 18 to 30 megacycle range. Any changes necessary will be
, kept as simple as possible. An outside consulting firm may be called in on
this problem if additional help is needed. When the exciter drive is increased
to the proper level, modification kits will be made up to he used in conjunction
with MAification Work Order NO. 7 (Revised).
APPROVAL DATE
August 1957
APPROVED
BY
STARTING. DATE
August 1957
COMPLETION DATE
REMARKS .
Modification Work Order Number 30 (Optional) is complete except
for the assignment of a stock number to the modification kit.
,
?
I543Approved For Release 2000/09/46041A6RDP78-028 0 313-J
(20-42)
,X1C4a
Approved For Release 2000/09/11: CIA-RDP78-V20A000500020038-3
(When Filled In)
MONTHLY PROJECT REPORT
oRiGINATOR(S)
OC -E
)JDGET EST.
VAMOUNT
_[REPORTING PERIOD
1 - 30 April 1959
IFUTURE
PROJECT NUMBER
E-5117
PROJECT TITLE
ACT I ON
[ACTIVE I
1 (OMPLETED L j CANCELLED
[PRIORITY CLASS 'PRIM. RESPONSIBILITY
25X1A6a
SDS
ISUSPENDED
PROJECT ENGINEER
EngineeringDesign of Stations and Determination of Their Space Requirements
25x1A6a
PRoJEC1 REQUIREMENT
To design new radio stations for and to determine the power, space,
and constructional requirements necessary for the installation of communications
5X1C44 facilities in
PROJECT DESCRIPTION
25X194a
uroectis for the purpose of supplying the
ith Communications requirements in
25X1C4a constructed in the Americas Area and the engineering o new radio stations
to be installed elsewhere in
25X1A6a
5X1A6d
3X1A6d
15X1A6
1X1A6ai
5X1A64
;X1A6a1
'5X1A6
APPROVAL DATE I APPROVED BY
GBG /s/
December 1958
REMARKS
[STARTING DATE
I December 1958
COMPLETION DATE
The standard position was viewed by CC-AD personnel and minor changes
were suggested.
PRASE A: - No action on this station.
PHASE B: - Inactive pending installation.
Inintilli lu-*ng this reporting period.
PHASE 0: Teletype wiring diagrams were dispatched to this
PRASE Ds
PHASE E;
PHASE 7:
PHASE G:
- Transmitters and
are being procured by NSB.
antenna equipment for the new installation
- Transmitters and antenna equipment for the new station
are being procured by NSB.
- Drawings showing air conditioning and door locations have
been prepared for
- The Project Engineer is leaving on TD Y to complete
the station installation.
,R
15143Approved For Release 2000/09/1.111ilPPRDP78-02820A000500020038-3 ,2.-42)
25X
25X1
25X1
25X
Approved For Release 2000/09/11: CIA-RDP78-02820A000500020038-3
Im,
Ca FUTURE
MONTHLY PROJECT REPORT
BUDGET EST. Fr.
AMOUNT
15 ACTIVE Q COMPLETED
REPORTING PERIOD
ArAll X959
0 CANCELLED CSuSPENDED
X1A5a1
PROJECT TITLE
Review of Present Converter field and Evaluation of Diversity Reception Systems
PROJECT REQUIREMENT
Review what is currently on the market to determine if there is an
economically suitable replacement for the Northern 107 Model 2 Frequency
Shift Con r. determine tke advent s or die es of space/frequency
PROJECT DESC IPTIO
Prepare a comparison chart of all Frequency Shift Conterters currently
being produced, sun& as theNestrex 50-B0 TM CFA, Hoffman CV-116, Northern
107 and 174, etc., to determine whiCh is the most suitable unit to meet
our requirements. To evaluate each converter in a diversity system.
APPROVAL. DATE
January 1958
APPROVED
STARTING DATE
February 1958
COMPLETION DATE
The contractor has completed testing of all aonvertws with the
exception of the Mbdel 50-B. Since the delay in delivery
Of the 504 has been encountered, the contractor is proceeding with
the reduction of accumulated data toward a final report.
Latest information indicates thet the 50-3 converter with
associated line Myer will be delivered on 15 Mly 1959.
Approv820A000500020038-3
CCC9C
25X'
25X1,
25X
5X1 A9
Approved For Release 2000/09/1464116111278-02820A000500020038-3
(When Filled In)
MONTHLY PROJECT REPORT
oRiGiNAToRIsI
WC?
BUDGET EST.
REPORTING PERIOD
l.3.0 April 1959
FY
AMOUNT
,
ACTION
FANCELLED
SUSPENDED
1FuTuRE X AcTiyf, 17cOMPLETED
PROJECT NUMBER
PRIOR TY CLASS
PRIM. AESPOSSIBILITY
PROJECT ENGINEER
?,..5123.
1
EES
PROJECT TITLE.
KY-1 'Voice Operated Relay
PROJECT REQUIREMENT
,
Investigate the feasibility of installing a voice operated rely in
the KY-11 ,
PROJECT DESCRIPTION
?
A voice -operated relay will be fabricated At the R + D LO
end will be given an evaluation on a KY-1 lir* between the office of the
6 DiC0 and NSA will be queried to find what work they
have done Faong this line.
APPROVAL DATE
APPROVED I1Z
StARTING DATE
COMPLETION DATE
January 1959
GBa
I7X-
-w
.71140.ry 1959
R MARKS
e
No reply has been received /Praia the NSA engineete regarding what, if
anything can be done to shorten the time delay experienced betveen the
time the push-to-talk button:id depressed and the time the XY-1 is
ready to pass intelligence. ismoorandwavill be fOiliarded to NSA in
an effort to expedite their investigation.
Further -progress on this project is dependent upon a favorable
ropLy from. NSA.
FORM FORM
10-SA
"Jeelliqmi
5X3pproved For Release 2000/09/11: CIA-RDP78-02820A000500020038-3
(20- 42.1
5X1C4a
Approved For Wease 2000/09/11
X
: gailiPP78-40820A000500020038-3
PROji.CT RFPORT
1-30 April 1959
Aotenna :iystems for 25X1C4a
rT-) provide an antenna system, wfth the receiving antenna(s)
? i)ei ? : by other offices, for communications nets installed in
The antenna installation should perform efficiently
rom the esthetic appearance of the building.
To investigate and test various types of multicouplers, vertical antennas
with associated tuning networks, 'both remotely operated and passive, and to
determine the type multicoupler and antennas best suited to meet the applicable
requirements.
April 1956
rT?ry
iTTV/
ART ING nATFI(MPF r oN fl
1
! April 1958 i
25X1A5a1
Delivery of the antenna couplers has been delayed.
Further activity on this project will be delayed pending receipt of
the
25X1A5a1
" 1543 firomro
Approved For Release 2000/09/11: CIA-RDP78-02820A000500020038-3
.1 ?
;X1A2d
Approved FoLpelease 2000/09/11 ? CIA_-RDP7f42820A000500020038-3
E C .11 T
ORIGINATORCS)
0C-SVEA
MONTHLY ,PROJECT REPORT
BUDGET EST. Tx.
Aq0ONT
0 FUTURE
OD ACTIVE 0 COMPLETED
REPORTING PERIOD
1 - 30 April 1959
0 CANLEL LED 0 E ND F.)
PROJECT NUMBER
E.-5126
- ? - -
PROJECT Ti TLE
PRIORITY CLASS PRIM. RSPN. SDS
- SPD Monitoring Station in..
PROJECT REQUIREMENT
Tb provide engineering support for ProjectIIIIIII
PROJECT ENG;Ncr,
PROJECT DESCRIPTION
Support required will consist of detailed systems engineering design for
various communications facilities as requested by the cognizant divisions
and the preparation of cost estimates, bills of materials and all
necessary installation drawings.
APPROVAL DATE
April 1958
STARTING DATE
April 1958
COMPLETION ''ATE
Critical generator parts required by were hand carried by
an electronics technician who departed during this period on a UT
assignment to
25X1A6b
Approved For Release 2000/09/11: CIA-RDP78-02820A000500020038-3
25X1)
25X1A
25X1i
25X1A
25X1i
25X1
Approved For&lease 200R/O9I1 : ChA-F78,W820A000500020038-3
MONTHLY PROJECT REPORT
ORIGINATOR(S)
0C-E
BUDGET EST.Fy. 59
AMOUNT 20,000
REPORTING
PERIOD
Aril 1959 '
El SUSPENDED
_1-30
0 FUTURE %ACTIVE 0 COMPLETED 0 CANCELLED
PROJECT NUMBER
E-5131
PRIORITY CLASS
1
PRIM. ?RSPN.
ERS
PROJECT ENGINEER
PROJECT TITLE
modification of RS-1
PROJECT REQUIREMENT
25X1A6b
Complaints were received from the field concerningfailures of the power
crystal sockets., and waterproOfing of the RS-1, reference 57-1738,
V31) 57-1042.
PROJECT DESCRIPTION
- "
The newly designed power cable will be life tested to assure that it
will sustain the operational stresses. A new crystal socket, which has been
previously life tested, will be installed. A new pliobond seal will be used
to increase the effectiveness of the waterproofing. An RS-1 will be removed
from stock and the new parts and seal will be used to modify it. This project
will culminate in the issue of a modification work order to all concerned treas.
APPROVAL DATE
July 1958
APPROVED
STARTING DATE
delay.
COMPLETION DATE
?
i
July 1958
has caused another
to begin the modification
Fabrication of the crystal sockets
A tentative date of 6 Nay has been set
work.
Approved For Release 2,000
9p1 ilCI-RipP78-02820A000500020038-3
Approved For _Release 2000/01101KelA-RDPN)2820A000500020038-3
1. (When Willed In)
FY
MONTHLY PROJECT REPORT
BUDGET EST.
AMOUNT
.01.11?111?Me
REPORTING PLRIOD
1 - 30 April 1959
1F1ITURE
PPoJEcT NUMBER
/ PRoJJc
E-5132
TITLE
ACTIVE
PRIORITY CLASS
AT. T ION
COMPLETED 1 I CANCELLED
? FPRIM. RESPONSIBILITY
SDS
Operating Positions for New Agent Transmission Systems
Ro JfCT REOOIREMENT
ISUSPENDEU
PROJECT ENGINEER
Incorporate necessary components into base station operating positions.
I? I Of SCR I PT ION
Design base station operating positions that will include equipment that
will be needed to receive and translate high speed and/or other new forms
of agent communication signals.
OATE . APPROVE
; GING
February 1959 I JJK
MAI.,F
STARTING E.ATF
I February 1959
COMPLETION DATE
The AS-3 receiving position will require modification to make it
A241 compatible with ' agent transmissions.
A study is being made to determine the feasibility of modifying the
AS-3 receiving equipment for receiving F-1 as well as A-1 modes of trans-
mission.
foRm
1543
Approved For Release 2000/09/11 : CIA-RDP78-02820A000500020038-3
(20.421
25X1
25X1A9
Approved FoOelease 2000/09/11- : CIA-RDF'7W2820A000500020038-3
461116511.
OC-c+T 58-766
F UTORF
IPROJE C T NUMBER
(Whe7,1 Filled In)
MONTgLY'PROJECT REPORT
. 8 UDGE! EST
I mo LIN 7.
AC t I ON
R P 1 I F)) R 1
1-30 April 1959
-------
ENL IN) IR
Modernization of 7 4 7!ontrol ranel
Redesi the 77,14 Control Panel and fabricate 100 units.
PRO)ECT DE I;CR IPT I
nedesign the CP-4 control panel as a more efficieA unit and
retuild from the start, using miniaturization techniques wherever
possfae and pract1c4, icorporatinE features in the equipmeLt
from experiece gained from prey:1.0,as models of the control panel.
j?PPi,) A7C
July 195P
APPROV,
/8
,/
, !' I NC:, 1,1'44)
July 1958
A bid was received from a manufacturer for the fabrication of
five CP-5 Control Panels. .1 The price quoted is $308 is per unit for
the prototypes. It has been requested that the same manufacturer quote
a price for the fabrication of 50 to 100 units. They have agreed to
supply this information.
The requirement for 0 R.F. monitor oscillator has been cancelled.
Instead, a transistorized side tone Oscillator will be designed and
fabricated in a vector plug in unit. This unit will plug into the
octal 8oc1c4provided in the CP-5 chassis, The necessary controls
will be brought out to the CP-5 front panel.
' I Approved For Release 2000/09/1144ArapP78-02820A000500020038--3
Approved For Release 2000/09/11 : CIA-RDP74-02820A000500020038-3
0411ENNIalmi
I ien F ! I erf .1n
P
E-5136
IT,
At 1 IV}
RIIY Cl
MONTHLY PROJECT REPORT
R rP{31 it I OD
1-30 April 1959,_
PI: !NA Pi p 7 Nt
Maximum Cryptographic Part Alarm (MACPAL)
-
P1_l IPf Mi n
Provide an alarm for the TSEC/KL-7 which will notify the operator when a
pre-determined number of groups have been typed.
The MACPAL should be an incandescent lamp which will light at 90 groups
or 335 groups and which will continue to burn until the counter is re-set.
July 1958
/GBG/
/JJK/
I
July 1958
The contract for the fabrication of five AL-1 units was awarded.
The successful bidder has been 'provided all necessary specifications,
design information, and drawings. One KL-7 unit has been delivered to
facilitate the design of the microswitch mounting bracket and for final
testing of the AL-1.
The manufacturer estimates 90 days for delivery of the five units.
_Approved For Release 2000/09/11: CIA-RDP78-02820A000500020038-3
I543 alarsiiam
? ? 7, M
Approved For ,Release 2000/09/11: CIA-RDPW2820A000500020038-3
MONTHLY PROJECT REPORT
t
ORIGINATOP1S)
OC?E
BUDGET EST. FY
AMOUNT
ID
REPORTING PERIOD.
1 ILARr11 1959
CANCELLED 0 SUSPENDED
ILD FUTURE 8 ACTIVE 0 COMPLETED
PROJECT NUMBER
PRIORITY CLASS
PRIM-. RsPN.
EES
PROJECT ENGINEER
I_ ----
PROJECT TITLE
, Coaxial Output Network for the 231-D Transmitter
ROJECT REQUIREMENT
A coaxial output network, independent of the existing unbalanced output is
required for the 231-D Transmitter.
PROJECT DESCRIPTION
_
The output circuit of the 231-D Transmitter will be investigated and a
suitable network, with provisions for metering, will be designed and fabricated
to accommodate coaxial fittings. The.existing outputs (i.e., unbalanced and
balanced 600 ohm line feed) of this transmitter will not be affected. A modi-
fication kit with instructions will be drawn up.
APPROVAL DATE
...,
1 41111y 1958
APPROVED
STARTING DATE
Jul 19,8
COMPLETION DATE
Requests for bids for the fabrication of KM-14e are being distributed
by Logistics. The requests are asking for 30 day delivery on the first
unit and 60 days delivery for the balance after acceptance of the first
unit.
25X1
25X1,
Approved For Release 2000/09/11: CIA-RDP78-02820A000500020038-3
n
1A5a1
Approved For Release 2000/09/11: CIA-RDP7402820A000500020038-3
MONTHLY PROJECT REPORT
ORIGINATOR(S)
CSD 8-517
BUDGET EST.FY
AMOUNT
0
REPORTING PERIOD
1-30 April 1959
CANCELLED 0 SUSPENDED
?
C3 FUTURE 8 ACTIVE 0 COMPLETED
PROJECT NUMBER
E-5138
PRIORITY CLASS
I
PRIM. RSPN?
EES
PROJECT TITLE
Teletype Clear Text Alarm
PROJECT REQUIREMENT A device is required which will detect the clear text word
"CITE" when transmitted to a signal line." Upon detecting this word the device
will provide a disabling circuit for the transmitter-distributor and an audible
and/or visual alarm shall be given.
PROJECT DESCRIPTION
All signal lines are monitored by model-14 reperforators. Contact assemblies
are available that are operated by the pull bars on the M-14. These contacts
can be added so that they are operated by the space, C, I, To and E pull bars.
These contacts can be used to control the Clear Text Alarm device. The Clear
Text Alarm device will be either relay or diode operated and contain its own
power supply.
APPROVAL DATE
August 1958
APPROVED STARTING DATE
August 1958
COMPLETION DATE
I I
Two SSZ-5 electronic line monitors were received and evaluated.
The unit is designed to give an alarm with either Pour Nark-space
characters or eight monoalphabetic characters in sequence depending
upon the mode of operation selected. TThe unit is designed for 60 W.P.M.
operation and requires modification for 100 W.P.M. operation. The SSZ-5
does not completely satisfy our requirement for a teletype clear text
alarm.
is providing a type LS Sequential Line
!!!!!!!I
Bilelig on i for test And evaluation.' This unit will
operate at either 60 or 100 W.P.M. can be preset for any desired
sequence of characters. Time required for delivery is approximately
two week*.,
-__
Approved For Release 2000/09/11: CIA-RDP78-02820A000500020038-3
Er T
25X1A
'25X1A1
Approved For Release 2000/09/11: CIA-RDP7402820A000500020038-3
CECIIC T
MONTHLY PROJECT REPORT
ORIGINATOR(S)
BUDGET EST. FY.
AMOUNT
RLPOR1!NG PER)0;)
0 FUTURE ACTIVE
PROJECT TITLE
Investigation of Possibility of Increasing the Speed of Teletype Staff Comiunications
1-34 April 1959
0 COMPLETED 0 CANCEL1ED N-L;
PRIORITY CLASS
111111.11
PRIM.FSPN
PROJECT REQUIREMENT
To determine the maximum reliable transmission speed of Agency teletype staff
circults.when using couNA.-ntior-al Fri( techniques.
PROJECT DESCRIPTION
Engineer a high speed radio teletype communication system and evaluate the
operation of this system at speeds up to 300 wpm over an ionospheric path. Con-
ventional FSK techniques are to be employed except that the shift may be optimized ,
for the speed actually transmitted. All equipments employA are to be commercially !
available items, however, modifications to the equipments are permitted. If possib1e,1
terminal equipments are to be selected which will operate at speede in excess of
300 wpm. The system should be compatible with existing facilities to the extent
that no major change% in radio transmitting and receiving equipment will be requimi.!
APPROVAL DATE
Deceiber 1958
APPROVED
STARTING DATE
COMPLETi!.)N DATI
During this reporting period, plans have been formulated for a field trip
to determine the maximum reliable transmission speed of teletype circuits when
using conventional FSK techniques.
Tentative plans are, during 1, 1959, tests will be conducted between a
25X1A6 transmitting site located at and a mobile receiving facility located in
the vicinity of Vincennes, Indiana, a path length of approximately 500 miles.
Conventional frequency shift keying viii be utilised, and a Teletype Corporation
High Speed TOpe System, modified for operation atApeeds of 3000240, and 180
words per minute, will be used as terminal equipment.
The receiving van of a partially "stripped" 63T has been drawn from stock,
and is being outfitted vith appropriate test and experimental equipment to
serve as the receiver site. Personnel of IM B and SEB are cooperating in the
effort to make the unit, including its tractor, ready for the trip.
Preliminar1 tests of a modification to the electronic circuitry of the
High Speed. Tape System to reduce its operating speed from the rated 600 WPM
to our testing speeds have indicated no problem in this respect. Changes
in the motor-to-drive shift gear ratio of the tape reader will enable the
insertion of data at the proper rates.
Approved For Release 2000/09/11: CIA-RD178-02820A000500020038-3
Aproved For Release 2000/09/11 : CIA-RDRZA-02820A000500020038-3
7 -?7 C 11CT.
REPORTING PERIOD
CI.COMPLETED? 0 CANCELLED c3 SUSPENDED
ASS RIM. RSPN.
ROJECT ENGINEER
5X1A5a
25X1
ntphae s and Bpeech Clipping Modification
PRO ECT REQUIREMENT
o iflOreaRe ihe average perceTtae ofmodaation Of the 231-D transmitter
by vidizg. -tire aid and speech clipping circuits which will yield a wave-
,
a higher average paver to peak.amplitude ratio.
PRo, CT SCRIP "R._
-
' is. 'sna speech clippingequipment (1 ea.) will be obtained from .
the resPectiliilliiiiifliiiiiii111
paver Q e 4tiohArAtwill be obtained from
a entire eh wifl then be installed and tested on a 231-0 trans-
It test reaitlt5 axe favorable,additional as mblies will be purchased
clAmAt to the 14 wherever dltetnect raegOisarz,
?R0vAL DATE TARTING DATE
AUGUSTAUST 958 1958
COMPLETION DATE
5X1A5a
etea dee*Ou of an asrptitier and all DOOSAISOrY
44)
to accept the clipper waveform. Delivery
made and evaluation of the
io"bniti)r 1h4 b;::'speech clipper has Prove2i::::=7
t?Uhoa the need fora fey
ii ion has blguns' minor changes hes been speech
etorli al always will be eorporeted into the
recent -tea se
Approved ForR fease 2000/09/11': CIA-RDP78-02820A000500020038-3
atimmipmmiiimmErn
25X1
25X1/
25X1i
25X1
Approved For Release
444211.140-02820A000500020038-3
MONTHLY PROJECT REPORT
ORIGINATOR(S)
0C-0&T 58-807
BUDGET EST.Fy
AMOUNT
0
REPORTING PERIOD
14'30 APril 1959
CANCELLED 0 SUSPENDED
_
in FUTURE 8 ACTIVE 0 COMPLETED
PROJECT NUMBER
E.?5141
PRIORITY CLASS
I
PRIM. RSPN.
EES
PROJECT TITLE
Device to Produce MIMIC Capabilities
PROJECT REQUIREMENT
Provide 15 my=
present on the received
It should also be
Iftich Shquld control
Units capable of determining when there is modulation
signal and reproduce this modulation for rebroadcast.
able to determine if the unmodulated carrier is present,
the carrier of the MIMIC transmitter. .
a prototype MIMIC Unit and make up manufacturing
drawings. Test and evaluate prototype unit and obtain
of production units. Distribute specifidations
for a quantity of production units to fill OC require-
PROJECT DESCRIPTION
Design and construct
specifications and
approval for the manufacture
and drawings for bids
ments.
44aRovAL DATE
AUGUST 1958
APPROVED ARTING DATE
AUGUST 1958
to build
COMPLETION DATE
the
et-
...:
The manufacturer who -was given the contract
CU-94 has started work on construction of the units.
Delivery of completed units expected in approximately
weeks.
..,
Approved For Release 210.2.9.41-...1 Tolgregaga-02820A000500020038-3
25X1 A!
Approved For Release 20f3car lit.(i's 02820A000500020038-3
MONTHLY PROJECT REPORT
ORIGINATOR(S)
C3 FUTURE
PROJECT NUMBER
3-5144
BUDGET EST. FY.
AMOUNT
go ACTIVE
- 0 COMPLETED
?REPORTING, PERIOO
3.-30_April. 3959
0 CANCELLED
0 Si4SPENDED
PRIORITY CLASS PR PROJECT RSPN. rROJECT ENGINEER
I.
PROJECT TITLE
00-SP Dna ELectronic Power Supply
PROJECT REQUIREMENT
TO fillarequirmeant for SP fora400 cycle 600 volt-amp. and
28 VIC 10 amp. dual electronicomer eupply.
PROJECT DESCRIPTION
To prepare specifications whieh willifulfill Srs requirements for
10 each portable &nal electronic power supplies. TO examine the proposals
received to determine Which is best sated, taking into consideration
veight, sik;effl efficiency, delivery time: and method of operation. TO
monitor the fabrication of the production unite. To conduct tests on the
pre-oproduction model to insure that it meets all specifications.
25X1 A9
PPROVAL DATE
APPROVE
TART1 S DATE . COMPLETION DAT. I
i
t
i
r
,
Work Continues 40 a satisfactory rate on the dual electronic power supply.
Full load and over load tests of the engineering model have been conducted
With excellent results, indicating that an effective circuit design has been
realised. Fabrication of the prototype will begin as soon as the contractor
completes all necessary tests required to determine compliance with all
specifications.
Approved For Release 200q1051/11 .i.(711:?77111 02820A000500020038-3
Approved FocRelease 2000/09/11: CIA-RDP7402820A000500020038-3
61.11161.
HGINATORISI
OC-E
I FY
(When Filled In)
MONTHLY PROJECT REPORT
BUDGET [ST .
AMOUNT
IREPORTINT PERIOD
1 - 30 April 1959
'FUTURE
!fROJECT NUMBER
13.'5172
IPROJECT TITLE
CTIVF
[ PRIORITY CLASS
AC C IN
AI I-
[ COMPLETED ' CANCELLED ; SUSPENDED
;PRIM. RESPENSIBILITY PROJECT ENGINEER
SDS
AS-6 Base Station Systems Design
[PROJECT REQUIREMENT
?
To design the base station antenna system and AS-6 equipment installation.
I1T ;Uri DESCRIPTIDN
The project will include the antenna design, equipment layout, installation
drawings and preparation of a bill of materials to incorporate the AS-6
system into existing base stations.
APPROVAL OAT!
February 1959
nil MAPKS
APPROVED BY
NITATE 'COMPLETION DATE
G33. February 1959
nor decided that the Base Station location for the AS-6
X1A6L1 will be
25X1A6b
Installation plans are being drafted which will be forwarded to
Chief) for review and comment.
25X1A6a
Satisfactory tests between Los Angeles and the field unit located
at were conducted during the last week in April.
5X1A64
-Tests between are scheduled to be conducted
during the period 1-2314
op m , 54 pproved For Release 2D0D/09/1Uri1A-RDP78-02820A00-0-00-62-6038-
S?
? Approved For Release 2000/09/11 : CIA-RDP7V2820A000500020038-3
(When Filled in
OC -E
!t-L! WoN1M;IR
MONTHLY PROJECT REPORT
-7 BUDGET EST NC PERIOD
!Pr AMOUNT
1 1-30 _April 1959
211:1 ACT I VE
I , ?
? PRIORITY CLASS
ACTIUN
COMPLFTED I CANCELLED
IPRIM. RISPONSIDILITY
Voice Frequency Carrier Telegraph Systems
ISOSPENDED
PPo k I R
To improve the operation of our present voice frequency carrier (VFC)
25X1 A5a1 telegraph system investigate the feasibility of modifying this
equlpment to provide 100 wpm operation and select a new "standard"100 wpm VFC
eWPM,T40
5X1A9a
Improve reliability of present Microwave and VHF MUX systems, particularly
in respect to VFC channel frequency stability, for 60 wpm operation.
25)
Investigate the possibility of adapting, by modification or substitution
of components, present VFC equipment for 100 wpm teletype operation. Investigate
commercial developments in the field of VFC telegraph systems to provide 12
or more 100 wpm teletype channels in a single voice frequency spectrum of itoo
to 3,000 cps.
Make appropriate recommendations to OC based on results of abo? ve investigatioss.
APEEOVLI., OY - STEP INS 5AI; ;COML-115
?
An investigation has been made or the ommercial delielopments in the
A
field of VFC telegraph systems.
Transistorised telegraph systems are being manufactured by Northern
Radio, Lenkurt, and Tele-Signal. While all three systems are considered high
quality, the Tele -Signal equipment has several features not found in the
Northern or Lenkurt equipment. Some of these features are 1) self-contained
power supply in each unit, 2) speeds up to 2500 WPM, 3) plug-in frequency
determining network, 4) all adjustments on front panel and 5) proven reliability.
The price of a twelve channel simplex system is approximately $5000. This is
considerably less than competitive systems.
25X1 A6b
Four channels of Tele-Signal equipment have been reiiiiioned; This
equipment will be evaluated by EES and later shipped to
Estimates have been received from . for modification kits to
increase the operating speeds to 100 WPM and to increase reliability of our
25X1A5a1 presently installed Multiplex equipment.
5'4Approved For Release 2000/09/1DP78-02820A000500020038-3
25X1 P
- Approved For Release 2000/09/11: CIA-RDP4-02820A000500020038-3
D T
MONTHLY PROJECT REPORT
PROJECt NUMBER
Ewil73 *
CONTINUED
PRIM, RSPN%
EES
REPORTING PERIOD
1-30 April 1959
These Estimates were for:
100 Channels 13 each
200 Channels 348 each
400 Channels 316 each
600 Channels *298 each
1000 Channels $284 each
These prices seem excessively high in comparison to new equipment designed
to operate at 100 WPM.
Upon receipt of test equipment now on order preliminary examinations
will, be made to determine if operation of present equipment can be improved
at a lover cost per channel.
(1A9a
X1A6a
iX1A9a
'.5X1A6b
5X1A6a
?5X1C4a
Approved Fote5elease 2000/09/1144fRDP7t92820
(Whom Ft/tc/ /n)
OC -E
(I0,410 R
IP.-51714.
MONTHO PROJECT REPORT
BUDGET' EST: 7REP1RTiNC, PERiOD
AMOUNT
1959 1 - 30 April 1959
Ae r ION
IVF I COMPLFTED (.7ANCELLFE
?
PRIORITY CLASS !PRIM. RESPONSIBILITY
FES
General Engineering Support to all Communications Areas.
NT-
Same
as Above
quSPF NO ED
Provide engineering representation and liaison with
and Agency elements for new construction and relocation of ommun cat ons
facilities not covered under other projects.
Support is also to be given to the Area,lin providing general engineering
information and resolving individual technical problems as required.
25X1A2d2
Records are to be maintained for Area Base and Field Stations reports
and drawings 111111111
March 1959
25X'
1. A discussion was held between personnel of OC-E/SEB/FES and
OLmRE&CD relative to new construction, a o . 25X1A61
opilogovements.erage and power retire AIM
(REMO) will go to
for six weeks se- 25X1A6a
25X1A6b
2. Details of a Logarithmic Periodic antenna to receive between 25X1A5a1
30 and 180 mos, designed and constructed by
sent to Chief. Permission for installation at
25X1A
for use by was requestid.
3. Assistance was given in regard to tenativelpians for the
Installation of KW-26 e4tillithent-at the4 receiving station. 25X1)
5X1-Pk:
25X1(
New UNION space requirements were coordinated with 00-MD.
fications and a drawing was submitted to the
25X1C4a iiiiiiiiiiifor inclusion with their requirements on.I
building plans. Chief, and OL-RELCD will be advised of
these plans. 25X1A6b
?Rm 1543
8 Approved For Release 2000/09/ 11 ILIAC
25X1A6a
25X1A6a
25X1A6
15X1C4a
25X1A6a
25X1A6b
Approved For Release 2000/09/11: CIA-RDP78-02820A
?
.M14.1?????WMIlbeaae....1?Weome
A.C7 NUMBER
E..5174
l",,,,25X4A6b
150,
4;-
41911111/41 ;I"(
MONTHLY PROJECT REPORT
TPIM RSPN.
1 FES
ri;t7n, PEFon
1 1 ? 30 April 1959
25X1A6b
25X1A6b
25X1A2d2
1. A request was sent to OL-BE&CD for selection of equipment to
meet deh ? tion requirements of the warehouse in the
proposed Headquarters building. Engineering will
procure a s p the specified equipment for installation
by the contractor. A memorandum to the file was prepared.
2. At a meeting held with
Communicationsfloor learnedconstruction
pir
of the building will not be started by 31 Nisy as
antici e n he field. Ardaechural drawings still
require completion and 1111approval before contractual
services can be solicited.
A 30 kw diesel-generator was requisitionad and notification
of delivery to the field in July was sent. Installation
drawings were also forwarded.
Preliminary details on the La Port tandem rhombic antenna
were sent as requested.
25X1A2d2
Twelve correcteddrawings were sent for inclusion
with MI records..
Semi-annual Engineering reporting forms were sent to all
areas.
pproved-FaRMassr-2t300109/4i--.-GIA-RDP-78-112.82GA000501142003a-3
?
Approved For Ulease 2000/09/1141:iRDP78-02820A0999.0001011At
?111r
rIthen Filled In
OC-P
: ACT I vi:
:FY
MONTHLY PROJECT REPORT
HUDGFT
_
AMOUNT
_AEI I ION
OMELETED 1 CANCELLED
IA I NAMRf,? PRIORITY CLASS 'PRIM RESPONSIBILITY
JREPORrING PERIOD
1
1. - Aprt.3._ 1959
E-5175
25X16a
m, Nit
25X1A6a
Radio Station
SDS
ISUSPENDED
I PROJECT ENGINEER
EMMMMA
25;
To formulate plans for the installation of a Radio Station at
for use as a backup or in the event MEbecame inoperable. 25X1 6b
Determine the magnitude of the station required; select suitable
locations with sufficient land to accommodate a receiver and transmitter
site; survey, clear, and grade sites as required; design and locate
antennas, buildings, and necessary shelters; locate accessible water,
power, and sewer mains; and prepare bill of materials. Actual phases of
construction and operation will take place when required.
'STARTING BAEE
May 1959
COMPLETION DATE
Preliminary discussions have been held recently regarding the require-
ments for this project. This project will be in the active status during
the next reporting period.
1543 Approved For Release 2000/09/19011.44-RDP78-02820A000500020038-3 (2O-42)
25X1
K1 A9a
,X1A5a
Approved For Release 2000/09/11: CIA-RDP78-02820A ' 3 ,
--
'vier ,
,
OC 8095
(When Filled In)
MONTHLY PROJECT REPORT
BUDGET
F's( 1 AMOUNT
IRIPOR.INC PERIOD
1 - 30 April 1959
HITURL
PROJECT NUMBER
E-5197
POJECT TITLE
ACTIVE
PRIORITY CLASS
AU (IN
r
COMPLETED CANCELLED
1PRIM. RESPONSIBILITY
Portable Emergency Broadcast Station
pROA[c7?RirUUIREMEN-7
SDS
1 HSPENDEO
7
PROJECT ENGINIA'R
To provide packages medium and shortwave 1 kilowatt broadcast stations
for field use.
PRDJECT OF 5CR (PT ION
1. Find a suitable 1 KW broadcast transmitter for the 535/1605 KC band.
2. Find a suitable 1 KW broadcast transmitter for the 2-26.1 MC band.
3. Find antennas useable in the 550/1600 KC band and supporting towers
for dipoles in the 2-30 MC band.
4. Determine materials and accessories necessary for installation and
operation of a complete broadcast station.and requisition these items.
5. Install and field test the stations near Washington, D. C.
APPROVAL DATE 5pppnrn I OTART DAT( COMPLETION DATE
January 1959
kFMARKS
January 1959
pids e received on the transmitters and antenna coupler from and
was selected as meeting all specifications. Their bids were:
Antenna Coupler
$ 1,070
Medium Wave Broadcast Transmitter
4 4,735
Short Wave Broadcast Transmitter
$ 6,361
Variable Frequency Oscillator
4 1,047
A rough estimate on cost of a portable Butler building with flooring and
a wood foundation is $1,500.
A complete portable station including transmitter, building, generator,
and other equipment would cost approximately $25,000.
? 1 543 Approved For Release 2000/09AMIA-RIXMVEttpAtO20038-3
i20-42)
25X1 A
25X1 A!
25X1 A6b
Approved For Release 2000/09/11: CIA-RDP78-02820A0005000
aulM1111WErit. *11".
,c?5, T 5)
XONTHLY PROJECT REPORT
11111[0C-O&T
0 FUTURE
PROJECT NUMBER
E-5386
PROJECT-T2E0(1
1 BUDGET EST
..FY. TREEORTING PERIOD
I_ 1 ? 30 April 1959
I ACTIVE:
AQOUNT
0 COMP L E TED
Base Station Relocation
PPIM. RSPN.
SDS
0 CANCEE LEO 0 SuGPENDED
PRoJECT REQUIREMENT
Design a new transmitter and receiver facility because the resent transmit-
ting and receiving facilities are housed in a Quonset Hut and respectively,
and are inadequate for present circuit re uirements. The transmittin station
_must_move in the near future to prmi
PROJECT DESCRIPTION
25X1
25X1
25X1 C
Future planning calls for the delimit Base ARM4iio be constructed on
25X1 C4a
outside of the area.
element between the field, Agency elements, and
X1t
elements. 25X1
We will act as the coordinating25 C
25X1 C4
25X1 C4a
25X1 C4a
25X1A9a
PPRoYAL DATE
September 1956
APPROVED wABJE3/
JJK Js/
STARTING DATE COMPLETION DATE
September 1956
25X1 A6b
Installation drawings for both the receiver and transmitter buildings
have been completed. Installation schedule and equipment status reports
have also been completed. Co les of the above dravin s and reports are being
made for trauma to expect to
t t e 11 Ma 5cflooj. na depart for around the 25th of May.
will follow in approximately 3 months.
25X1A6b
No construction progress reports have been received, via the MARE
Resident Engineer, since March; however, it is assumed that installation of
equipment and material may proceed in June 1959. C lotion date for the
communications buildings is 30 June 1959, however, may occupy the
buildings on a "beneficial occupancy" basis, prior to that date, without
jeopardising our right to reject poor workmanship or correction of building
defects.
Approved For Release
2",111.1111661216P78-020?44pHORMAti.3
25X1N
25X1 A2d
This project was originally started in September 1950 to prepare a bill of
materials and associated drawings to cover the installation of a one man radio
25X1A6a station in It has been expanded to cover the installation and
renovation of all one man stations. Using the one man station design as a guide,
a complete bill of materials, associated drawings and installation specifications
will be prepared according to the requirements of each particular station.
APPROVAL DATE
Approved For Release 2000/09/11 : CIA-RDP78-02820A000500-
'IGINATOTTS-)
QC-0+T
MONTHLY PROJECT REPORT
BUDGET EST .r
AmouNT
0 FuTuRE
CO ACTIVE 0 COmPLETED
REPOPTIN6
" 30 April 1959
0 CANCELLED
PROJECT NUMBER
E-5412
PRIORITY CLASS
PRIM. RSPN.
SDS
PROJECT TITLE
One Man Radio Station
0
PF,DJECT RE')UIREMENT
Design a complete one an radio station to be used as a standard for the
planning of all new one man stations or when renovating existing stations.
PROJECT DESCRIPTION
25X1C4
September 1:256
APPROVED
AJ W /h/
Ja is/
STARTING DATE
September 1956)_
CompLEIta?
During this reporting period the station was presented to various
interested members of OC Staffs. Both favorable comments and constructure
criticism vas received. From these comments and suggestions certain changes
in the position were generated. These consist chiefly of equipment location
and represent no major changes in the basic position.
The specifications for the being written and will be
completed in the near future.
the contractor for the prototype,
is presently engaged in producing the drawings and should be finished by
approximately 6 May.
I'slanped to ship the prototype to
new during June 1959.
Approved For Release--"'
for installation at the
25X1
25X1A&
25X1A&