MONTHLY REPORT INSTALLATION AND MAINTENANCE BRANCH ENGINEERING STAFF 1 AUGUST - 30 AUGUST 1962

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-02820A000800050030-5
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
5
Document Creation Date: 
December 9, 2016
Document Release Date: 
April 6, 2001
Sequence Number: 
30
Case Number: 
Publication Date: 
August 30, 1962
Content Type: 
PERRPT
File: 
AttachmentSize
PDF icon CIA-RDP78-02820A000800050030-5.pdf216.39 KB
Body: 
Approved For Release 2001/04/23 2820A00(~,0050030-5 MONTHLY REPORT TNSTIILLATION AND MAINTENANCE BRANCH ENGSNEERING STAFF 1 AiTGUST - 3o AUGUST 1962 1. The program for replacing SIGTOTS with the new HW-19A configura- tion is now complete in the Langley Signal Center. A total of eight of these units are now in operation. 2. During this reportin eriod, the ins~el~hi~"~~~ivery smoothly, HW-l~A ~wa,s affected at the having fulfilled the requirement none y. 3. Anew schedule for the Wire Maintenance Section it reflects as been initiated during this reporting period. Generally, senior technician as supervisor on each of the three watches. This change has afforded closer supervision of both personnel and wark assig~m-ents on all watches, and an increased efficiency has definitely been noticed. }~. The ~gley~ link has been "cleaned up." The majority of 25X1A6b the troubles we have lived with have been due to faulty Bell System equip- ment Thia equipment has been replaced and Agency owned equipmen as ee realigned. Other than routine troubles, no major out- 25X1A6d ages have occurred since this remedial action was taken. 25X1A9a Chief, Installation and Maintenance Branch, OC-E n Approved For Release 2001/04/23: CIA-RDP78-02820A000800050030-5 Approved For Release 2001/ BRANCH SUPPLY SECTIQN A. The tote], expenditures for Fiscal Year 1963 as of 22 August 1962 are ~3,og2.5o. B. Eliminated all control cards on HL-7 spares on o ithencardsion had been taken for the past five years. Eliminated 95'~ C. Cryptographic Material -Semi-Annual Inventory not cohpsical..inventoe awaiting the return of baud receipts and confirming p y rtes. I3. Field Requests - As of 22 August 1962 a total of sixty-nine (6g) field requests consisting of five hundred and thirty-one (531) line items have been processed. ELECTRONIC MAINTENANCE SECTIQN A. Microwave and the assoei- 25X1 A6d The Microwave System ated landlines ~+1GC490 and nave At ma ' ntermittent type 25X1 A6b problems during this reporting period. ome of the prob- 25X1 A6d lems were isolated to the Telephone Company ~+3A carrier system. Two filters were changed to provide greater tone separation of the ~+1GC1+91 channel. New style arc suppressors were installed in the Northern Key- ing Relay Circuits to reduce distortion. The circuit from OCI Watch Office to the White House and the cir- cuit from ORR (Langley) to 1019 Alcott Hall were tested and activated during this reporting period. c. xY-5 The KY-5 is in daily operation on a "phone to phone" basis.- The Kellogg switchboard is not in use due to the lack of modification in- structions from NSA. D. Very-Nigh-Frequency Normal, coverage was provided during the month of August. REHAB. SHQP A. Fabrication of a tape factory was ccxi~pleted and shipped to 25X1 A6a the field. Approved For Release 2001/04/23 :CIA-RDP78-02820A000800050030-5 Approved For Release 20 ~ - - 820AOOfl$A0050030-5 B. Two HW-19A configurations were fabricated, tested and delivered to the P eki and Crating section for shipment to the field to fulfill- 25X1A 25X1A ~ requirements. G. One half-du 1ex HW-19A configuration was fabricated for installation 25X1A9a 25X1A at the Messrs, affected this installs on no problems encountered. D. The equipment for one full-duplex H~+TT-1 A installation has been pre- 25X1 A6a wired and tested to satisfy the requirement. The installation will be made upon receipt of the new s yle HW-19A rack. E. The HW-19A equipment for the $uarters Eye Logistics network installa- tion has been pre-wired for use with the Bell System TWX machines. The installation will be made upon receipt of the new style HW-19A racks. F. Processed 2 incoming vouchers totaling 103 items. Processed 17 outgoing vouchers totaling 75 items. G. Mechanical Maintenance Section - Routine WIRE MAINT~!,NANCE SECTIOIQ A. Section Activities 1. Two Model-28 ASR's have been rewired in accordance with HW-19A s-fandards for two half-duplex circuits to Logistics, $uarters Eye. The HW-19A reek was wired and will be installed as position six in the Washington-Terminal outgoing section (Langley). 2. The Replacement Program for changing Sigtot to HW-19A operation continues this month with the remaining two HW-lg racks completed. The ASR equipment will be rewired and converted to single shaft op- eration. 3. A storel Model-55B was repaired and returned from _ and installed in the Control Console. One test pattern distor- tion generator was shipped - for repair. 25X1A5a1 25X1A5a1 1+. Mr. received one week of instructions on the HL-6 25X1 Aga at laboratory. 25X1 A6a 5. Variable speed kits were installed on two Model-28 KSR's roll- ervunds. This equipment is used to set up the KW-26 circuits. This versatility from 60 W.P.M. to lO0 W.P.M. allowed the removal of one KSR unit. Approved For Release 2001/04/23: CIA-RDP78-02820A000800050030-5 Approved For Release 2001/04/2 6. A test panel was installed on the rear of the Control Console to test the circuit selection ste pers. A total of twenty (20) test points were installed, ten (10~ for Unclassified, and ten (10) for Classified circuits. 7. The circuit selection panels, both Classified and Unclassified, were checked out with respect to the Console Model-28 KSR's, the test pattern generator, and the distortion analyzer on all aend and receive circuits. 8. Seven Series governed motors on Model-2$ KSR equipment were re- placed with synchronous type This replacement will re- duce maintenance considerably, 9. Two Model-28 K'I'R's were installed to facilitate the maintenance of the microwave system. One unit was installed in the Radio Control room and one in the Microwave Building. B . F~nergency Power Both diesels were run under load for a period of thirteen hours. Daily, weekly and monthly routine maintenance was completed totaling one hundred and forty-five (1~+5) man hours. 2. 30 KW Generator a. This unit ran a total of fifteen hours under load. A total of $0 man hours was expended on routine maintenance and repair. b. No mayor or minor repairs required during this reporting period, C. Trouble Reports A total of three hundred and ninety-eight (398) troubles were re- ported and corrected from the following areas: Isngley Relay - 23~+ T,anigl.ey SSCB - 111 t~.ngley ~ 25X1 A2d 1 Langley - - 2 1717 "H" Street - 7 Outside Area - 24 25X1A6d 25X1A6d Approved For Release 2001/04/23: CIA-RDP78-02820A000800050030-5 25X1A Approved For Release 2001/04/23 :CIA-RDP78-02820A000800050030-5 Approved For Release 2001/04/23 :CIA-RDP78-02820A000800050030-5