Trip Report - CK-30 with(Classified)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-02820A001000060010-3
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
3
Document Creation Date:
December 9, 2016
Document Release Date:
May 12, 1998
Sequence Number:
10
Case Number:
Publication Date:
December 23, 1964
Content Type:
TRIP
File:
Attachment | Size |
---|---|
CIA-RDP78-02820A001000060010-3.pdf | 119.8 KB |
Body:
I? ss%. F~Omm vowed For Release 200low
1/07/28 : DP78-0282OA001000060010-3
mAY eve ow. No n
UNITED STATES GOVERNMENT
JVkrnorandum
EP 64-328
The Files: Contract 151, T.O. 14 xiATA0. 23 December
25X1A9a
J!'B,1E, Trip Report - CK-30 with
25X1C1a1
25X1A5a1
25X1C1a1
2. Contractual Information:
a. Target Cost: $81,782.00
b. Request.for Procurement Action: 4 June 1964
c. Initiation Date: 29 June 1964
d. Completion Date: 30"June 1965 of 300 WPM Morse
e. Deliverable Items: One (1) engineering model
code coder/keyer
One (1) engineering model of 1200 WPM Baudot
code coder/keyer
Three (3) service test models of 300 WPM Morse
coder/keyer.
Three (3) service test models of 1200 WPM Baudot
coder/keyer
Monthly Reports
Final Report
One (1) set of reproducible specifications and
drawings (vellums or sepias) and an additional
five copies of each.
3. Date of Meeting: 17 December ,964
4. Place of Meeting:
Persons Attending:
1. Project Description:
Approved For Release 2001/07/28.% i%
Approved For Release 2001/07/28 : CIA-RDP78-02820A001000060010-3
EP 64+-328
SUBJECT: Trip Report - CK-30 with
5. Persons Attending:
25X1A9a
Agency 'Non-Agency
Mr.
Mr.
25X1A5a1
25X1A5a1
6. Contractor's Performance:
a. On schedule and expected to remain so: No
b. Within obligated funds and expected to remain so: No
c. Satisfactory technical progress: Yes
7. Project Status:
The purpose of this meeting was to establish a contract between
25X1A5a1' , for the manufacture of the electronics to be used in
_ the CK-30. This had not been done earlier because sufficient details 25X1A5a1
were not available for - to give M a satisfactory quotation.
25X1A5a1 The essential problem seems to be lack of communication between _ 25X1A5a1
- 25X1 A5a1 engineers and the - Lab Manager. Both parties have agreed to
eliminate this communications problem by having their respective project
engineers communicate directly. When necessary, will communicate
directly with the COTR in Washington, D. C. 25X1A5a1
25X1A5a1
1 25X1A5a1
was about $8,500 over the cost of
circuitry as proposed to us by MM. Mr. has been endeavoring 25X1A5a1
to reduce this extra cost and has been partially successful. It now
that the cost for work will be approximately $43%000 25X1A5a1
appears
25X1A5a1 above ~ estimate and, undoubtedly, Mr. - will petition the
reas in reduction
f th
e a
contracting officer for monetary relief. One o
of this cost was for an.extra set of electronics, at about $1,,000.,which
25X1A5a1
will not be procured because= can't afford it. Another reduction
occurred when we agreed to the use of a capacitor coupled output
circuit vice the standard transformer coupling. Thin film engineers
dislike transformers. Our Lab checked the capacitor circuit for
compatibility using an =breadboard and the results were satisfactor 2.5X1A5a1
Much of the block layout of the CK-30. . . .
Approved For Release 2001/07/28 : CIA-RDP78-02820A001000060010-3
Approved For Release 2001/07/ CIA-RQP78-0282OA001000060010-3
Ei, 64-328
SUBJECT: Trip Report - CK-30 with
25X1A5a1
Much of the block layout'of the CK-30 has been completed and it
appears that each unit will utilize 18 integrated circuits in conjunction
with the thin film technique. =had not supplied adequate information 25X1A5a1
regarding tape head output and solenoid drive current requirements;
however, these are details which can be supplied a ,little later in the
25X1A5a1 program. Mr. each signed a letter of intent and
this program is finally underway. Delivery of the first electronic
modules is scheduled 12 weeks from the date of initiation. This
indicates that the CK-30 program is two months behind schedule.
25X1A9a
Distribution:
R&D Subject File
Inspection Branch OL/PD
R&D Lab
OC-OS
ESB
Monthly (2)
EP Chrono
25X1A9a ///
OC-E R&D-EP bjp
3
gAl"
Approved For Release 2001/07/28: CIA-RDP78
'(23 December 1964)