Trip Report - CK-30 with(Classified)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-02820A001000060010-3
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 9, 2016
Document Release Date: 
May 12, 1998
Sequence Number: 
10
Case Number: 
Publication Date: 
December 23, 1964
Content Type: 
TRIP
File: 
AttachmentSize
PDF icon CIA-RDP78-02820A001000060010-3.pdf119.8 KB
Body: 
I? ss%. F~Omm vowed For Release 200low 1/07/28 : DP78-0282OA001000060010-3 mAY eve ow. No n UNITED STATES GOVERNMENT JVkrnorandum EP 64-328 The Files: Contract 151, T.O. 14 xiATA0. 23 December 25X1A9a J!'B,1E, Trip Report - CK-30 with 25X1C1a1 25X1A5a1 25X1C1a1 2. Contractual Information: a. Target Cost: $81,782.00 b. Request.for Procurement Action: 4 June 1964 c. Initiation Date: 29 June 1964 d. Completion Date: 30"June 1965 of 300 WPM Morse e. Deliverable Items: One (1) engineering model code coder/keyer One (1) engineering model of 1200 WPM Baudot code coder/keyer Three (3) service test models of 300 WPM Morse coder/keyer. Three (3) service test models of 1200 WPM Baudot coder/keyer Monthly Reports Final Report One (1) set of reproducible specifications and drawings (vellums or sepias) and an additional five copies of each. 3. Date of Meeting: 17 December ,964 4. Place of Meeting: Persons Attending: 1. Project Description: Approved For Release 2001/07/28.% i% Approved For Release 2001/07/28 : CIA-RDP78-02820A001000060010-3 EP 64+-328 SUBJECT: Trip Report - CK-30 with 5. Persons Attending: 25X1A9a Agency 'Non-Agency Mr. Mr. 25X1A5a1 25X1A5a1 6. Contractor's Performance: a. On schedule and expected to remain so: No b. Within obligated funds and expected to remain so: No c. Satisfactory technical progress: Yes 7. Project Status: The purpose of this meeting was to establish a contract between 25X1A5a1' , for the manufacture of the electronics to be used in _ the CK-30. This had not been done earlier because sufficient details 25X1A5a1 were not available for - to give M a satisfactory quotation. 25X1A5a1 The essential problem seems to be lack of communication between _ 25X1A5a1 - 25X1 A5a1 engineers and the - Lab Manager. Both parties have agreed to eliminate this communications problem by having their respective project engineers communicate directly. When necessary, will communicate directly with the COTR in Washington, D. C. 25X1A5a1 25X1A5a1 1 25X1A5a1 was about $8,500 over the cost of circuitry as proposed to us by MM. Mr. has been endeavoring 25X1A5a1 to reduce this extra cost and has been partially successful. It now that the cost for work will be approximately $43%000 25X1A5a1 appears 25X1A5a1 above ~ estimate and, undoubtedly, Mr. - will petition the reas in reduction f th e a contracting officer for monetary relief. One o of this cost was for an.extra set of electronics, at about $1,,000.,which 25X1A5a1 will not be procured because= can't afford it. Another reduction occurred when we agreed to the use of a capacitor coupled output circuit vice the standard transformer coupling. Thin film engineers dislike transformers. Our Lab checked the capacitor circuit for compatibility using an =breadboard and the results were satisfactor 2.5X1A5a1 Much of the block layout of the CK-30. . . . Approved For Release 2001/07/28 : CIA-RDP78-02820A001000060010-3 Approved For Release 2001/07/ CIA-RQP78-0282OA001000060010-3 Ei, 64-328 SUBJECT: Trip Report - CK-30 with 25X1A5a1 Much of the block layout'of the CK-30 has been completed and it appears that each unit will utilize 18 integrated circuits in conjunction with the thin film technique. =had not supplied adequate information 25X1A5a1 regarding tape head output and solenoid drive current requirements; however, these are details which can be supplied a ,little later in the 25X1A5a1 program. Mr. each signed a letter of intent and this program is finally underway. Delivery of the first electronic modules is scheduled 12 weeks from the date of initiation. This indicates that the CK-30 program is two months behind schedule. 25X1A9a Distribution: R&D Subject File Inspection Branch OL/PD R&D Lab OC-OS ESB Monthly (2) EP Chrono 25X1A9a /// OC-E R&D-EP bjp 3 gAl" Approved For Release 2001/07/28: CIA-RDP78 '(23 December 1964)