(Sanitized)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-02820A001000060019-4
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 9, 2016
Document Release Date: 
May 12, 1998
Sequence Number: 
19
Case Number: 
Publication Date: 
December 31, 1964
Content Type: 
MFR
File: 
AttachmentSize
PDF icon CIA-RDP78-02820A001000060019-4.pdf74.12 KB
Body: 
Approved For Release =1071- 13' ~E;IA DP78-02820A001000060019-4 31 December 1964 MEMORA 1 FOR THE RECORD 25X1A9a FROM M SUBJECT: New 25X1A9a 25X1A6b 1. This meeting was held 31 December 1964 at the request of Mr. D/Chief, RECD, to discuss and review the project prior to his departure next Wednesday, 6 January 1965, to assist the staff in preparing the A/E phase. 2. Those present at the meeting were as follows: 25X1A9a OL/RE&CD OL/RL&CD OL/RS&CD 0C-E/AES 3. Major points discussed, reviewed and agreed upon were as follows: 25X1A6a a. Type of wall construction suitable to meet OC security requirements; i.e., reinforced concrete or cinder block with 6 inch on center J inch rods, poured concrete. b. Proposed installation of 2 each 100KW, automatic start/ stop, emergency power generators. Mr. - expressed that OC E 25X1 A9a should at the earliest time (no later than late January) forward complete details of the units to for incorporation in the 25X1A6a A/E specifications. c. Eliminate the satellite antenna installation on the roof as previously agreed upon. The undersigned stressed that 0C definitely plans to install such an antenna in the future in the receiver compound and desires that the NOR I/ZAST/SOUTE quadrants be kept clear of high obstacles such as power building, water tower, link towers, etc. d. Parking hardstand space within the compound for 10 govern- ment and private vehicles would be ample. No sheltered space will be provided. e. A/E will not include any work connected with dismantling, moving and erecting the present "R" site antennas. Ex~lUa d Approved For Release 2001/0 0$160019-4 Approved For Release 20 !RdPI8-02820A001000060019-4 25X1A6b f. A/B specifications will be such as to show costs for com- puter (elevated) floors and conventional type. (Trenched or over- head distribution.) g. Should A/B cost estimates be considerably under the $1+00,000 figure, the 650 square feet previously cut from the Main Operations Room will be restored. 4. For A/B planning purposes, Mr. - requested OC-B furnish 25X1A9a him a new equipment layout (sterile) based on the reduced building size together with a total equipment fii load. The undersigned promised to have these ready prior to his departure next Wednesday. 25X1A9a Approved For Release 2001 2820A001000060019-4