Trip Report - KE-29(Classified)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-02820A001000060024-8
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 9, 2016
Document Release Date: 
May 12, 1998
Sequence Number: 
24
Case Number: 
Publication Date: 
November 9, 1964
Content Type: 
TRIP
File: 
AttachmentSize
PDF icon CIA-RDP78-02820A001000060024-8.pdf119.04 KB
Body: 
1a;Apli?roved For Release 2001/07/28 : CIA-RDP78-02820AO01UDO060024-8 25X1A9a - UNITED STATES GOVERNMENT Memorandum TO The Files Contract 151, T.0. 13 FROM Mr. SUBJECT: Trip Report - KE-29 with 25X1A9a EP 64-263 DATE: 9 November 199+ 1. Project Description: The KE-29 is a 1200 WPM Baudot keyer. Approximate dimensions for the keyer are 3' it x 22" x iv` and 12 volts DC at about 250 MA is required for the motor and the electronic circuitry. CA-3 cartridges f/u/w the keyer are prepared by a modified CO/A-8 which has been redesignated C0-29 coder. 2. Contractual Information: a. Initial Cost: $27,938.32 Increase In Scope: $11,382.4.5 b. Request for Procurement Action: 11 March 1964 c. Initial Date: 10 April 1964 d. Completion Date: 1 October 1964 e. Deliverable Items: 20 Service Teat Models 3. Date of Meeting: 29 and 30 October 1964 4. Place of Meeting: 5. Persons Attending: Agency Mr. Mr. Mr. Mr. Mr. Mr. 6. Contractor's Performance: Non-Agency a. On schedule and expected to remain so: No b. Within obligated funds and expected to remain so: Yes c. Satisfactory technical progress: See Project Status 7. Project Status: Approved For Release 2001/07/28 : GI 07 201, 91,, 04060024-8 25X1A5a1 25XlA5al Approved For Release 2001/07/28 : CIA-RDP78-0282OA001000060024-8 EP 64-263 SUBJECT: Trip Report - KE-29 with Skokie, Illinois 25X1A5a1 7. Project Status: 25X1A5a1 had received three electronic - 25X1A5a1 modules from- just a few days before this visit. One of the units works satisfactorily and was installed in a ICE-29 for demonstration purposes. This unit cannot be delivered until after environmental testing has been completed. The other two modules have the undesirable characteristic-of locking either in mark or space condition. This malfunction has not been traced down; however, it is suspected that - voltage variations caused by the motor loading the power line may be the cause. Earlier in the program erratic keying caused by motor noise was considered serious, but this problem - appears to have been conquered. Additional electronic modules are scheduled to be shipped from on 3 November. 25X1A5a1 A visit was made to , 25X1A5a1 on 12 October to monitor progress on NE-29 thin film circuitry25X1A5a1 and other projects. Mr. , were 25X1A5a1 present at - for this discussion. At this meeting we - discovered the project was being held up by a delay in delivery of the integrated circuit audio amplifiers which are to be incorporated in the thin film module. All the other components -- were available at this time and the first unit had been built- up as far as possible. Tests could not be made for lack of the integrated circuit and this accounts for the delay in the - program. The thin film module for the T{E-29 is unique because it uses "thick film" and uses both sides of the substrate. This economical use of space had not been attempted at - 25X1A5a1 prior to this project. The thick film technique, utilizing silk screens for circuit deposition instead of vapor deposition, results in a lower cost electronic package. It was somewhat of 25X1A5a1 a shock to the discover that was using N.E.C. (Japanese) transistors and integrated circuits for this application. The contractor was questioned about the quality of these foreign 25X1A5a1 components and he justified their use based on tests conducted by - and also by the fact that they are inexpensive compared to American equivalents. A copy of the 25X1A5a1 report is on file in this office. 25X1A9 Approved For Release 2001/07 79 02820A00' 000060024-8 Approved For Release 2001/07/28 : CIA-RDp78-02820A001dO0060024-8 SUBJECT: Trip Report - KE-29 with Distribution: R&D Subject File Inspection Branch OL/PD R&D Lab OC-OS ESB Monthly (2) EP Chrono EP 64-263 25X1A9a OC-E/R&D-EP, 'bjp (9 November 196+) 3 Approved For Release 2001/07/27 25X1A5a1