(Sanitized) Phase II
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-02820A001000060048-2
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
2
Document Creation Date:
December 9, 2016
Document Release Date:
May 12, 1998
Sequence Number:
48
Case Number:
Publication Date:
November 5, 1964
Content Type:
MFR
File:
Attachment | Size |
---|---|
CIA-RDP78-02820A001000060048-2.pdf | 76.7 KB |
Body:
Approved For Release 2001/07!1'! 20A001000060048-2
5 November 1964
MEMORANDUM FOR THE RECORD
25X1A9a FROM
25X1A6aSUBJECT: Phase II
1. A meeting was held 4 November 1964 to acquaint
STRATCOM representatives with - requirements at a joint 25X1A2d1
25X1 A4te proposed for-.
25X1 C4a
25X1A9a
CIA
CIA
A
3. The initial CIA planning was shown to STRATCOM in
the form of four drawings depicting transmitting and receiving
antenna layouts, receiver building layout and a single line
drawing of the transmitter building layout. The drawings were:
a D5311.27-R/A-01(X), dated 7 October 1964
b. D5311.27-A/'T-03, dated 12 October 1964
c. D5311.27-T/QC-O1(X), dated 6 October 1964
d. D5311.27-R/S-01, dated 3 November 1964
25X1C4a 4. Mr. - was queried as to construction costs in 25X1C4a
25X1A6 . The had supplied him
th the following figures:
Transmitter Building
48/sq.ft.
Receiver Building
50/sq.ft.
Power Building
2 /sq.ft.
Administration Building
l8/sq.ft.
5. Power requirements ...
Approved For Release 2001/07/28 : CIA-RDP78-02820AO01000060048-2
Approved For Release 2001/07 I .x 0A001000060048-2
25X1 A6ag ECT: - phase II
5. Power requirements for both facilities exceed the
planned installation capacity. Present over plan- 25X1A
ning consists of the following:
Receiver Site : 3 ea. 375 KVA generators
1 ea. 150 KVA NO-BREAK generator
Est. installed cost - $322,000
Transmitter Site : 3 ea. 175 KVA generators
Est. installed cost - $121,000
Originally the following had been planned, but reduced to meet
budgetary limitations:
Receiver Site : 3 ea. 625 KVA generators
Est. installed cost - $800,000
Transmitter Site : 3 ea. 550 KVA generators
Est. installed cost - $365,000
The following ELECTRONIC loads were furnished as CIA require-
ments:
Receiver Site : 84.6 KVA
Transmitter Site : 394 KVA
25X1C4a 6. Mr. M will integrate the CIA requirements with
25X1A those of and call another meeting to review the
resultant planning prior to contacting
Distribution:
2 - Monthly Report
1 - Project File
1 - AES Chrono
25X1 C
25X1A9a
Approved For Release 2001/07/28 : CIA-RDP78-02820A001000060048-2