(Sanitized) Phase II

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-02820A001000060048-2
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 9, 2016
Document Release Date: 
May 12, 1998
Sequence Number: 
48
Case Number: 
Publication Date: 
November 5, 1964
Content Type: 
MFR
File: 
AttachmentSize
PDF icon CIA-RDP78-02820A001000060048-2.pdf76.7 KB
Body: 
Approved For Release 2001/07!1'! 20A001000060048-2 5 November 1964 MEMORANDUM FOR THE RECORD 25X1A9a FROM 25X1A6aSUBJECT: Phase II 1. A meeting was held 4 November 1964 to acquaint STRATCOM representatives with - requirements at a joint 25X1A2d1 25X1 A4te proposed for-. 25X1 C4a 25X1A9a CIA CIA A 3. The initial CIA planning was shown to STRATCOM in the form of four drawings depicting transmitting and receiving antenna layouts, receiver building layout and a single line drawing of the transmitter building layout. The drawings were: a D5311.27-R/A-01(X), dated 7 October 1964 b. D5311.27-A/'T-03, dated 12 October 1964 c. D5311.27-T/QC-O1(X), dated 6 October 1964 d. D5311.27-R/S-01, dated 3 November 1964 25X1C4a 4. Mr. - was queried as to construction costs in 25X1C4a 25X1A6 . The had supplied him th the following figures: Transmitter Building 48/sq.ft. Receiver Building 50/sq.ft. Power Building 2 /sq.ft. Administration Building l8/sq.ft. 5. Power requirements ... Approved For Release 2001/07/28 : CIA-RDP78-02820AO01000060048-2 Approved For Release 2001/07 I .x 0A001000060048-2 25X1 A6ag ECT: - phase II 5. Power requirements for both facilities exceed the planned installation capacity. Present over plan- 25X1A ning consists of the following: Receiver Site : 3 ea. 375 KVA generators 1 ea. 150 KVA NO-BREAK generator Est. installed cost - $322,000 Transmitter Site : 3 ea. 175 KVA generators Est. installed cost - $121,000 Originally the following had been planned, but reduced to meet budgetary limitations: Receiver Site : 3 ea. 625 KVA generators Est. installed cost - $800,000 Transmitter Site : 3 ea. 550 KVA generators Est. installed cost - $365,000 The following ELECTRONIC loads were furnished as CIA require- ments: Receiver Site : 84.6 KVA Transmitter Site : 394 KVA 25X1C4a 6. Mr. M will integrate the CIA requirements with 25X1A those of and call another meeting to review the resultant planning prior to contacting Distribution: 2 - Monthly Report 1 - Project File 1 - AES Chrono 25X1 C 25X1A9a Approved For Release 2001/07/28 : CIA-RDP78-02820A001000060048-2