MONTHLY REPORT TECHNICAL SERVICES BRANCH ENGINEERING STAFF 1 October - 31 October 1965

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-02820A001100050005-9
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
11
Document Creation Date: 
December 9, 2016
Document Release Date: 
May 8, 1998
Sequence Number: 
5
Case Number: 
Publication Date: 
October 31, 1965
Content Type: 
PERRPT
File: 
AttachmentSize
PDF icon CIA-RDP78-02820A001100050005-9.pdf292.88 KB
Body: 
Approved For Release 2001/08(02 CI DP78-0282OA001100050005-9 MONTHLY REPORT TECHNICAL SERVICES BRANCH ENGINEERING STAFF 1 October - 31 October 1965 25X1A 1. Mr. wife passed-away 12 October 1965. 25X1A 2. Mr. passed the certification examination and 25X1A has been assigned as Chief of the Technical Section on 25X1A 25 October, replacing Mr. who was reassigned - 3. The basic electronic course for Wire Technicians started on 25 October at the Signal Center. This course is intended to help prepare WET's for further electronic equipment training. Mr. 25X1A - is instructing the course in lieu of CREI who started the pro- gram last year. 4. All teletype equipment available for the ATF and Eight-Pac program was prewired and modified. 25X1 A 5- Mr. n his way to Africa to review assignments and training requirements o the technicians. Chief, Technic 1 Services Branch, OC-E 25X1A 25X1A Approved For Release 2001/08/02 : CIA-RDP78-0282OA001100050005-9 Approved For Release 2001/08/02 : CIA-RDP78-02820A001100050005-9 LANGLPY TECMCAL SECTION General 1. The la-3 installation program is well underway. We submitted nineteen work orders to the Space Allocation Division and we activated four ESC-3 circuits this month. The Agency telephone switch has not yet been received., however, the space is available and the preliminary wiring is geared to easily adapt the present Iff-3 installations to the new switch. 2. An Electronic Training Course for eight Wire Equipment Technicians and four CTC's began in the Signal Center Training Roos on the 25th of October. The course is expected to last approximately four months. Wire Unit 1. The routine maintenance schedule for the Main Signal Center and the Outside Area is up to date. 2. Troubles reported and corrected in the Washington Area, are as follows: a. Cryptographic Equipment, Main Signal Center 1 KW-26 38 2 I1-7 5 3 HW-19A 23 4+) hiW-28 5 20 25X9A2 6 ) TOTAL: 93 b. Teletype Equipment 1) Main Signal Center 2) 6th Floor - 3) 7th Floor 247 3 73 TOTAL: 323 3. Outside Area a. The service schedule is one week behind. 25X1A2d1 Approved For Release 2001/08/02 : CIA-RDP78-02820A001100050005-9 Approved For Release 2001/08/02 FV8-02820A001100050005-9 b. Cryptographic Equipment A total of four troubles was reported and corrected. c. Teletype Equipment A total of forty troubles was reported and corrected. d. All of the equipment is operating satisfactory and there were no equipment changes this month. 1i-. Preliminary drawings for the five year planning revision of the Langley Communications Center have been received. 5. We continue to have TWX data set problems on the local KW-7 Security Network. The Wire Engineering Section and the Langley Technical Section are working together on the problem. 6. Assembled and modified the necessary teletype equipment to satisfy two ATF van installations and one Eight-Pac System. Electronic Unit 1. Very-High-Frequency Network No troubles were reported. 2. Microwave a. Nine troubles were corrected. b. The modulator (MU-353) at the State Department was repaired and installed. The microwave standby system is now completely operational. 3. Ciphony a. KY-3 (1) Eighteen troubles were reported and the breakdown is as follows : (a) KY-3 Electronic Troubles - 3 each (b) KY-3 Card Troubles - 3 each (c) Telephone Line Troubles - 8 each (d) Distant End Troubles - 4 each Approved For Release 2001/08/02 :%178-02820A001100050005-9 Approved For Release 2001/08/02 : CIA-RDP78-0282OA001100050005-9 b. New Circuits (1) Replaced the KY-1 with a KY-3 on-circuit #18GW48-08 which terminates between the DCI Office and the White House switch. (2) Replaced the KY-i with a KY-3 on-circuit #18GW-48-15 which terminates between the CIA Watch Office and the White House switch. (3) Replaced the two KY-i's with ICC-3's on-circuit #42GW-43 which terminates between Room 5C18, Headquarters and m Building. (4) Replaced the two KY-1's with KY-3's on-circuit #42GW-61 ch terminates between Roam 3E925, Headquarters and 25X1A9a office in the Pentagon. e. Work Order Status Report (1) Nineteen KY-3 installation plans were prepared and. subaitt to the Space Allocation Division. (2) Emergency AC power wiring and signal cabling was completed by G.S.A. at twelve locations. 25X1A6a d. KY-1 (1) Fifteen units were returned to 25X1 A6a 25X1A (2) Six troubles were reported and corrected. e. U-5 Four troubles were reported and corrected. f. 0-13/Hf-2 Two troubles were reported and corrected. Much trouble was encountered trying to contact Saigon due to defective patching circuits at the Pentagon and a circuit breakdown in Saigon. g. IDX/KEG-13 Six troubles were reported and corrected. Most of the reported troubles are due to the lack of the operator's familiarization of the equipment. Approved For Release 2001/08/02 : CIA-RDP78-0282OA001100050005-9 Approved For Release 2001/08/02 : CIA-RDP78-02820A001100050005-9 h. Hi-Fi Systeas (1) (2) Two troubles were reported and corrected. A new scotchflex audio cable was incorporated to improve the appearance of the Hi-Fi installation in Roos 7EO7, Headquarters OVERTII4E A total of two hundred and eighty-four hours was worked during this reporting period. a. Overtime worked at the Warehouse Project - 200 hours b. Overtime Worked at OC-E/IIPS - 1+5 hours c. Overtime worked on the DCI KY-3 and Watch Office Installation - 39 hours TOTAL: 2 hours Approved For Release 2001/08/02 : CIA-RDP78-02820A001100050005-9 Approved For Release 200110 X02.- ,;G14 RDP78-02820A001100050005-9 TSB SUPPLY SECTION 1. Expenditures - As of 28 October 1965 a total of $119,)#82.10 has been expended for FY 1966. 2. A cross reference list was prepared to show Trigraph Letters to Part Numbers of KG-13 coreboards to facilitate the ordering of KG-13 Parts Kits recommended by OC-E. A KY-3 Parts List of DCRP was prepared for MS.B. to order for Bulk Stock along with 66 KY-3 equipments. Approved For Release 2001/08/02 : CTA=RD 78-02820A001100050005-9 Approved For Release 2001/08/02 : E_ 8-02820A001100050005-9 25X1A6 TECHNICAL SECTION Overtime - 1. Staff Employees 181 Hours. 2. Contract Employees 8 Hours. T & I UNIT 25X1A5a1 1. representative, made repairs and tests on a C-100 Tape Recorder. 2. Forty RR-390 Receivers were received. Twelve units were rejected because of low 1 KC bandwidth, and six were rejected for various other reasons i.e., low 8 KC bandpass, low sensitivity, and weak audio output. The rejected units were repaired, and all receivers were put in stock. 3. The work load has risen to a point where overtime was required to process equipment. Accepted Rejected Forty RR-390 Receivers. 22 18 Fifty Tripplet 630 PLK Meters. 50 0 Twenty-four Delco 5300 Radio Sets. 23 1 Twenty-nine 51S-1 Receivers. 24 5 Ninety CA-12 Cartridges. 90 0 Fifteen Motorola Pockett Receivers. 14 1 Twelve Ampex PR-10-2 Recorders. 8 4 Sixty-eight Northern Keyers and 57 11 Converters. Six RS/506 Receivers. 6 0 Seventeen Motorola H-23 Transceivers. 16 1 Fourteen AN-59 Antenna Couplers. 14 0 IN-PLANT INSPECTIONS 25X1A9a 1. visited - to test and inspect five s, two HFD's, and one LMC. One of the XFK's was rejected. 4. Listed are some of the major items of equipment that were processed this month: Grog? I Fxcludd `r n ?asiatie I 3A 25X1A5a1 Approved For Release 2001/08/02 : C 02820A001100050005-9 OLUELI Approved For Release 2001/08/02 : CIA-RDP78-02820A001100050005-9 ELECTRONIC/TELETYPE REHAB UNIT 1. The Electronic Technicians processed eight PTI's, four repair requests, and fifty-six job orders. 2. The Teletype Section processed twenty-six receiving reports and twenty-seven cargo vouchers. 3. All teletype equipment for the first 8 PAC was modified 25X1A5a1 and shipped tol" 25X1A5a1 4. Two partial shipme electronic equipment for the 8 PAC were sent toribi X1A9a Approved For Release 2001/08/02 : CIA- 001100050005-9 Approved For Release 2001/08/02 : CIA-RDP78-0282OA001100050005-9 5. Two K.S.R.'s were modified with the "Broom" modifi- cations and shipped on 5 October. 6. Five Ampex 350 Tape Recorders were modified for 60 Hz operation. CRYSTAL UNIT Totals Requisitions Crystals New Orders 38 3080 Orders Completed 24 Partials Completed 11 670 Backlog 24 3392 Due Out 14 1811 ENGINEERING UNIT Equipment Standardization - 1. The Century 444 Oscillograph and the Kay 30-0 Variable Attenuator were recommended for the OC Standards List. 2. The Category I of the Stock Status Report was reviewed and recommendations submitted. 1. Test Procedures for the Frederick 1200 Demodulator and the Northern 174 Model 2 Converter were for- warded for comments. 25X1A9a 2. visited_ to check the Test Pro- 25X1A5a1 Ece ure or the SBE-2A. He was informed that the power output specification has been reduced to 250 MW P.E.P. 25X1A5a1 - also agreed to change the tuning procedure in the new manual. The M.F. Meter Position will be used in place of the Audio Channel Meter 25X1A5a1 Position. This is a more accurate method of tuning. was contacted, and he agreed to this change. Approved For Release 2001/08/02 : QZi3-02820A001100050005-9 GROUP 1 Ezcludid Trim Ntnma!lc own;;nding a.-.d deL't3aSificitian Approved For Release 2001/08/02 : :T - 78-02820A001100050005-9 3. A preliminary RS/A-506 Test Procedure was completed. 25X1A6a 25X1A9a 1. processed one hundred eighty-five receiving vouchers and twenty-seven cargo vouchers. 25X1A5a1 2 . was visited to inspect two H-114 Tape Recorders. Three trips were required before both units were accepted. 25X1A5a1 was visited with Two PT-450 Microwave 25X1A9a Systems were visually inspected and accepted. Thirty-five pieces of test equipment were processed and returned to service. MECHANICAL UNIT 1. The new vacuum plating system for the crystal lab was completed. Initial tests indicate that the system is performing well. 2. All Mechanical support was routine and current. POWER UNIT 25X1A9a 1. is on loan to the Engineering Services Branch. 25X1A9a 2. arrived and is being familiarized with F.T.S. procedures. Excluded tnarn autamwtlc d mg ars detuarrw Approved For Release 2001/08/02: CI 2820A001100050005-9 declass{;lca;i~n 4 25X1A9a Approved For Release 2001/08/02 : CIA-RDP78-0282OA001100050005-9 Next 2 Page(s) In Document Exempt Approved For Release 2001/08/02 : CIA-RDP78-0282OA001100050005-9