Inspection Report No. 4 - CK-34 Coder/Keyer(Classified)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-02820A001100050036-5
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 9, 2016
Document Release Date:
May 8, 1998
Sequence Number:
36
Case Number:
Publication Date:
September 7, 1965
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP78-02820A001100050036-5.pdf | 61.18 KB |
Body:
Approved For Release 20
OP" TONAL FORM NO. to
Memorandum
A RDP78-02820A001100050036-5
EP 65-273
25X1A TO The Files: Task Order 90 DATE: 7 September 1965
25X1 A9a ,FROM :
SUBJECT: Inspection Report No. 4 - CK-34 Coder/Keyer with
1. Project Description:
CK-14 is a solid-state coder/keyer to be used with the AS-12.
25X1 C
25X1A
2. Contractual Information:
a. Initial Cost:
b. Request for Procurement c ion: 23 December 1964
c. Initiation Date: 15 February 1965
d. Completion Date: 15 December 1965
e. Deliverable Items: 1 Engineering Model
1 Service Test Model
3. Date of Meeting: 31 August 1965
25X1A It. Place of Meeting:
25X1A9a
5. Persons Attending:
Agency Non-Agency
6. Contractor's Performance:
a. On schedule and expected to remain so: Yes
b. Within obligated funds and expected to remain so: Yes
c. Satisfactory technical progress: Yes
7. Project Status:
25X1A5a1
25X1A
25X1A5a1
Approved For Release 2001 /08/0,V P78-02820A001100050036-5
EP 65-273
SUBJECT: Inspection Report No. 4 - &Wig" with
7. Project Status:
All modules for the engineering model have been built and are
interconnected in a breadboard form. The only problem remaining is
in the voltage regulator module, which is not performing as well as
expected. This, however, does not appear serious. Assembly of the
modules into the final package should begin in about one week.
Completion of the engineering model is expected about the first of
October, or about two weeks later than originally planned. Fabrica-
tion of modules for the service test model has begun. It is hoped
that the two week slippage will be recovered.
25X1i5a1
25X1
25X1 A9a
Distribution:
R&D Subject File
Engineering Section CB/PD/OL
R&D Lab
OC-OS
ESB
Monthly (2)
EP Chrono
25X1A9a Od'-E/R&D-EP bjp
Approved For Release 2001/08/
(7 September 1965)