Inspection Report No. 1 - AR-18 Study Program(Classified)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-02820A001100050039-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 9, 2016
Document Release Date: 
May 8, 1998
Sequence Number: 
39
Case Number: 
Publication Date: 
September 3, 1965
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78-02820A001100050039-2.pdf83.99 KB
Body: 
ernm= Approved For Release 2001 /08/0243CO 78-0282OA001100050039-2 a PTlON11L FORM NO. 10 !NO-101 UNITED STATES GOVERNMENT Memorandum 25X1 A TO The Files: 25X1A9aFR0M : SUBJECT: 25X1A EP 65-271 DATE: 3 September 1965 - AR-18 Study Program with 1. Project Description: This four month program is to measure the error rate performance of the AR-18 1480 wpm triphase receiving equipment as a function of signal-to-noise ratio and pulse jitter and to otherwise investigate the performance of the AR-18 as required. 2. Contractual Information: 25X1 Al a a. Initial Cost: b. Request for Procurement Action: 14 June 1965 c. Initiation Date: 18 June 1965 d. Completion Date: 18 October 1965 e. Deliverable Items: (1) Informal reports at conclusion of Phases I and II (2) Final Report 3. Date of Meeting: 25, 26 August 1965 25X1A 4. Place of Meeting: 5. Persons Attending: Agency Non-Agency 25X1A9a 6. Contractor's Performance: a. On schedule and expected to remain so: Yes b. Within obligated funds and expected to remain so: Yes c. Satisfactory technical progress: Yes 7. Project Status. . Approved For Release 2001/08/02 : C 2d;,00,1100105b039-2 25X1A 25X1A5a1 KPOCT Approved For Release 2001/08/02 :8-02820A001100050039-2 EP 65-271 25X1A SUBJECT: Inspection Report No. 1 - AR-18 Study Program with 25X1A 7. Project Status: Test program number one has been satisfactorily completed. Curves of AR-18 character error rate versus signal-to-noise ratio, pulse jitter, and temperature have demonstrated conclusively that the AR-18 performs poorly. Reasons for this poor performance are being examined. They include the following: a. The AR-18 uses germanium transistors throughout, which / are temperature sensitive and to a large extent 2L! Lo olete, / b. The crystal oscillator ovens all use snap-action thermostats. Contact closures introduce errors due to impul- sive interference. c. The circuit design is often marginal, requiring constant adjustment. 25X1A5a1 25X1A9a 25X1A5a1 /t d. RF mixers are all single ended and introduce considerable phase distortion in the received signal. A decision is required soon as to whether to rebuild the AR-18's or construct a new base receiver for the RS-18 system. To aid in this decision, - has proposed to change the scope of the current work, at no increase in funds, to examine in more detail the cause of the poor performance and to study the performance of the recognition ed in the AR-18. With the verbal concurrence of n 26 August 1965, as authorized OWN to redirect the of or c ange order is being prepared to amend the25X1A5a1 contract. is also preparing budget estimates for rebuilding versus . new design. The estimates are expected within 8 weeks. 25X1A9a Distribution: ,,R&D Subject File OC-OS OC-E/ESB TAP Chrono Engineering Section, CB/PD/OL R&D Lab EP Chrono Monthly (2) 25X1A9a OC-E/TAP, chw (3 September 1965) Approved For Release 2001/08/02 : CIA 2816000 1100050~39-2