Inspection Report No. 4 - RS/B-43 Microwave Communications System(Classified)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-02820A001200060022-8
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 9, 2016
Document Release Date: 
May 15, 2001
Sequence Number: 
22
Case Number: 
Publication Date: 
December 29, 1966
Content Type: 
PERRPT
File: 
AttachmentSize
PDF icon CIA-RDP78-02820A001200060022-8.pdf130.52 KB
Body: 
Memorandum FT 66-281 DATE: 29 December x,966 ai RS B-! Microwave Corrmilrnicatiozis System With Contractual Information: Request for Procurement Action: 12 May 1.966 Initial Cost : CPA' e, Deliverable Items: One microwave field unit, one microwave c, Initiation Date: 24 June 1966 d., Completion Date: 23 July 1967 base unit, five operating handbooks , two , .final engineering reports and test results Date of Meeting: 16 December 1966 . Place of Meeting: 5, Persons Attendin : M c~A Approved For Release 2001/07/28 -: CIA- 78 1 00060022-8 B uy U.S, Savings Bonds Regular ycin the I'dyro Savings Plan Ap0'tjLm.F4M Zelease 2001 h / OI OA00120g060 8? Mr, Agency Non-Agency Mr. Mr,. Contractor's Performance: a, On schedule and, expected, to remain so: No b. Within obligated funds and, expected to remain so: Yes c, Satisfactory technical progress: Yes Approved-For Release 200118 : GIA 01200Q6OQ2,2-8 EP 66-281 ..r SUBJECT: 25X1A5a1 Inspection Report No. 4 - Rs/-B- Microwave Communications System with 7. Project Status: is now coming to grips with -the two rna jbr engineering difficulties-the antenna switch arid. power ot'atput. The oscillator power out is low in the power tr; i iii. ''Ci.ree hundred mW of the oscillator's 360 mW output has ajciu bon achiaved. was having 25X1A5a1 problems obtaining the required, insertion lo:~s in a antenna switch; however, at this visit this.problem was solved. The antennas were delivered by measured their gain 25X1A5a1 as 12.5 db compared to the required 10 d,b. This additional gain 1st inetivav,n , a, t L,__ is about one month behind. schedule; and, getting over the two stumbling blocks described above 'the should catch I A ' y h up. The uu -wwul, output power although .is confident they will achieve the,,, specified, output. At present with this additional antenna gain, the specified range is achievable with the present output power. ocumulated, costs are $b9,540, The Budgeted Accumulated Costs are $81 6 Alt 0 , 9 . hough this shows somewhat underspent, 25X1A5a1 the difference will be absorbed, in. catching .up with the schedule. Distribution: R&D Subject File OL/PD/PCB/CAS R&D Lab OC-OS ESB EP Chrono Monthly (3) OC-E/R&D-EP:' cls/3152(29 Dec 66) Approved For Release '2001 /0V/28'