MONTHLY NARRATIVE SUMMARY REPORT - FEBRUARY 1976

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-02820A001400090004-2
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
3
Document Creation Date: 
December 20, 2016
Document Release Date: 
June 4, 2003
Sequence Number: 
4
Case Number: 
Publication Date: 
September 3, 1999
Content Type: 
PERRPT
File: 
AttachmentSize
PDF icon CIA-RDP78-02820A001400090004-2.pdf157.48 KB
Body: 
Approved For Release 2007/10/23: CIA-RDP78-0282OA001400090004-2 Memorandum TO :Director of Communications FROM :Chief, Communications Engineering OCE-M76-094 SUBJECT:Monthly Narrative Summary Report -- February 1976 1. The final mailing of the AFT RFP was made on 11 February with many of the prospective bidders receiving the RFP as late as 19 February. Because of late receipt, an incorrect contact telephone number, and omission of instructions on how to respond, several requests for exten- sion of the due date for response were received. System Engineering Laboratories (SEL) informed the Contracting Officer they are not planning to bid. 25X1 2. officially requested a delay of one month in the installation schedule for ARS-V, beginning with system pre-acceptance A response was forwarded to Office of Logistics, Procurement Division, requesting that the delay be denied. 3. The Barry Research (BR) time-delivery modems and the American Computer Communications (ACC) error-control units were received, successfully tested at and 25X1 shipped to is scheduled to depart in early March to install an con uct tests using the equipment on the HF link between the two stations. In addition, plans were coordinated with to conduct tests using the BR and FSK equipment on the circuit in April. 25X1 to Oconcerning resource utilization and the implementa- tion schedule. The meetin resulted in a memorandum of 25X1 understanding wherein agreed to provide an additional processor for expansion purposes and the Agency agreed to purchase an additional PCTG to improve VDU response times and 25X1 growth capability. agreed that there would be no 4. A meeting held on 27 February meeting was called impact upon the program schedule. 25X1 25X1 Approved For Release 2007/10/23: CIA-RDP78-0282OA001400090004-2 between Agency and personnel was to discuss the CDS project status. The to resolve issues addressed in a letter Approved For Release 2007/10/23: CIA-RDP78-0282OA001400090004-2 by 14 Si 3i ~v[~. :16w 1~ j L ` SUBJECT: Monthly Narrative Summary Report -- February 1976 5. The Office of Logistics occupied their new quarters in the 0 Building on schedule, 5-6 February, with all required secure voice and data systems functional. All indications are that Phase II secure voice and data require- ments will be met in the necessary time frame. 6. OC has received $200,000 for continuation of work on ITS-W. 7. The Satellite has continued to function erratically with many spin-ups occurring during the month. However, has initiated an investigation into a new computer-contro le , rate-mode scheme which shows promise of regaining stabilization of the satellite. In the Satellite. was completed. are operating satistactorily via The SC-lA installation at 8. The preliminary plans for relocation of the receiver site to were completed. Funds were transferred or the preliminary site preparation, and negotiations are in progress for award of contract for Technical discussions have been conducted with who will probably compete tor rnei contract. Each company claims that delivery of the isochronous multiplexing equipment required for the black trunk can be made by 30 July 1976. 9. Bench evaluation of the first-article, MX-113 SKYMUX TDM is near completion. Test procedures are being written to address the system interface evaluation, which is to commence o/a 8 March at 0 Procurement actions for the additional equipment required to implement 0 SKYMUX field stations are being prepared. 10. exhibited a new failure mode in mid- February. Both noted the spacecraft did not respond on 12 and 13 February. The satellite appears intermittent. OD1E tasked to send an engineer to to gather additional data. At the end of the month, there is no explanation for the erratic behavior. 11. The engineering model of the CV-651 IF downconverter/ control unit and associated 651S receivers was installed in a 25X1 25X1 25X1 25X1 Approved For Release 2007/10/23: CIA-RDP78-0282OA001400090004-2 Approved For Release 2007/10/23: CIA-RDP78-0282OA001400090004-2 NOW SUBJECT: Monthly Narrative Summary Report -- February 1976 osition for test purposes. is arranging 2 PD p - for on-the-air, medium-speed test schedules wit 13. The ASU-110 audio scrambler units produced by as a replacement for the ML-79, were found to be operationally unacce table. Further engineering work is being undertaken by 14. An action plan covering the RS-708/709 update program was formulated. 15. A concept report and a feasibility model of an updated version of the CU-37 control unit were presented to OC-0/COD for their review. 16. An OTS third-track recorder (CMY-2) is being investi- gated as a possible accessory for the SV-8. 17. The SKYLINK antenna installation was completed by SED/FAB/SS during February. 18. Market research for a solid state ATE to test digital Three printed circuit cards ATE General Radio, Data Test, Distribution: OC-IC (Archives) Origina% - D/C0; DD/C0; OC-EXA; 0 -P&B; 1 - OC-0; OC-0/D 1 - OC-S; O& CS 25X1 25X1 Approved For Release 2007/10/23: CIA-RDP78-0282OA001400090004-2