REQUIREMENTS BOARD MEETING THIS DATE CONCERNING BEACON REQUIREMENTS.

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-03153A000700020022-1
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
1
Document Creation Date: 
December 23, 2016
Document Release Date: 
May 8, 2014
Sequence Number: 
22
Case Number: 
Publication Date: 
May 29, 1959
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP78-03153A000700020022-1.pdf63.69 KB
Body: 
Declassified in Part- Sanitized Copy Approved forRelease2014/05/12 : CIA-RDP78-03153A000700020022-1 May 29 1959 MEMORANDUM FOR THE RECORD: SUBJECT: Requirements Board Meeting this date concerning Beacon requirements. Attending; 1. requested a status report from COMM) on the Beacon for interim requirement. This, according tc File STAT is mith a frequency change to the 1500-1750kc range of aircraft ADF receivers. This as tested on west coast and proved satisfactory for short range if weather was fair to good. Static from electrical disturbances mould be a factor and for this reason FE feels they cannot use as a ppiaary system during this period of year in Tibet. 2. The foregoing focused attention back on any other system that would be useable in this specific type of situation. The under- signed volunteered that possibly at the altitudes contemplated Sarah would be satisfactory bearing in mind it is not compatible with existing military equipment. The terrain factors, shape and characteristics of lobe mere explained and the factor' w of operating at that altitude 2$-30,00(0 mith terrain of 14 to 21,000' made it impossible to predict ranges and consistency. 3. 'Possibility of lifting antenna into air via ballooa, mainly for use with the low frequency beacon, were discussed and the undersigned mentioned the fabric is using in hot air applications, This is Of considerable interest to commo. 4. The Westponder Beacon is out. Concensus o4=-44ftion was that the straight commo high freq. al-CM vias better and no further mork is contempleted with Commo has requests for proposals out to and one other Co. for the basic requirement, lom altitude, 20 mile range etc. however it will be at least 6 months before any progress in satisfying this requirement will be evident. 5. requested WAD to test Sarah, all altitudes and rages with a viem tomard satisfying this interim FE requirement or to possibly use as backup with the high frequency. He as ad- vised me mould only have the Helio to 15 e and would do all testing possible Aithin the available 2 week pe STAT 01 I-% I STAT STAT STAT STAT STAT STAT Declassified in Part - Sanitized Copy Approved for Release 2014/05/12 : CIA-RDP78-03153A000700020022-1