PROJECT 125D; 35MM TIME LAPSE CAMERA
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-03172A000300020061-1
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 22, 2016
Document Release Date:
February 14, 2012
Sequence Number:
61
Case Number:
Publication Date:
March 5, 1958
Content Type:
MEMO
File:
Attachment | Size |
---|---|
![]() | 71.78 KB |
Body:
Declassified in Part - Sanitized Copy Approved for Release 2012/02/14: CIA-RDP78-03172A000300020061-1
10 SW In
25X1
5 March 1959
SUBJECT : Project 125D; 35 mm Time Lapse Camera
1. Time and Place: February 25, 1959,
2. Attendance:
3 PurPose To review progress and discuss change of scope.
4. Discussion: The original contract dated 7 May 1956 set
forth an agreement to build one (1) prototype 35 mm Time Lapse
Camera.
During the interim of 7 May 1956 and this date., the re-
quirements and advancement of the state of the art photographically
and electronically made it mandatory that APD search and investigate
various claims that the old concept of photography was about to
undergo a revolutionary change. This change has taken place--
Optically, Lenses and Sensors; Chemically, new high speed films,
and Electronically controlling the mechanical moving parts of the
entire camera system. All these advancements are being incor-
porated into the Pulse Operated Cameras.
It is estimated that these cameras are at least ten years
ahead of the state of the art as it now exists acme cially,
Im"
25X1
25X1
on 40 R'V re*s-2/_&_ RYL:'- `lZ
?sie COMP .Q -5(0 *~'z
"la CLASS _,5__ t,"RC"S R.V ;,l "cS _e- ---
JUST 2 Z NEXT REV -Zd / ALTH. HF, 33.2
Declassified in Part - Sanitized Copy Approved for Release 2012/02/14: CIA-RDP78-03172A000300020061-1
Declassified in Part - Sanitized Copy Approved for Release 2012/02/14: CIA-RDP78-03172A000300020061-1
?
Memorandum For: The Record
Subject : Project 125D; 35 mm Time Lapse Camera
Date : 5 March 1959
The present status of progress resulting from a change
in scope is that the design is about 70% complete and the first new
prototype may be ready for testing around the 15th of May 1959?
The testing time required by interested parties, changes
if recoamended thereto, will determine delivery schedule of remain-
ing units: However, the power supply (battery) has not been firmed
up at this time, the reason being that rapid advancement is being
made by manufacturers batteries, Battery design is being followed
very closely in order to
recoamend the most desirable paver source to operate ese cameras*
has been granted the additional monies requested
to eoaplete contract and are performing satisfactorily.
7SSAPDC3
Distribution:
Orig. - P-125D
1 - AEH
1 - Chrono
TSS/APD/0B:AEH-jlg (5 March 1959)
COI SIDES%MTIAL
Declassified in Part - Sanitized Copy Approved for Release 2012/02/14: CIA-RDP78-03172A000300020061-1