PROJECT MONITOR (SANITIZED) UNDER P-115, TRANSISTORIZED RECEIVERS AND TRANSMITTERS AND P-101, INFRARED COMMUNICATION SYSTEM

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-03300A001600020105-5
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
4
Document Creation Date: 
December 22, 2016
Document Release Date: 
December 28, 2011
Sequence Number: 
105
Case Number: 
Publication Date: 
April 22, 1954
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP78-03300A001600020105-5.pdf147.12 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2011/12/28: CIA-RDP78-0330OA001600020105-5 22 April 1954 K 1DRAI~d[ YOR: BROORD under P-115, Transistorised Receivers and Trans- sitters and P-101, Infrared Cammication System Project Monitor at 1. Time and Place of Meeting: The meeting is held 13 April at the 2. Attendance: 3. Discussion: a. Progress Daring March: The initial report ch vas to outline the planned work an the project from viewpoint vas not ready for the meeting. Previous deadlines for this report of 1 march and 22 March were not net. Rssentially nothing has been accomplished on the project since our last meeting early in March. b. Results of Meeting: main objective of the APD representatives was to have run through the various phases of the project giving the names o persons working on the project, the number of arm months per month, the tentinistion dates of the phases. The following chatt is the result. Coofireatiaa of these results will be given in the first report now due to be in the mail by 30 April. P-115 Work Schedule April, 'S4 2 men months 3 man months JU37 August 4 man months 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2011/12/28: CIA-RDP78-0330OA001600020105-5 Declassified in Part - Sanitized Copy Approved for Release 2011/12/28: CIA-RDP78-0330OA001600020105-5 P-115 Work Schedule (Could.) September November December thru May, '55 8 man acnths June and July '55 9 am months (previous 10) September October, Mov.j Dec. '55 8 man acatbs 7 mans months * Request for clesrance filed Alternates: ea- Cleared Technical. Progrss Schedule Report Dates: First report 30 April 1954- 0" report each following month. and. of Phase I: 1 November 1954 End of Phase II: (To be included in 30 April report) Bad of Phase III: 28 December 1955 The asterisks indicate the present clearance situation. was requested to file PS4's for the remaining u nrsgussted perm . It should be noted here that the project en r on this project 0 COMM an duty as a new amp3ay6e at 12 April l95k. 4. Discussion on P-101: a. Progress During= A description of the work completed during March is given 25X1 25X1 in the report of 7 April. In brief, investigation of sources 25X1 and seas ve is is continuing. Work is being started on mech- anical modulation methods. Two alternators for power sources have been ordered to go with the model airplane gasoline engines already received. Consideration is being asde of a method of non-linear speech trans- mission which would sisplity the construction of mechanical modulation schemes. 8?mnidth studies are being initiated In the recently completed darkroom. Declassified in Part - Sanitized Copy Approved for Release 2011/12/28: CIA-RDP78-0330OA001600020105-5 Declassified in Part - Sanitized Copy Approved for Release 2011/12/28: CIA-RDP78-0330OA001600020105-5 b. Results of lasting: 81ailarly to P-115 the overall project was received and the persons to be used on the work as a function of tine wre listed. Dates were set as goals for the tads of the various phases, ws warned that the funds allocated to P-101 are two year c will expire 30 April 1955 as far as their work is ececerned. again complained that project engineer 25X1 an P-201J, not been cleared. It was point" out that his clearance was probable in the near future and that they should supply a sub- stitute until that time. clearance was received 14 April 25X1 1954 and F ~ was notified by telephone). 25X1 The chart below indicates the results of the organisational part of the seating. P-lAl Work Schedule June 29, '53 Dec. 11 153 January= Feb. 154 Contractual Start Actual Start of Work (Sae four) (Same four) (June 29 to Dec. is '53) 2 an aoath 4 men 24 man month 1-man non April Previous 4 sad 1 arm swath 14 arm aoath 25X1 25X1 fty (Previous 6) 34 am aenth Jul~y August Be 4UM wj, '55 8 previous 5.3 aan aooth 6.8 am noath Jan month e Clearance requested Alternates: w Clearance granted Additional detailing, drafting and model shop tine not sham. 3 CON E I ~ -VIA ' I L Declassified in Part - Sanitized Copy Approved for Release 2011/12/28: CIA-RDP78-0330OA001600020105-5 F Declassified in Part - Sanitized Copy Approved for Release 2011/12/28: CIA-RDP78-0330OA001600020105-5 Technical Program. Schedule Reports due monthly as 1st of aonth. End of Phase I (Study): 31 Jy 1954 End of Phase IIa: To be included in next aostbly report. End of Phase lib: To be included in next anthly report. 5. Actions: (1) Viii ca^:piete and aril the f*rst report on P-135 by 30 April 1954. 'Phis =oort Vill contain a detailed plan of the work as understood by plus a review of this meeting. (2) Viii complete a report on P-301 for April by 1 May 1954? 701- repo Vil contain a summary of the aonth's irk including the results of the beam. width studies and a review of this meeting. (3) ~ Viii file PSQ's for the remainder of per- scowl to be used on P-101 and P-115 as soon as possible. 25X1 25X1 25X1 25X1 b. APD: (1) APD will insure that are erpeditdd. clearance requests Distribution: / Orig. - P-101 1 - P-115 1 - AST 1 - Ghrono AST/br -4- S//BPD Declassified in Part - Sanitized Copy Approved for Release 2011/12/28: CIA-RDP78-0330OA001600020105-5