PROJECT MONITOR (SANITIZED) UNDER P-115, TRANSISTORIZED RECEIVERS AND TRANSMITTERS AND P-101, INFRARED COMMUNICATION SYSTEM
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-03300A001600020105-5
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
4
Document Creation Date:
December 22, 2016
Document Release Date:
December 28, 2011
Sequence Number:
105
Case Number:
Publication Date:
April 22, 1954
Content Type:
MEMO
File:
Attachment | Size |
---|---|
![]() | 147.12 KB |
Body:
Declassified in Part - Sanitized Copy Approved for Release 2011/12/28: CIA-RDP78-0330OA001600020105-5
22 April 1954
K 1DRAI~d[ YOR: BROORD
under P-115, Transistorised Receivers and Trans-
sitters and P-101, Infrared Cammication System
Project Monitor at
1. Time and Place of Meeting: The meeting is held 13 April
at the
2. Attendance:
3. Discussion:
a. Progress Daring March:
The initial report ch vas to outline the
planned work an the project from viewpoint vas not ready
for the meeting. Previous deadlines for this report of 1 march and
22 March were not net. Rssentially nothing has been accomplished on
the project since our last meeting early in March.
b. Results of Meeting:
main objective of the APD representatives was to
have run through the various phases of the project giving
the names o persons working on the project, the number of arm
months per month, the tentinistion dates of the phases. The following
chatt is the result. Coofireatiaa of these results will be given
in the first report now due to be in the mail by 30 April.
P-115 Work Schedule
April, 'S4
2 men months
3 man months
JU37 August
4 man months
25X1
25X1
Declassified in Part - Sanitized Copy Approved for Release 2011/12/28: CIA-RDP78-0330OA001600020105-5
Declassified in Part - Sanitized Copy Approved for Release 2011/12/28: CIA-RDP78-0330OA001600020105-5
P-115 Work Schedule (Could.)
September
November December thru May, '55
8 man acnths
June and July '55
9 am months
(previous 10)
September October, Mov.j Dec. '55
8 man acatbs 7 mans months
* Request for clesrance filed Alternates:
ea- Cleared
Technical. Progrss Schedule
Report Dates: First report 30 April 1954-
0" report each following
month.
and. of Phase I: 1 November 1954
End of Phase II: (To be included in 30 April report)
Bad of Phase III: 28 December 1955
The asterisks indicate the present clearance situation. was
requested to file PS4's for the remaining u nrsgussted perm . It
should be noted here that the project en r on this project 0
COMM an duty as a new amp3ay6e at 12 April l95k.
4. Discussion on P-101:
a. Progress During=
A description of the work completed during March is given
25X1
25X1
in the report of 7 April. In brief, investigation of sources 25X1
and seas ve is is continuing. Work is being started on mech-
anical modulation methods. Two alternators for power sources have been
ordered to go with the model airplane gasoline engines already received.
Consideration is being asde of a method of non-linear speech trans-
mission which would sisplity the construction of mechanical modulation
schemes. 8?mnidth studies are being initiated In the recently completed
darkroom.
Declassified in Part - Sanitized Copy Approved for Release 2011/12/28: CIA-RDP78-0330OA001600020105-5
Declassified in Part - Sanitized Copy Approved for Release 2011/12/28: CIA-RDP78-0330OA001600020105-5
b. Results of lasting:
81ailarly to P-115 the overall project was received and
the persons to be used on the work as a function of tine wre listed.
Dates were set as goals for the tads of the various phases,
ws warned that the funds allocated to P-101 are two year c
will expire 30 April 1955 as far as their work is ececerned.
again complained that
project engineer
25X1
an P-201J, not been cleared. It was point" out that his clearance
was probable in the near future and that they should supply a sub-
stitute until that time.
clearance was received 14 April
25X1
1954 and
F ~
was notified by telephone).
25X1
The chart below indicates the results of the organisational
part of the seating.
P-lAl Work Schedule
June 29, '53 Dec. 11 153 January= Feb. 154
Contractual Start Actual Start of Work (Sae four) (Same four)
(June 29 to
Dec. is '53)
2 an aoath
4 men
24 man month
1-man non
April
Previous 4 sad
1 arm swath 14 arm aoath 25X1
25X1
fty
(Previous 6)
34 am aenth
Jul~y August Be 4UM wj, '55
8 previous 5.3 aan aooth
6.8 am noath
Jan month
e Clearance requested Alternates:
w Clearance granted
Additional detailing, drafting and model shop tine not sham.
3 CON E
I ~
-VIA
' I L
Declassified in Part - Sanitized Copy Approved for Release 2011/12/28: CIA-RDP78-0330OA001600020105-5
F
Declassified in Part - Sanitized Copy Approved for Release 2011/12/28: CIA-RDP78-0330OA001600020105-5
Technical Program. Schedule
Reports due monthly as 1st of aonth.
End of Phase I (Study): 31 Jy 1954
End of Phase IIa: To be included in next aostbly report.
End of Phase lib: To be included in next anthly report.
5. Actions:
(1) Viii ca^:piete and aril the f*rst report on
P-135 by 30 April 1954. 'Phis =oort Vill contain a detailed plan of
the work as understood by plus a review of this meeting.
(2) Viii complete a report on P-301 for April
by 1 May 1954? 701- repo Vil contain a summary of the aonth's irk
including the results of the beam. width studies and a review of this
meeting.
(3) ~ Viii file PSQ's for the remainder of per-
scowl to be used on P-101 and P-115 as soon as possible.
25X1
25X1
25X1
25X1
b. APD:
(1) APD will insure that
are erpeditdd.
clearance requests
Distribution:
/ Orig. - P-101
1 - P-115
1 - AST
1 - Ghrono
AST/br
-4-
S//BPD
Declassified in Part - Sanitized Copy Approved for Release 2011/12/28: CIA-RDP78-0330OA001600020105-5