(SANITIZED) PROPOSAL FOR A TERRAIN WARNING DEVICE

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-03300A001900010017-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 22, 2016
Document Release Date: 
May 23, 2011
Sequence Number: 
17
Case Number: 
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP78-03300A001900010017-1.pdf116.44 KB
Body: 
Sanitized Copy Approved for Release 2011/05/23: CIA-RDP78-03300A001900010017-1 MEMORANDUM FOR: Chief, Technical Services Staff SUBJECT: (Proposal for a Terrain Warning Device REF~RIIQCE: Memo for C~PP from C~TSS dated 4 December 1956, subject, "Terrain Warning Device" 1. The subject proposal was considered by the DD~P Materiel Board on 15 January 1957. The Board recommends that your Staff conclude negotiations with for the development program as outlined in paragraph 3 of reference memorandum to include the production of a prototype with the general charac- teristics of the device described in the proposal attached thereto . 2. The Transportation Working Group is presently formalizing a development or such a device. Therefore, the contract with should be sufficiently flexible to permit such mo ca on as may be necessary to include any operational characteristics stated in the formalized develo~ent requirement which are not presently included in the proposal. 3. I lof your Staff has been furnished a copy of the development requirement for this device in preliminary form to assist him in concluding negotiations with Westinghouse. DD~P Materiel Board ~- Sanitized Copy Approved for Release 2011/05/23: CIA-RDP78-03300A001900010017-1 Sanitized Copy Approved for Release 2011/05/23: CIA-RDP78-03300A001900010017-1 COPY MBI-5701 7 January 1957 MEMORANDUM FOR: Chairman, DD~P Materiel Board SUBJECT Terrain Warning Devices REF1J'RENCES a. Memo for C~TSS from CPP, Subject: Investigation of Terrain Warning Devices, dated 12 October 1956 b. Memo for CPP from C~T3S, 3ub~ect; Terrain Warning Devices, dated 4 December 1956 1. It is believed that the i i d proposal for a terrain 25X1 warn ng ev ce described in refe nc s mo 2. The Air-Maritime Division has a criti a satisfactory terrain warning system anti the the proposal contained in reference b. to proc of research and development for the prototype st promising. cal requirement for PP Staff concurs in eed with the program equipment. 3. The commitment of t funds for additional units can 25X1 no be made at this time s e basis of the ~..,,,.,..._, T~ ~ _ ~ _ ~_ _ ~ _ , . _ 25X1 be taken for these units provided test results substantiate their superiority over similar devices which may be available at the time. ~. It is requested that the DD/P Materiel Board act favorably and expeditiously on the research and development program proposed in reference b. Chief Psychological and Paramilitary Staff Sanitized Copy Approved for Release 2011/05/23: CIA-RDP78-03300A001900010017-1 Sanitized Copy Approved for Release 2011/05/23 :CIA-RDP78-03300A001900010017-1 22 January 1957 Subject: Terrain Avoidance proposal Reference: AAN-30342 Letter Dated 21 December 1956 The referenced letter submitted a proposal for Terrain Avoidance Systems which has subsequently been revised eliminating Item 4, flight test of a breadboard model, Forwarded with this letter are two copies of our revised proposal x-30342 covering the following items of work: Item (1) Study phame to result in detailed specifications of the Terrain Avoidance Equipment. Item (2) Develop, fabricate and perform tests of a breadboard model. Item (3) Fabricate one developmental flyable model. Delivery is quoted as Follows: Item (1) -One month after go ahead. Item (2) -Thirteen months after go ahead. Item (3) -Thirteen months after go ahead. The delivery of Items 2 and 3 is predicated on no del be in the approval of the detailed specifications level ~ ~ incurred opal under Item 1. For this effort a fixed price quotation, subject to xede.te~~tion as outlined in contract FL-3011, of $525,429 is submitted. This includes profit based on 796 of the estimated cost. Cost Analys a for each of the above items are enclosed. Considering the nature of the work involved, it is pr osed that redetermination b oP is acceptable to n completion of tha 8th month of work. It 25X1 to include this work under a new contract. Very truly yours, Sales Engineer Sanitized Copy Approved for Release 2011/05/23 :CIA-RDP78-03300A001900010017-1