(SANITIZED) EQUIPMENT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-03330A000800060018-4
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
1
Document Creation Date:
December 23, 2016
Document Release Date:
April 23, 2014
Sequence Number:
18
Case Number:
Publication Date:
August 12, 1953
Content Type:
MEMO
File:
Attachment | Size |
---|---|
![]() | 65.18 KB |
Body:
Declassified in Part- Sanitized Copy Approved forRelease2014/04/29 : CIA-RDP78-03330A000800060018-4
CAXILI ?7 tii?
Securitf Information
MEMORANDUM FOR THE RECORD
CONFIDENTIAL
SUBJD3T: DM 503 CIFAX Equipment
3 "c2d67
1. On 10 August 1953 the writer met with of NSA to STAT
discuss the status of the DEX 503 equipment now being tested by CIA
on a circuit established between OCD offices in Riverside Stadium
and M Building. The following pertinent facts were established:
a. The models now in our possession will be retained on a
loan basis until approximately 1 January 1954.
b. On or about 1 January 1954, CIA will receive "design
approval" models, on a loan basis, and will return the models
now being tested. These "design approval" models will be re-
tained by CIA until late summer or early fall of 1954.
c. In the fall of 1954 "modified engineering" models (or
prototypes) will replace the "design approval" models and will
be retained on a loan basis until the production models are
available for purchase. It is not expected that the production
models will be available until the spring of 1956.
d. /f during the test period the "design approval" models
prove to be satisfactory, nIA may place a direct order for the
"modified engineering" models. This order will be included in
the service test contract entered into by NSA. CIA funds will
be required for this purpose.
e. It is anticipated that the price of the DFX 503 equip-
ment will not exceed $20,000 per unit. If it is decided to
purchase "modified engineering" models in the fall of 1954, it
is believed that not more than eight units would be required.
Therefore, for budgetary purposes, not more than $160,000 will
be required for CIFAX equipment in fiscal year 1955. If it is
decided to wait until the production models are available, no
budget commitment will be required prior to fiscal year 1957.
It is not possible at this time to estimate the number of units
that night be required at that time.
DAT?
ST
000 11REV
01110 COMP -33? OPI
TYPE
0510 CLASS PAGES
WI GLASS
NEXT ACV 2.O,O
AVM
NO Ted
STAT
JUST
OC
,OC-P (Budget Officer)
VOC-E
CC-S
CONFIDENTIAL
Declassified in Part - Sanitized Copy Approved for Release 2014/04/29: CIA-RDP78-03330A000800060018-4