AS-6 DATA TELEMETERING SYSTEM, RD-103, T.O. 8
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-03330A004100090012-0
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
1
Document Creation Date:
December 22, 2016
Document Release Date:
January 4, 2012
Sequence Number:
12
Case Number:
Content Type:
MISC
File:
Attachment | Size |
---|---|
![]() | 60.77 KB |
Body:
Declassified in Part - Sanitized Copy Approved for Release 2012/01/04: CIA-RDP78-03330A004100090012-0
SECRET
SDN No. et)i- /-z.z, /' 3
Page of 5-
C opy ? of g
i
TASK 8. ( AS-6 DATA TELEMETERING SYSTEM
,
Field Unit: Tests conducted in the Washington area
on the service test model of the Field Unit Power Amplifier indicates
that I-65A tetrodes can be substituted for the PL-177 tetrodes now
employed, with only minor retuning necessary. This change can be
accomplished when the final model is returned for sealing prior to
further testing.
Base Station: A representative spent six weeks
in assisting with the installation of the AS-6 Base Station, and fur-
ther, participated in an abbreviated test program which involved all
built components of the system.
Test results generally were satisfactory, however,
there were minor discrepancies in the Field Unit channeling, which
so far has been attributed to rough handling.
A considerable portion of the overseas six weeks'
period was spent training personnel on the maintenance and opera-
tion of the AS-6 Base Station. Upon completion of this training,
it is felt that these people can maintain this Base Station equip-
ment, providing adequate spare parts are provided.
TASK 9. LINEAR EXCITER FOR THE AS-LEA
This program has been delayed indefinitely, pending
decisions on the future course of the AS-4B Program. This action
has been directed by the cognizant Government engineer.
TASK 10. FABRICATION OF RS-16B
Work on this Task is nearing completion. To date, nine
Field Units have been delivered to the Government. The tenth Field
Unit is being retained by as Government fur-
nished equipment assigned to Task An eleventh Field Unit, made
up of assemblies constructed under the spare parts program, and a
chassis wired during the engineering phase of the program will be
delivered along with the remaining spare parts early in the next
reporting period.
25X1
DOC ~~-- REV DATE 1 +oad BY y~/~r s y
ORIG COMP 05DPI TYPE lZ_
ORIG CLASS PAGES L REV CLASS
JUST NEXT REV a-4/O AUTHI MO 10.1
y L_V_ll L_I_
Declassified in Part - Sanitized Copy Approved for Release 2012/01/04: CIA-RDP78-03330A004100090012-0