k
11111Ik
Declassified in Part - Sanitized Copy Approved for Release 2012/06/11: CIA-RDP78-03424A000500070021-8
?WIVIET7-
W
30 April 1959
,Zet
MOO 27
25X1
SDN 9-05382/224
In reply refer to:
25X1
/
25X1
25X1
ILLEGIB
?
?
Attention:
Subject:
Gentlemen:
Contract RD-103; BR-16
Communications Equipment
submitted a proposal,
dated 27 April 1959, for design, development and fabrication of BR-16
Communications Equipment.
Through an administrative error, Page 1 of Exhibit "C" in-
correctly shows the estimated cost breakdown for Items 1 and 2; in addition,
Page 2 of Exhibit "C" shows the estimated cost breakdown as applying to
Item 3.
Contractor wishes to inform the Government that the estimated
cost breakdown on Page 1 applies to Items 1 and 3 and the estimated cost
breakdown on Page 2 applies to Item 2.
OS_,flY DAT1 By 04 (75540
Ills COMP Ogg on rot 0/
lilt SLASSS...- PAM 7 au
MT w 2-6/ 0 A11111i ma 1114
Very truly yours,
CONFIDENTIAt.
Declassified in Part - Sanitized Copy Approved for Release 2012/u6/11 : CIA-RDP78-03424A000500070021-8
25X1
25X1
25X1
25X1
25X1
25X1
Declassified in. Part - Sanitized Copy Approved for Release 2012/06/11 : CIA-RDP78-03424A000500070021-8
Uti
Ar 9-653168/0-#
DI rads, rater
7
25X1
25X1
,
Atteation:
343eat:
Proposel;
25X1
contrast no-lo3
Additional work to he performed
Gentleman.
is pleased to submit I tire pro-
25X1
poeel for design,
development end fabriastion
et BR-16 Commasioations Squip-
nest in accordance with d.iscussions with your tech:lima repreadatativem.
This proposal consists at tle following EXhibite-
Rxhibit "A? ? Statement of Vork
lzhibit 17D" - Technical Ddsoussion
&Alba "Cs,"? Rstinated cost Breakdown
-Ixhibit 4re Delivery Sabedule
Ti is ?anticipated that any contract resulting from this pro-
posal will be set forth am an additional Tisk Cyder to Contract RD-103 and
that the terms and *auditions of that contract shall apply 'ft +ultimate&
CfAt and delivery schedule Met tertkbereinimar he eensideived fire for a
period of sixty (60) dors from the date of thie letter.
Re ts for eddit
ion he directed to
I_ Declassified in Part - Sanitized Copy Approved for Release 2012/06/11: CIA-RDP78-03424A000500070021-8
Ehelosures
very truly years,
TIAL
25X1
25X1
25X1
Declassified in Part - Sanitized Copy Approved for Release 2012/06/11: CIA-RDP78-03424A000500070021-8
?
?
rte* I.
STAprinfr. or WORK
rEfirrrilir *An
Page of
Design,develop end fabricate QM (1) transportable Field
Unit Deceiving ;et, designated BR-I6, JAW:Wing psfts
and simulator.
Item 2. ftbricate widitional BR-16 set including spare parte end
simulators.
nal 3. /nformal Instructive Manual.
Declassified in Part - Sanitized Copy Approved for Release 2012/06/11: CIA-RDP78-03424A000500070021-8
25X1
25X1
25X1
25X1
Declassified in Part - Sanitized Copy Approved for Release 2012/06/11: CIA-RDP78-03424A000500070021-8
Og
TICIINICAL DTS2USEI/ON
The followtsg dieouesion outlines the method by which the Contractor
currently expects to proceed with the Work? severed by this yroposal. This
lexhibit is not indended to modify or limit the Statement of Work as set forth
in Aschibit "A'.
An operattomt need has boon envisioned requiring highly trans-
portable equipment; designated the BR-160 capable of receiving and recording
118-16A and PS-16B rield Unit treeemiseions. Correctly, these treeemdssions are
being received as racordedby the large AS and AS-4A Base Tersdnale. How.
ever, this new eormept will permit receiving eqtapment to he loftiesd at
stratteic positions now denied the larger BieseTerelaals. The propoaed 8,146
soy be stationed at SUb-Base Installations as aroma of slaking it cramps*
and easily trensportUble. Use of this new equipment has the further adventage
of releasing the larger Base-Terainele for high-speed, hi YO] traffic
for which they vere prinforlay. denten*.
!Arcing preliminary discussions with Government engineers, it was
agreed that the appromdivill be *loft Line* now being established by the AS-5
Sub-Base ,%lmenalcation Sqaipmeet. It Is planned that two packing canes viii
comprise the syeteo. One case will *contain reeeiving, reeognition and'USie
? elements, and the other Mlle will contain the reeorder sad eystes power supplies.
Meemfist as is possible, AS.5 designs will be used; however, in those *yeas Where
new designs are neceseary, teehniques similar to those met 'in the ?041,131 be
employed. Deosesse of somewhat similar field operation condition* between thi
AS-5 end the eP-16, the underlying philosophy will be to make the units similar
in oder that training of operating sal maintenanee peersonnelp,as well as
obvious logistics problemeotmey
The receiver case wIll contain ome r-f front *ads fire i.t
moplifiers and five crystal filters. These nese are all now being themsloped
for the A3-5 equipment, re eddition, the resolver movement mill contain
A recognition wit similar to the one being used in the AS-5. The ABC, threshold'
ieverter, recosder driver, sod other circuits will be modularised and egy be
either identical or very stellar to their earm0Pcndidg lonetarparts lathe A5-5.
Wirevrapped models boards will provide the bulk of all intoreommections.
The Nenond peeking ease gill contain the Vilissonherldsidsvd.11 be
pareheeed sad modified, as is done in,the saes of the A8-5. The system paver
supplies whit* will be in thessainsmeedestgms, will be located in the second
ease adj;eset to the visleorder. The power supply will have two eUb-units.
one will regulate line voltege, and the other will provide all eseessary
DC voltages to the system.
Ome inherent disadvantage at this propeloodArAtemie its look of
receiver diversity, althorn& cereal *Usti= of reaciviegAelei,ions and ?per.
atite frequencies will definitely help. The tnOustOn,of diverliti reception
SP issA0111111ba I
Declassified in Part - Sanitized Copy Approved for Release 2012/06/11: CIA-RDP78-03424A000500070021-8
25X1
25X1
25X1
25X1
Declassified in Part - Sanitized Copy Approved for Release 2012/06/11: CIA-RDP78-03424A000500070021-8
-SECREV
crarBrrNier
25X1
25X1
in the B146 has been avoided ta order to eptiedse portability and to preserve
space. Ts manrlocations, it may be diffietat to erect separate arteteae,
parlaularly if they ?may a large area, as would eenventioaally be in the ease
ea.* a pair Of Ohnebics are employed. Ay emitting receieurdivereity, this area
as well as the *is* and weight of the System are substenttnae re:eetd. While
actealfield tests of predeeesOor equipmeut elearly4Weethe:virtues of receiver
diversity, it is intended that the inereased portability off. by the proposed
system viii allow its use in locations vhere diversity reception isnot essential
to aueceasful operation.
If under extensive ume, it is 'Chown that diversity rept Len would
s4botantially increase the effeotivenees of the viten, thee the eqaipment
can at a later date be easily retrofitted. The proposed syst?emerill be constructed
eith this ohject in mind. Pertinent wiring viii be brought out to a oonnector so
that a third drawer, containing a second receiver front end together with
diversity coning circuits nay be in the future easily added if. desired..
In this case, the added area require& for the extra entenas. gee possibly be
minimised by employing a horiseetal tong-wire together with a vertical whip
to provide alarization diversity.
A simple test eimeletor will be designed, Packaged and looated in
the receiver ease. This devise will function to generate a group of pulses
representing alI marks for reeogmition, an RY pattern, or a standard mensage
pattern convenient for testing* This will be accomplished by a ottup of
standard modUles and a tuning fork csosilleber. The tuning foe& will eat as
the stable freepency aaurce. The pulse output of this logic viii be eonvorted
to r-f in 2 ko steps at some frequency within the pass band of the receiver.
This technique Ls sisdlar to that employed so succeesfelly in the AS-4 pulse and
r-f simulators. To certify that the egelpeent is performing eorreetly, the
operator switches the r-f front-end tarret to the 'text" channel, and after
suitable ears up time depresses the T1ST button. This elation cameos an
elettronisally generated test signal to be transmitted to the reaeiver front
end end thence Vara the entire system vbere it finally appears as recorded
pulses from the output device. A, brief study of the simulated message will
reveal the status of the equipment.
Spares are included in this proposal on the basis of one maul,
for ;Noah different type of active module used. It the number of identical
modules is large, then two spares Will be included. Other miseellaneoua
components eill also-be included as spares, 52 experience indicates the need.
Minimum drawing*, inoluding sehematics, are a part of this pro-
posal. In this case, minimum refers to those drawings necessary for use by
model shop and skilled feetory personnel to fabrioate and partially test all
units following the first. Final testing will be accomplished by eganiering.
Its. 24 the unit cost for febriention of additional RR-16 Receiver
units, is quoted eeperatoly. In the small gametal.* requested by the cognisant
Government engineer, no appreciable wet differential can be effected for
fabrication of additional units. Therefor*, all PR-16 units fallowing the
Irerrirrmiremisi
Declassified in Part - Sanitized Copy Approved for Release 2012/06/11: CIA-RDP78-03424A000500070021-8
25X1
25X1
? Declassified in Part - Sanitized Copy Approved for Release 2012/06/11: CIA-RDP78-03424A000500070021-8
?
?
i0:17TYrr "R"
Page 3 of 3
the first are identical in coat shown in the Satimated Cost Summary.
An informal instruction manual, listed as Item 3 in the
3tatemant of Work, is also a part of this pronosal. This document will
cover theory, operation and maintenance of the equipment, primarily fc_r
use by operation and maintenance personnel. All progress will be reported.
in the usual Monthly Progress Letter, and no quarterly reports will be sub-
mitted.
An 7/-16A or :ti-1611 ?lead 'Jun will be required by Contractor
on this program, as G7.10, to be used during the development and testing phases
of the work.
Pigure T. is a simplified block diagram of the Pied finit Receive
9ystem shoving the technical approach which will be ttken.
rignrc T1 is a photograph of the standard shipping case in which
each of the two components will be transported. The receiver and recorier
components will operate within this cane, or they moy be removed ane. mounted_
on a standard :slay rack for more permanent installations.
.F?=
Declassified in Part - Sanitized Copy Approved for Release 2012/06/11: CIA-RDP78-03424A000500070021-8
25X1
25X1
25X1
25X1
Declassified in Part - Sanitized Copy Approved for Release 2012/06/11: CIA-RDP78-03424A000500070021-8
R
Next 1 Page(s) In Document Denied
Declassified in Part - Sanitized Copy Approved for Release 2012/06/11: CIA-RDP78-03424A000500070021-8
25X1
Declassified in Part - Sanitized Copy Approved for Release 2012/06/11: CIA-RDP78-03424A000500070021-8
?
?
UNTIAI
rr t7)
1
telo
n3L7PIRY STRIOUT43
Mem 1.x wnthe after receipt r.,11 signed contract.
Item 2. one each set per month, ening seven months after rIceipt
of signed contract.
Ttem 3. Right mlathe after receipt of signed contract.
This schedule is predicated on a forty-four (4,4) hour vork veek.
As indicated in the estimated enst breakdown, Contractor anticipates
640 overtime hours for completion of Item 1 and 3 and 232 overtime
hours for each additional n14-16 set. It is requested that any
con*not resulting frnm this proposal include authorization fe:r
comeAnsurate ovq.rtime.
Cyatia