TRIP REPORT - (SANITIZED) RD-76, TASK ORDER I

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-03424A000500100028-7
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
1
Document Creation Date: 
December 22, 2016
Document Release Date: 
August 2, 2012
Sequence Number: 
28
Case Number: 
Publication Date: 
July 29, 1960
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP78-03424A000500100028-7.pdf71.82 KB
Body: 
Ama. As\ in 11.. ? v.. CP Pt 11 'IP I A I Declassified in Part - Sanitized Copy Approved for Release 2012/08/02 : CIA-RDP78-03424A000500100028-7 . STANQARD FORM NO. 04 %.0 Office Memorandum ? UNITED STATES GOVERNMENT TO FROM : The Files sukgrgT: Trip Report RD-76, Task Order-1 , ">) On 20 July a visit was made to the to monitor progress an the subject task. Those present were: DATE: 29 July 1960 25X1 25X1 25X1 25X1 25X1 2. The subject task provides for the fabrication of fifteen 1N-7 time event markers (TEM) and the development of one ruggedized IN-7 prototype (TEM-A). Initial development of the IN-7 was accomplished under RD-76, T.O. C. The TEM and the TM-A are miniature time code generators controlled by the vetch move- ment. In the TEM the watch is driven by a manual wind spring which when fully wound will provide operation for a 60-day period; in the TEM-A the watch is driven by an electrically operated solenoid which pulses the vatehvinding mechanism once per minute. In this manner operation of the unit will continue for a period determined by the life of the external. battery source. When TEN or TEM-A is aectrically interrogated, a series of pulses is ;resented at the out- put terminal. This is a, binary coded time group representing the number of elapsed minutes from the time of activation. The TM and. TM-Al/in be used with ELINT systems to denote the time that sample signals are recorded. 3. The ruggedized time event marker failed during acceptance tests and had to be returned to the contractor for further volt. During this visit the con- tractor tried to determine the cause for failure in this unit. Preliminary indications are that either the watch module or the watch solenoid winding mechanism failed. The contractor was requested to determine the cause for fail- ure and recommend what corrective action should be taken. Rinds have been com- pletely expended on this task and the contractor was instructed by the writer that once it has been determined what has to be done a proposal should be sub- mitted for a time extension and additional funding to complete this task. In addition to the re-work, the contractor was requestel to provide facilities for Agency evaluation of the unit. OC.ZPS/FAvill provide amen to monitor this evaluation. Distribution: Subject File RH) Laboratory OC-SP Monthly (4) EP Chrono Declassified in Part - Sanitized Copy Approved for Release CONFIDEN DOC CO REV DATE 8 1:478 0 BY .p? ORIG COMP o 33 OPI -5-6 TYPE 0 CLASS )1_ PAGES REV CLASS e-- JUST "2"- NEXT REV