CONTRACT RD-110 TASK ORDER 6
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-03424A000800020008-5
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
5
Document Creation Date:
December 22, 2016
Document Release Date:
February 16, 2012
Sequence Number:
8
Case Number:
Publication Date:
May 29, 1957
Content Type:
MISC
File:
Attachment | Size |
---|---|
![]() | 249.44 KB |
Body:
Declassified in Part - Sanitized Copy Approved for Release 2012/02/16: CIA-RDP78-03424AO00800020008-5
- SECRET
Director of Logistics
Director of Comunications
Contract RD-310 Task Order 6
14
rar
G!~ !RV NAT!
?Ri6 coup !!N , typo
Nina 0"35 PANS air GI X1 - .
NUT NQU O! d "Till jilt 114
1. The Office of Cowwaications has a requirement for a
CcMotnnieatioas System,, the 25-19. Specifications for
this equipment have been prepared and distributed to a number
of suitable electronic manufacturers .
2. Three proposals have been received and carefully
evaluated. It is the considered opinion of this Office that the
has offered the beast proposal and has the
task will be
Requisition No. MMB-57-382 in the amount of 49T,401--.61- Indicating
the availability of funds under Allotment No. 7-7995-50 is
attached for this purpose. The association of this Agency and
the completed equipment will be classified SECRET, but co onente
and sutb-assemblies an designated by our project engineer may be
treated as t RCiASSWI J. The equipment will be declassified upon
receipt in the Agency warehouse. The Project Engineer for this
anee with their proposal and our Specification No.
necessary facIllties and personnel for this project. Their
proposal and price analysis are attached.
3. It is requested that Task Order 6 be negotiated under
Contract RD-110 with this company to perform this work in accord-
Attachments:
1) Contractor's Proposal and Price Analysis
2) Requiai lon No. CBS-57-382
E/ID-E 7TGW:cmf (29 May 1957) COORDINATION
/R&D Subject File R&D Obligation File
Reading MSB (2)
OC-A OC-E Chrono
--
bG-A O - L
R&D Chrono
EP Chrono
ONDTOO-)
f SEET
Declassified in Part - Sanitized Copy Approved for Release 2012/02/16: CIA-RDP78-03424AO00800020008-5
Declassified in Part - Sanitized Copy Approved for Release 2012/02/16: CIA-RDP78-03424A000800020008-5
Doc uAT~; 9V
?RE11 COMP P1 TVFC
X1114 C3dt~5 ~_ P-t ~10 CUM
13 May 1957
Subjects Contract RB-1W RS.19 Develo nt
We are pleased to submit herewith our proposal covering the design and
development of the R8w19 a n.cation system under a task
order to be issued in accordance t the terms of the basic agreement.
Following is our proposed delivery schedule for all contractual itemst
Phase A
Item Item Deec rip' .om-
1 1 Experimental model of the RS-19. An 3 months after
experimental model is a working equip- authorization
ment which demonstrates the feasibility
of the basic design concepts. It differs
from a service test model in thhat the
circuitry is not necessarily optimum and
it is not packaged in the final config-
uration.
2 10 Copies of the final report on Phase.A. months
This report should contain a design and after authori-
test specification for the fabrication of sation.
service test models to be produced under
phase B. This specification should
include sire, weight, method of mounting,
range, etc. if the specification fails
to most any of the equipment requirements
in the task outlines the report should
discuss why it has not been possible to
most these requirements. The final report
should also contain an evaluation of the
experimental model.
Declassified in Part - Sanitized Copy Approved for Release 2012/02/16: CIA-RDP78-03424A000800020008-5
Declassified in Part - Sanitized Copy Approved for Release 2012/02/16: CIA-RDP78-03424A000800020008-5
Phase 8
It
(Zu(ZuM antit r item D crtr ti n
Gop9,ee of a bi-nuanth3ar forward a after end
contractor will prepare and
complete and comprehensive engineering reporting
progress report to the contracting
agency every two months. The report
shall describe the changes in the
circuitry made during the period and
the reasons for those changes: The
report should also describe the
general progress made, test performed;
and test results. Schematic diagrams
sketches and photographs should be
included as required for clarity of
description.
Quanta item Doscripti-on
1 1
2 9
3 15
Service test models of the RS-19
constructed according to the
approved specifications which
were written In Phase A. One ser-
vice test model to consist of one
transmitter and one receiver with
appropriate accessories.
Service test models of the RS-19
constructed according to the
approved specifications and
incorporating modifications
recommended in Item 1.
Copies of the Operating Instructions
and Maintenance manuals. This manual
should contain schematic diagrams,
component placement diagrams? and
maintenance instructions. The manual
should also contain complete operating
instructions including diagrams for the
placement of the equipment.
Reproducible Master of the Operating
Instruction and Maintenance Manual.
9 months after
approval of
specifications
submitted as
Item 2 under
Phase A.
3 months after
approval of
item 1, Phase A.
Concurrent
with Item 2.
Concurrent
with item 2.
C Declassified in Part - Sanitized Copy Approved for Release 2012/02/16: CIA-RDP78-03424A000800020008-5
Declassified in Part - Sanitized Copy Approved for Release 2012/02/16: CIA-RDP78-03424A000800020008-5
Its Q ant Item Deeoription
1 Set of reproducible drawings or Imo th after
sketches suitable for preparing
engineering and manufacturing
drawings for the RS-19.
6 5 Copies of a bi-monthly progress By 15th day after
report similar to those required end reporting
by Item 3, Phase A.
7 10 Sets of operating spares. Operating Concurrent
with Item 2,
spares are those itesxe$, except
batteries., which can be expected to
be consumed or fail within an
operating life of 200 hours.
1 Copies of a final engincering report 1 month after
on Phase B. The final engineering submission of
report should be prepared after Item 2.
government approval of the first
service test model. This report should
reflect any change in the prototype
requested by the government and should
suarite the results of the final
teasts.
Attached WD Forme 105A furnish an analyses of the total proposed selling
price of 97,, ,41,61 as well as separate prices for Phases A and B.
Further analyses is provided in separate Labor and Overhead Breakdown
for each phase,
It you desire any further information in response to this proposal,,
please communicate with the undersigned*
very truly youres,
JK/fe+
Declassified in Part - Sanitized Copy Approved for Release 2012/02/16: CIA-RDP78-03424A000800020008-5
Declassified in Part - Sanitized Copy Approved for Release 2012/02/16: CIA-RDP78-03424A000800020008-5
Iq
Next 4 Page(s) In Document Denied
Declassified in Part - Sanitized Copy Approved for Release 2012/02/16: CIA-RDP78-03424A000800020008-5