CONTRACT RD-110 TASK ORDER 6

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-03424A000800020008-5
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
5
Document Creation Date: 
December 22, 2016
Document Release Date: 
February 16, 2012
Sequence Number: 
8
Case Number: 
Publication Date: 
May 29, 1957
Content Type: 
MISC
File: 
AttachmentSize
PDF icon CIA-RDP78-03424A000800020008-5.pdf249.44 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2012/02/16: CIA-RDP78-03424AO00800020008-5 - SECRET Director of Logistics Director of Comunications Contract RD-310 Task Order 6 14 rar G!~ !RV NAT! ?Ri6 coup !!N , typo Nina 0"35 PANS air GI X1 - . NUT NQU O! d "Till jilt 114 1. The Office of Cowwaications has a requirement for a CcMotnnieatioas System,, the 25-19. Specifications for this equipment have been prepared and distributed to a number of suitable electronic manufacturers . 2. Three proposals have been received and carefully evaluated. It is the considered opinion of this Office that the has offered the beast proposal and has the task will be Requisition No. MMB-57-382 in the amount of 49T,401--.61- Indicating the availability of funds under Allotment No. 7-7995-50 is attached for this purpose. The association of this Agency and the completed equipment will be classified SECRET, but co onente and sutb-assemblies an designated by our project engineer may be treated as t RCiASSWI J. The equipment will be declassified upon receipt in the Agency warehouse. The Project Engineer for this anee with their proposal and our Specification No. necessary facIllties and personnel for this project. Their proposal and price analysis are attached. 3. It is requested that Task Order 6 be negotiated under Contract RD-110 with this company to perform this work in accord- Attachments: 1) Contractor's Proposal and Price Analysis 2) Requiai lon No. CBS-57-382 E/ID-E 7TGW:cmf (29 May 1957) COORDINATION /R&D Subject File R&D Obligation File Reading MSB (2) OC-A OC-E Chrono -- bG-A O - L R&D Chrono EP Chrono ONDTOO-) f SEET Declassified in Part - Sanitized Copy Approved for Release 2012/02/16: CIA-RDP78-03424AO00800020008-5 Declassified in Part - Sanitized Copy Approved for Release 2012/02/16: CIA-RDP78-03424A000800020008-5 Doc uAT~; 9V ?RE11 COMP P1 TVFC X1114 C3dt~5 ~_ P-t ~10 CUM 13 May 1957 Subjects Contract RB-1W RS.19 Develo nt We are pleased to submit herewith our proposal covering the design and development of the R8w19 a n.cation system under a task order to be issued in accordance t the terms of the basic agreement. Following is our proposed delivery schedule for all contractual itemst Phase A Item Item Deec rip' .om- 1 1 Experimental model of the RS-19. An 3 months after experimental model is a working equip- authorization ment which demonstrates the feasibility of the basic design concepts. It differs from a service test model in thhat the circuitry is not necessarily optimum and it is not packaged in the final config- uration. 2 10 Copies of the final report on Phase.A. months This report should contain a design and after authori- test specification for the fabrication of sation. service test models to be produced under phase B. This specification should include sire, weight, method of mounting, range, etc. if the specification fails to most any of the equipment requirements in the task outlines the report should discuss why it has not been possible to most these requirements. The final report should also contain an evaluation of the experimental model. Declassified in Part - Sanitized Copy Approved for Release 2012/02/16: CIA-RDP78-03424A000800020008-5 Declassified in Part - Sanitized Copy Approved for Release 2012/02/16: CIA-RDP78-03424A000800020008-5 Phase 8 It (Zu(ZuM antit r item D crtr ti n Gop9,ee of a bi-nuanth3ar forward a after end contractor will prepare and complete and comprehensive engineering reporting progress report to the contracting agency every two months. The report shall describe the changes in the circuitry made during the period and the reasons for those changes: The report should also describe the general progress made, test performed; and test results. Schematic diagrams sketches and photographs should be included as required for clarity of description. Quanta item Doscripti-on 1 1 2 9 3 15 Service test models of the RS-19 constructed according to the approved specifications which were written In Phase A. One ser- vice test model to consist of one transmitter and one receiver with appropriate accessories. Service test models of the RS-19 constructed according to the approved specifications and incorporating modifications recommended in Item 1. Copies of the Operating Instructions and Maintenance manuals. This manual should contain schematic diagrams, component placement diagrams? and maintenance instructions. The manual should also contain complete operating instructions including diagrams for the placement of the equipment. Reproducible Master of the Operating Instruction and Maintenance Manual. 9 months after approval of specifications submitted as Item 2 under Phase A. 3 months after approval of item 1, Phase A. Concurrent with Item 2. Concurrent with item 2. C Declassified in Part - Sanitized Copy Approved for Release 2012/02/16: CIA-RDP78-03424A000800020008-5 Declassified in Part - Sanitized Copy Approved for Release 2012/02/16: CIA-RDP78-03424A000800020008-5 Its Q ant Item Deeoription 1 Set of reproducible drawings or Imo th after sketches suitable for preparing engineering and manufacturing drawings for the RS-19. 6 5 Copies of a bi-monthly progress By 15th day after report similar to those required end reporting by Item 3, Phase A. 7 10 Sets of operating spares. Operating Concurrent with Item 2, spares are those itesxe$, except batteries., which can be expected to be consumed or fail within an operating life of 200 hours. 1 Copies of a final engincering report 1 month after on Phase B. The final engineering submission of report should be prepared after Item 2. government approval of the first service test model. This report should reflect any change in the prototype requested by the government and should suarite the results of the final teasts. Attached WD Forme 105A furnish an analyses of the total proposed selling price of 97,, ,41,61 as well as separate prices for Phases A and B. Further analyses is provided in separate Labor and Overhead Breakdown for each phase, It you desire any further information in response to this proposal,, please communicate with the undersigned* very truly youres, JK/fe+ Declassified in Part - Sanitized Copy Approved for Release 2012/02/16: CIA-RDP78-03424A000800020008-5 Declassified in Part - Sanitized Copy Approved for Release 2012/02/16: CIA-RDP78-03424A000800020008-5 Iq Next 4 Page(s) In Document Denied Declassified in Part - Sanitized Copy Approved for Release 2012/02/16: CIA-RDP78-03424A000800020008-5