TRIP REPORT - (SANITIZED)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-03424A001100030049-5
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
September 19, 2011
Sequence Number: 
49
Case Number: 
Publication Date: 
March 6, 1958
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP78-03424A001100030049-5.pdf128.44 KB
Body: 
Sanitized Copy Approved for Release 2011/09/19: CIA-RDP78-03424AO01100030049-5 ST( DARO. ORM NO. 64 "e ? NOT :LEASABLE TO FOHIGN NATIONALS f Offic M 6 ^- --- - G e em anc MIR, ? UNITE suBJECT: Trip-Report H CONADEN A DATE: 6 March 1958 1, was 14 and February 1958 to discuss the status of Contract Task Orders 1 through 7. Persons contacted on this visit included: - - - i an ear ly completed. The final report which will serve as an instruction manual is being prepared for binding. Final drawings have not been completed, however, because of.the success with the Visicorder read-out in the January 1958 0 test, three Visieorders, modified for fast start, have been ordered through the eontractoro One Visicorder is beine-rush*d. for modification for use as orderlink in connection with the eats which will be conducted at I The Visi co be between The twwod7 coders used e anuary tests were returned to the contractor for repair. The contractor was advised the Agency is in the market for ten service models field seta and that they will be considered in the bidding for production of these sets. Task Order 2, - This project has been completed by the contractor and final acceptance is pending. The con- tractor has been asked to submit a proposal for the t~answi.t portion of the to work with the transmitter which has a orty-five kilowatt ou p o This will include the F__1 excitor also. Task Order 3 J I- The fabrication of the system aiF been completed* The contractor will test the system locally for 2 or 3 weeks and then arrange to ship the NOT RELEASABLE TO FOREIGN NATI8NAES 25X11 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 2bAl 25X1 25X1 25X1 9 Y1 25X1 25X1 Sanitized Copy Approved for Release 2011/09/19: CIA-RDP78-03424AO01100030049-5 Sanitized Copy Approved for Release 2011/09/19: CIA-RDP78-03424AO01100030049-5 Phu ElEASA LE SJ E ;t i ~j l ill3i~ALS CO RRDEN1]AL Receive RF and the Receive Data terminals to Washington, D.C.) for the next testing phase. It is expected that the testing between Washington, D.C., and will cover a 25X1 period of 1 mouth from a roximately 1 May through 31 May 1958. will furnish the necessary 25X1 engineering service to put the receive equipment into 25X1 operation at Washington. Taste Order 41 - A trip was made to on 17 February 1958 to make arrangement for. thetests, which were conducted from o February. The tests, primarily for debugging the system, were successful. A total of 15,550 bits were received at the base station with a total error rate of 1.02% taking all errors into jpccount. The transmit error rate was 0.38%. After a se parity check, this error rate was 0.32%; and after .double parity check, this error rate was 0.16% showing the usefulness of the error correction at the base station. Tentative signal plans were arranged for t ats at Washington, D.C., and These tests will require the use o a brevity code for use on an orderlink from the field station to the base It will be possible to contact the base with AN or CW signals using the exciter unit and the 500 watt transmitter. Task 0 r .i I is pur- chasing one input - output Soroban units, a combination high-speed reader using photo-diodes and high-speed out- put punch. Proposals are being prepared by the contractor to incorporate error correction in circuits in the equipments and also the capability of receiving the field set. The contractor has been advised of the require- ment for ten. transmit and ten receive frequencies for the system. Tadk Order 6. -- Test Power Supplies - One test power supply unit has been completed and is ready for shipment; two more remain to be completed. This equipment is unique in the use of colored meters and colored push-buttons which light up when pushed. Task Order 7. Service Contract - Additional funds are re- quired to bolster Task 7 to cover the purchase of three Visicorders. CONSF DEN' I 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 NOT RELEASABLE Tfl ;Grd NA1 AL Sanitized Copy Approved for Release 2011/09/19: CIA-RDP78-03424AO01100030049-5