QRF PROGRAMS FOR FY 58

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-03424A001300050008-6
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 23, 2016
Document Release Date: 
August 15, 2013
Sequence Number: 
8
Case Number: 
Publication Date: 
September 19, 1957
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP78-03424A001300050008-6.pdf146.5 KB
Body: 
rnmrinrwrim Declassified in Part - Sanitized Copy Approved for Release 2013/08/15: CIA-RDP78-03424A001300050008-6 -C777-2 ; Office Memorandum ? UNITED STATES GOVERNMENT TO FROM : SUBJECT: Chief, Engineering Division, OC Chief, Supplemental Programs Diviption, OC SPM `(-614 DATE: 19 September 1957 QBF Programs for FY 58 pea qItV g MAY OtTF "Pr) By a onin ev:p CIU cuEs 411ST DPI _6,1 TYPE pAzzs aLV CLASS ttEXT aEV -7.0/ 0 AUTII: 10-2 1. A review has been made of relative to a ick Reaction Facility (QRF) for FY 58. Experience with the Contract during FY 57 and comments from the liaison 50X1 officer indicate that is neither geared to handle nor very 50X1 ? ? ? interested in such a program, nor are we too pleased with the way the contract has worked. As originally planned, was to set 50X1 aside a certain number of men to be ready to work on our crash re- quirements. This has proven to be unworkable, due primarily to lack of a sufficient volume of work, which not only wasted 50X1' power, but reflected in excessive unit costs. 2. This does not imply that OF's are not urgently needed, but rather a reorientation of our thinking is required in regard to magnitude. I hesitate to use the term "service contract," as I understand this type of contract may place a $2,000 ceiling on any one job. 3. has excellent facilities for the design, fabrica- 50X1 tion, and measurement of highly specialized "one shot" equipment. Additionally, they are geographically close and have shown a will- ingness to operate on a day-to-day informal basis, which is very important on "crash fabrication." 4. It is requested that your Division review the projects proposed for the current FY and determine which facilities are available in addition to 50X1 )) which would best provide the capability and reaction 50X1 e requirements. In addition to those facilities which are known to have the manufacturing ability, it would be highly de- sirable to have a few facilities such as CGS, which could pro- vide some ingenuity and inventive self-expression toward the solution of unique Problems. 5. Whether such facilities or services are called QR or Service Contracts, I can only leave up to your interpretation; however, it is not possible to operate under a $2,000 ceiling per job. CONFIDENTIAL ..e.t 6.1 Declassified in Part - Sanitized Copy Approved for Release 2013/08/15: CIA-RDP78-03424A001300050008-6 Declassified in Part - Sanitized Copy Approved for Release 2013/08/15 : CIA-RDP78-03424A001300050008-6 *owto RUE"- coilp 0111 6. Outlined below are required for FY 58. a. Antenna, minimum 3 db gain. 2 of SPM 7-614 the tasks which have been established as b. Antennas, furnished antennas, max size 18 x 18 x 12, Preliminary study done by measurements on government gain and pattern. Estimated 10 antennas to be considered during FY 58. c. Antenna, modified discone, 50-250 mc., government furnished, to be dismembered, provided with splice plates for re-assembly and measured. d. Fitting of wave guide and feeds to parabolic dishes 10-28 ft. diameter. Government furnished equipment. e. Fabrication, Xtal Video Demand System, VA-6, AV-6, BT-6, as developed by R/D Lab. 5 systems. N \ jaCks\p: c tineo itiui a el ''k 4 .. ? ?\. g. Fabrication and packaging, 1000 cps reference ocs. utilizing Elgin resonator and associated circuitry and bat- teries. 50X1 50X1 50X1 50X1 h. Vehicle modification, truck and/or trailer; to include mounting of racks, benches, ducts, etc.; antenna mounts and/or antenna mast exits. i. Signal actuate device, interim replacement for signal actuate device in VA-6 system. To provide 1, 2.5 and 5 minute recording time. To be electronic rather that mo d as present system. This problem was broached to during FY 57 but task was not assigned. j. Design and fabrication of VHF, UHF pouchable high gain antennas. already informally contacted by for pouchable parabolic dishes.) k. Design and/or fabrication of specialized single fre- quency VHF/UHF receivers or converters. 50X1 50X1 50X1 Declassified in Part - Sanitized Copy Approved for Release 2013/08/15: CIA-RDP78-03424A001300050008-6 Declassified in Part - Sanitized Copy Approved for Release 2013/08/15: CIA-RDP78-03424A001300050008-6 .. -..... i L.or : Page 3 of SPM 7-614 7. Funds in the amount of $175,000 have been budgeted for during FY 1958. Pending approval of the FY 58 budget, these funds will be available under the 07 Category under Allotment 8-7912-50-600 for $150,000 and $25,000 under Allotment 8-791240-652 for the QRF Pro- gram. You are requested, after establishing the allotment of the tasks outlined, to inform this office of your choice of facilities versus task. Further specifications on the tasks set forth in para 7 may be obtained from this Division. Distribution: Orig. & 1 - Addressee 50X1 1. Declassified in Part - Sanitized Copy Approved for Release 2013/08/15: CIA-RDP78-03424A001300050008-6