TRIP REPORT, CONTRACT (SANITIZED), T.O. VI, WITH (SANITIZED)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-03424A001300090019-0
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 23, 2016
Document Release Date: 
January 15, 2014
Sequence Number: 
19
Case Number: 
Publication Date: 
September 12, 1955
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP78-03424A001300090019-0.pdf129.65 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP78-03424A001300090019-0 The Files ea& t"trET-11 12 September 1955 MAY Ofn /6.- REV PATE 11-19$0 ey 3 on COWT 0.5.5 OPI .1--ap GREG CLASS PGS v is JUST tiqa REV z-ewa AUTH: ER 13.2 Trip Report, Contract ?1.A_Arip_ves_amale on 9 September 1955 by to in conjunction with Task Order la. 2. Ihe visit revealed the following: Satisfactory work is being accomplished as regards equipment measurements; trailer units are being readied to permit field equipments beimg installed, etc. b. has *Amiga that slum the date of placement of orders for marIng.filaatt cameras the Stilted Stritie Air Fore* has planal_priarity procure. sent orders which will prevent main camera deliveries without Department of Defame priority allocations. Lggstracting officer is being requested to provide nscxpriority authority to for the procuremeet of two each CD2 mowing film cemerejtj. e. advised that contracting officer hes act as yet provided the necessary shipping data to permit the return of the Collins 51.1() re. *elver 'high vas demaged in shipment to contractor. d. 2be Chief Segineer's offer to authorise three each RIO oscillator units being assigned to this project cannot be accepted by reason that the POID outset is immutficient to drive the 'Tabasco SW amplifier under cos practise. 50X1 50X1 50X1 50X1 50X1 50X1 50X11 50X1 50X1 50X1 50X1 50X1 ? Etter CO c uLti Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP78-03424A001300090019-0 Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP78-03424A001300090019-0 Page 2 3. Data for record purposes: a. a. 12 September 1955 10.44 is the investleption or certain equip- nest arrangements and the neasuremests pert:dam, thereto. The emd result will be certain kamiledSs upon whisk an operatiomal et sq be beseb.or alternately the limitation beyond which the gists. cot be estaillibed for operational assieinemts. In this eonneation,is aware ot the Inherent bandwidth requirememte of the test units currently comeelied. Little factual consideratiom bee been takes towards the reduction of these acute prOblmes. It has been, therefore, necessary for the MOM times to amain? for Tisk Order 1114 to the arrusgsment at the equipments to permit the . establishment of 'slit measurements with latch the Avow ems them proper Into the necessary parameters for an operational acceptable system. t. Future Action: a. )'Or the payee of conduction of the test* hes been advisais (1) (In consideration of prior frequesey data coordinated with AA') to establish terminal to operate at center4requesmy 4000.4063; field site cm to operate at costar frequency (minus 10 ke) best 3155. 3240 kej field site two to operate at rester frequency (plea 10 he) band 3155. 3240 he. b. Ofts tau requested to pewits necessary- backstop with IOC in this regard. Sodas operandi: a. Per test sessurmemst purposes ICSwill treammit: (1) A else save reedy signal. (2) A pulse-train execute signal-4bl* sigmal will be sot more thee 10 pulses induration* pulses vill be isfisee we theater, mat viii have a pulse duration of 154 oacromsecode- 50X1 50X1 50X1 50X1 50X1' Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP78-03424A001300090019-0 Declassified in Part- Sanitized Copy Approved forRelease2014/01/15 : CIA-RDP78-03424A001300090019-0 Itl,UtiN ? P?40 3 12 Septodmor 1955 (3) WS will not transmit these pulse trains (for test/messuroment purposes) at intervals of less tben 3 minutes apart. (4) Field stations will treaspond with single pulse emits. (5) /steam radiation will be higtk omelet halt vane doUblet at About 30.35 foot above wood or 1/10th nave above reflector. (61) Initial operation iri31 be thy reason of frequency and bends/44th comsidereticss) restrictel to Aiytlas operation until initial emesurements bane bees evaluated. 004/SWSP/Linusib (12 September 1955) cc : SID Subject File Illonialy Deport File (2) Dewey 50X1 Declassified in Part - Sanitized Copy Approved for Release 2014/01/15 : CIA-RDP78-03424A001300090019-0