POTENTIAL TASK 6, CONTRACT (SANITIZED)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-03424A001300090023-5
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
12
Document Creation Date:
December 23, 2016
Document Release Date:
January 15, 2014
Sequence Number:
23
Case Number:
Publication Date:
March 1, 1956
Content Type:
MEMO
File:
Attachment | Size |
---|---|
![]() | 730.17 KB |
Body:
? '5 ?
, , ? , . . . ?.
e
. " :404,
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP78-03424A001300090023-5
'.3
,50)(1",i
'S
cnvi;
50X10
'
L Declassified in Part - Sanitized. Copy Approved for Release 2014/01/15: CIA-RDP78-03424A001300090023-5
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15 : CIAli1517/013,712rAC)101300090023-5
.A/M./ VI 11 ?
? 50X1
February 1955
3637
50X1
GashinEton
13, D. C.
Attentions
50X1
Dear Sirs
Re* Additional Work" Contract
50X1
Transmitted herewith is
our
proposal for
an additional
task on
contract per oral request
of
Tho scope of 50X1
work has been reviewed during
ream
otn eremite a etween
your repre-
sentatives erd our engineers, and Attachment I to this latter proposal
sets forth. our technical proposal for such work.
Fa are also enclosing our Pries Anal.ysis in Attachment II. The
rates set out by notes (1), (2), (3), and GO we based upon the twelve
month averages according to our financial statements for the calendar
year 19514. The monthly rates are as follows*
1,54
Jain.
Feb.
Mar.
Apr.
zlay
June
July
A.
Sept.
Oct.
Nov.
Dee.
Ave.
Senior
ineerrin
Junior ingineer, Gehl & Admin.
Asst. etc. Overhead F ease i
Our proposal is ciased on the salary ranges enclosed.
,?CONFIDENTIAL
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP78-03424A001300090023-5
50X1
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP78-03424A001300090023-5
V.
rebraarj 214 1955
3637
would like to s' est that reimbursement for travel expenses be
on the basis of actual cost for transportation, or k,3.07 per mile when
travel is by privately ovncd conveyance, and 417.30 per diem for sub-
siAsnce. Such is the arrangement on our most recent coatract with you;
namely
M.th Task V of contract rapidly nParing covlation, it appears
that time is very important. 4e would be pleased to be called upon to
ansiat you in any way in your appraisal of tri s proposal.
JTX/vtd
tnelag
1) Att I, Tech Prop, 3 pg, (Uupl)
PI Mt II, Price Analysis, I pc ,
3) Job Class and Salary Ranges dd W24/55 (dO.)
Vary truly yours,
hT!!
, ?..,
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP78-03424A001300090023-5
Declassified in Part- Sanitized Copy Approved forRelease2014/01/15 : CIA-RDP78-03424A001300090023-5
Attachment
February 74, 1955
proposes to develop, design and evaluate
to
a sy
m or ra( o
ocatioa following
in general the system as proposed in the
attachment hereto.
The proposed plan of attack is discussed below:
PROLLFN
......./MeamageaSela
To evatuate a eropoacd %stem for radie locatiee. teiu eask will Oe
concluded with the eutimitelen of a Unol report, ttine forth the finings
of the Contractor. The principle of this eystee is the determieatioe of the
bearine of a radio etatioe hy the eireeltaaeous reception of !signals from
this etatica re three contrelled sitee. Bearieee will be oeternined Le the
simultaneous rIcerAtee or a eienal at the three sites, and by meaeurine the
time difference of reeeptien of tJto ewes signal element at the three positions.
SPLTAL COOWLYIS
Phase 1
1. in conjunction with the properly designated Technical
Representative of the Contracting Agency, proposes to plan, lay out and design
an initial eyetee ia detail, inoludine the prcparation of a complete bill of
materials. Such equipments as may require oneness or modifications, will ee
netted. Such enuivnte avflay hp,re to be developed, designed and conetructed
will be listed. It le clearly understood that the were as outlined under this
paragraph will reeeire an eepreciatle amount of engineering design. "Oe will
submit, not later than the fifth of each month, a pregrese report summarizing
the work done duriee the precedine month.
7. A cost estimate o ill. tht raterials listed on the bill of
materials whicia will be completed uneer paragreph 1. will oe prepared and upon
approval by the eovernment of this list of eqaipment, tha required equipment
will be purchased, modified, or eallt.
Phase P
equipment will be aseembled and tested at our field station
While in the Contractor's plant, all necessary delay measure.
ments will be made on the equipment prior to ite installetion. e Closed circuit"
test of all equipment functioning as a three?station eystem will be performed.
Operating procedures and an overall check of the system are to be obtained from
this specific test.
r
;
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15 : CIA-RDP78-03424A001300090023-5
Declassified in Part-Sanitized Copy Approved for Release 2014/01/15 : CIA-RDP78-03424A001300090023-5
Afts
Attachment I
Phase 13 (C011/ t)
Page 2
February 214 1955
P. will assume responsibility i'or iriat21.1.i.