POTENTIAL TASK 6, CONTRACT (SANITIZED)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-03424A001300090023-5
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
12
Document Creation Date: 
December 23, 2016
Document Release Date: 
January 15, 2014
Sequence Number: 
23
Case Number: 
Publication Date: 
March 1, 1956
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP78-03424A001300090023-5.pdf730.17 KB
Body: 
? '5 ? , , ? , . . . ?. e . " :404, Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP78-03424A001300090023-5 '.3 ,50)(1",i 'S cnvi; 50X10 ' L Declassified in Part - Sanitized. Copy Approved for Release 2014/01/15: CIA-RDP78-03424A001300090023-5 Declassified in Part - Sanitized Copy Approved for Release 2014/01/15 : CIAli1517/013,712rAC)101300090023-5 .A/M./ VI 11 ? ? 50X1 February 1955 3637 50X1 GashinEton 13, D. C. Attentions 50X1 Dear Sirs Re* Additional Work" Contract 50X1 Transmitted herewith is our proposal for an additional task on contract per oral request of Tho scope of 50X1 work has been reviewed during ream otn eremite a etween your repre- sentatives erd our engineers, and Attachment I to this latter proposal sets forth. our technical proposal for such work. Fa are also enclosing our Pries Anal.ysis in Attachment II. The rates set out by notes (1), (2), (3), and GO we based upon the twelve month averages according to our financial statements for the calendar year 19514. The monthly rates are as follows* 1,54 Jain. Feb. Mar. Apr. zlay June July A. Sept. Oct. Nov. Dee. Ave. Senior ineerrin Junior ingineer, Gehl & Admin. Asst. etc. Overhead F ease i Our proposal is ciased on the salary ranges enclosed. ,?CONFIDENTIAL Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP78-03424A001300090023-5 50X1 Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP78-03424A001300090023-5 V. rebraarj 214 1955 3637 would like to s' est that reimbursement for travel expenses be on the basis of actual cost for transportation, or k,3.07 per mile when travel is by privately ovncd conveyance, and 417.30 per diem for sub- siAsnce. Such is the arrangement on our most recent coatract with you; namely M.th Task V of contract rapidly nParing covlation, it appears that time is very important. 4e would be pleased to be called upon to ansiat you in any way in your appraisal of tri s proposal. JTX/vtd tnelag 1) Att I, Tech Prop, 3 pg, (Uupl) PI Mt II, Price Analysis, I pc , 3) Job Class and Salary Ranges dd W24/55 (dO.) Vary truly yours, hT!! , ?.., Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP78-03424A001300090023-5 Declassified in Part- Sanitized Copy Approved forRelease2014/01/15 : CIA-RDP78-03424A001300090023-5 Attachment February 74, 1955 proposes to develop, design and evaluate to a sy m or ra( o ocatioa following in general the system as proposed in the attachment hereto. The proposed plan of attack is discussed below: PROLLFN ......./MeamageaSela To evatuate a eropoacd %stem for radie locatiee. teiu eask will Oe concluded with the eutimitelen of a Unol report, ttine forth the finings of the Contractor. The principle of this eystee is the determieatioe of the bearine of a radio etatioe hy the eireeltaaeous reception of !signals from this etatica re three contrelled sitee. Bearieee will be oeternined Le the simultaneous rIcerAtee or a eienal at the three sites, and by meaeurine the time difference of reeeptien of tJto ewes signal element at the three positions. SPLTAL COOWLYIS Phase 1 1. in conjunction with the properly designated Technical Representative of the Contracting Agency, proposes to plan, lay out and design an initial eyetee ia detail, inoludine the prcparation of a complete bill of materials. Such equipments as may require oneness or modifications, will ee netted. Such enuivnte avflay hp,re to be developed, designed and conetructed will be listed. It le clearly understood that the were as outlined under this paragraph will reeeire an eepreciatle amount of engineering design. "Oe will submit, not later than the fifth of each month, a pregrese report summarizing the work done duriee the precedine month. 7. A cost estimate o ill. tht raterials listed on the bill of materials whicia will be completed uneer paragreph 1. will oe prepared and upon approval by the eovernment of this list of eqaipment, tha required equipment will be purchased, modified, or eallt. Phase P equipment will be aseembled and tested at our field station While in the Contractor's plant, all necessary delay measure. ments will be made on the equipment prior to ite installetion. e Closed circuit" test of all equipment functioning as a three?station eystem will be performed. Operating procedures and an overall check of the system are to be obtained from this specific test. r ; Declassified in Part - Sanitized Copy Approved for Release 2014/01/15 : CIA-RDP78-03424A001300090023-5 Declassified in Part-Sanitized Copy Approved for Release 2014/01/15 : CIA-RDP78-03424A001300090023-5 Afts Attachment I Phase 13 (C011/ t) Page 2 February 214 1955 P. will assume responsibility i'or iriat21.1.i.