CONTRACT RD-85, TASK ORDER 2, ALLEN D.(SANITIZED)(SANITIZED)CORPORATION

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-03424A002400050017-4
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
1
Document Creation Date: 
December 22, 2016
Document Release Date: 
September 20, 2011
Sequence Number: 
17
Case Number: 
Publication Date: 
February 15, 1957
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP78-03424A002400050017-4.pdf88.11 KB
Body: 
Sanitized Copy Approved for Release 2011/09/20: CIA-RDP78-03424AO02400050017-4 'J ~J l1J n l 1I _~ I /c~ lef, 21; fCi ne_E 4&D-EP/OEM:w i (15 February 1957) cc: R&D Subject File/OC-E/Reading/Chrono/tiev-ep,, Chief, Procurement Division, CL Chief, ' iae+eri ng Division, 00 Contract RD459 Task Order 2, Production Corporation a. z ;.oran&= to Fort Davis Station, Washngton, D.C., Signed: ~~ dated 12 December 1956 15 February 1957 b. E!, Drandurn to P. 0. Sox 67989 Fort Davis Station, Washington, D.C., Sited: dated a February 1957 1. The referenced manorandume seek additional funds for the execution of the subject contract. Task Order 2 of the contract requires the development and delivery of ten RP-11 Power Supplies and ten kti- . hand Crank Generators which constitute the 1-13:/.3 Power S Cyetesc.. The contractor Witted individual equip- gent Co stinates and a contract subsequently -rded based on these t i to s.. 2. The contractor seeks an add,itiox em of 4v494,35 to cc iple?ee the 1 Power Supply which constitutes an overrun of approximately 10% and is considered fair and reasonable. The scope of the work has not been increased and consequently the fixed fee Is not affected. With respect to the P-U Band Crank Generator portion of the Task Order, the contractor seeks funds in excess of 100% of his original cost estimate for this work. We recoi end that the Hand Crank Generator portion of the Task Order be terminated and a final report rendered. 3. It is requested that the contractor be authorized an in- crease for the RP-11 Power Supply development as indicated above and that he be foully advised of non-approval of additional funds for a continuation of the :-32 mid Crank Generator development. Funds resulting from the termination of the RHt-11 should be ade- quate to cover increased costs for the HP -3.1 Power Supply do- velou-tent portion of the Task Order* 61 25X1 25X1 25X1 25X1 25X1 25X1 Sanitized Copy Approved for Release 2011/09/20: CIA-RDP78-03424AO02400050017-4