CONTRACT RD-85, TASK ORDER 2, ALLEN D.(SANITIZED)(SANITIZED)CORPORATION
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-03424A002400050017-4
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
1
Document Creation Date:
December 22, 2016
Document Release Date:
September 20, 2011
Sequence Number:
17
Case Number:
Publication Date:
February 15, 1957
Content Type:
MEMO
File:
Attachment | Size |
---|---|
CIA-RDP78-03424A002400050017-4.pdf | 88.11 KB |
Body:
Sanitized Copy Approved for Release 2011/09/20: CIA-RDP78-03424AO02400050017-4 'J
~J l1J n l 1I _~ I /c~ lef, 21;
fCi
ne_E 4&D-EP/OEM:w i (15 February 1957)
cc: R&D Subject File/OC-E/Reading/Chrono/tiev-ep,,
Chief, Procurement Division, CL
Chief, ' iae+eri ng Division, 00
Contract RD459 Task Order 2,
Production Corporation
a. z ;.oran&= to
Fort Davis Station, Washngton, D.C., Signed:
~~ dated 12 December 1956
15 February 1957
b. E!, Drandurn to P. 0. Sox 67989
Fort Davis Station, Washington, D.C., Sited:
dated a February 1957
1. The referenced manorandume seek additional funds for the
execution of the subject contract. Task Order 2 of the contract
requires the development and delivery of ten RP-11 Power Supplies
and ten kti- . hand Crank Generators which constitute the 1-13:/.3
Power S Cyetesc.. The contractor Witted individual equip-
gent Co stinates and a contract subsequently -rded based
on these t i to s..
2. The contractor seeks an add,itiox em of 4v494,35 to
cc iple?ee the 1 Power Supply which constitutes an overrun of
approximately 10% and is considered fair and reasonable. The
scope of the work has not been increased and consequently the
fixed fee Is not affected. With respect to the P-U Band Crank
Generator portion of the Task Order, the contractor seeks funds
in excess of 100% of his original cost estimate for this work.
We recoi end that the Hand Crank Generator portion of the Task
Order be terminated and a final report rendered.
3. It is requested that the contractor be authorized an in-
crease for the RP-11 Power Supply development as indicated above
and that he be foully advised of non-approval of additional funds
for a continuation of the :-32 mid Crank Generator development.
Funds resulting from the termination of the RHt-11 should be ade-
quate to cover increased costs for the HP -3.1 Power Supply do-
velou-tent portion of the Task Order*
61
25X1
25X1
25X1
25X1
25X1
25X1
Sanitized Copy Approved for Release 2011/09/20: CIA-RDP78-03424AO02400050017-4