PROPOSAL - STEAM-DRIVEN ELECTRIC GENERATOR UNIT

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-03424A002400100010-5
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
September 20, 2011
Sequence Number: 
10
Case Number: 
Publication Date: 
May 14, 1948
Content Type: 
LETTER
File: 
AttachmentSize
PDF icon CIA-RDP78-03424A002400100010-5.pdf105.45 KB
Body: 
( "f( \f z r r my ^ i1 i if ~itl II Y Sanitized Copy Approved for Release 2011/09/20: CIA-RDP78-03424A002400100010-5 D1',,A ~ Zls . ji _ May 14, 1948 25X1 25X1 ILLEGIB P R O P O S A L Pursuant to discussions between your engineers and en- gineers of this Company, the following proposal is submitted: Upon execution of a contract in a form similar to the contract under which we are now operating, we will undertake on behalf of the United States Government: One: To conduct research and design engineering leading to the development of a portable steam-driven electric generator unit, including boiler, burner, condenser, etc., to thee following specifications: (a) Continuous output rating of the generator is to be 50 milliamperes at 400 volts, and 3.5 amperes at 6.3 volts. (b) Size of unit is not to exceed 10" x 18" x 26" and weight not to exceed 25 lbs. (c) The apparatus will operate on any liquid, gaseous or solid fuel, of 6,000 BTU or better per pound. (d) The equipment will be silent in operation to a degree conformable with the operating re- quirements laid down. The actual rotating parts will be enclosed in a soundproof housing having high attenuation in the audible range. Two: If engineering studies indicate that a successful engine can be built, to furnish an experimental equipment in accordance with the above specifications. Sanitized Copy Approved for Release 2011/09/20: CIA-RDP78-03424AO02400100010-5 Sanitized Copy Approved for Release 2011/09/20: CIA-RDP78-03424AO02400100010-5 PROPOSAL - Steam-driven electric generator unit. May 14, 1948 Three: To furnish necessary test equipment, and suitable spares for said equipment. Four: To furnish operating and maintenance instructions for said equipment. Five-, To furnish progress reports on the progress from time to time as directed, and a final report at the conclusion of the project. Six: To consult at frequent intervals with your engineers and to modify the program in accordance with their requirements and your instructions. Seven: To conduct all work and to keep all records in accordance with applicable security regulations. For purposes of mechanical fabrication the model shop facilities of the R. A. Hawks Co. are employed on a sub-contract basis at a fixed charge of $3.50 per hour: this figure being subject to change in accordance with prevailing wage rates. This proposal is submitted on a basis of cost plus a fixed fee with the fixed fee being 7% of the total charges. This fixed fee may be applied to the whole contract, or alternatively, may be determined and mutually agreed upon after the engineering work has been completed and the exact costs can be estimated with reasonable accuracy. An allowance for overhead costs not otherwise chargeable directly to the contract is not to exceed 10C% of the total costs of salaries and wages: the actual charge for overhead costs will be substantiated by audited report. Our books will be open to inspection by your representatives at all timeso It is estimated that the program contemplated under this proposal will occupy a time of fifteen months from the start of work and that the cost thereof will not exceed the sum of Ninety-five Thousand Dollars ($95,000.00). We are prepared to start work on the program immed- iately upon authorization from you. Very truly yours, MDMcF:rd w/ltr of transmittal. Airmail M. D. McFarlane Sanitized Copy Approved for Release 2011/09/20: CIA-RDP78-03424AO02400100010-5