GASOLINE MOTOR GENERATOR PROJECT #2028, RD-13
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-03535A000500020021-0
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
1
Document Creation Date:
December 22, 2016
Document Release Date:
August 16, 2012
Sequence Number:
21
Case Number:
Publication Date:
June 11, 1952
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 59.57 KB |
Body:
("
Declassified in Part - Sanitized Copy Approved for Release 2012/08/16: CIA-RDP78-03535A000500020021-0
tW.
<
CRET
security Inforn/pNn
ENGINEERING INSPECTION REPORT
Place
June 11, 1952
52 333
This document is part of an integrated
file. If separated .from the file it must be
Subjected N individual systematic review.
? -
25X1
Date : June 3 to June 7, inclusive
Subject : Gasoline Motor Generator
Project #20281 RD-13
Purpose
Those Present
Observations:
: To Observe Radio Interference Measurement Tests
25X1
The has submitted a completed unit SI-AT
to the for testing. Its dimensions are 25X1
6 1/2 X 7 1/3 X 8 inches and its weight, less fuel is, 11.7 pounds.
After shielding all internal leads and by passing the output terminals
with capacitors, both the radiated and conducted noise was decreased
so as to meet specifications with the exception of conducted interference
at 7 mcs. A reading of 16 micro-volts peak was measured at this frequency.
The Hoffman Corporation intends to decrease this to meet specifications
( 5 micro-volts) before submitting the unit to us for testing and
evaluation.
The unit under tAst did not rim s oothly, the output varying from 70
to 130 volts attributed this to a leaky valve in SI-AT
the pressure line to the gasoline tank, and a leaky carburetor float.
On the second model to be submitted for testing, they have re-soldered
the float and renlaced the faulty valve with a ball check valve. They
assured d that these measures would remedy the 25X1
trouble. We observed this improved model undergoing a dynamometer test
at and it ran smoothly and consistently for thirty minutes. SI-AT
also intends to decrease the size of the venturi opening in the 25X1
carburetor to afford a smoother action of the choke control. At present,
this adjustment is quite sensitive.
Shipment on the unit for test was promised by June 17, 1952.,
WJG/kgs qPiirtflu
cc: t4P7711,fer?-Tce,4inqa% ? I
I _