PROJECT 2510, IN-1, COST COMPARISON OF INVESTMENT CASTING VS. MACHINING FROM WROUGHT STOCK
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-03535A000500040015-5
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
2
Document Creation Date:
December 27, 2016
Document Release Date:
September 13, 2012
Sequence Number:
15
Case Number:
Publication Date:
April 1, 1959
Content Type:
MEMO
File:
Attachment | Size |
---|---|
![]() | 137.2 KB |
Body:
?
Declassified in Part - Sanitized Copy Approved for Release 2012/09/13: CIA-RDP78-03535A000500040015-5
CUM- WIL.Vii " 'T
r
. ?
?
Investment ,Casting, end Machining,
,
,
Pt: f.251o.;2A: Casting - Est. #55757
t.OPUng.
d. 12 ea. 0 4.40/casting
-
*Alining 12 44. 34 hrs. 0 3.50/hr.
#2510-30A Casting - Est. 055756
Tooling
Prod. 12 ea. 0 7.65/casting
:Machining Ilea. 14 hr. @ 3.50/hr,
ixtumENTN0
NO CHANGE IN CLASS.
El 1. A
LASS.
ED TO TS S C
DATE:
Milt- R&D or NOG' REVIEW
MTH: HA 71)-2
ONMAEVIEMAEF4.0611?
Project 2510, is-i, icamparisen of Investment Cttng es,- C1Iin
from ght Stock
The following paraiiiiihs compare the cost of investment
caning the 1144 parts with an eetimate.of the cost Of Machining
these parts from wrought stock in the-laD Laboratory:,
2. Three pieces are required a they are machine proeinad
while only two will be necessary if they ere cast.
3. A rate of $1.50 per, atee-hour is, used to figure machining
coat as this is approximately the average wage rate oE the Mechanical
Laboratory
4. The Casting costs are per quotations received frost the
Arwood Precision Casting Corptiretion. The entire tooling and ceet-tryis
costs ere included in ?these quotations.
5. The following cost table shows: the etite e?Letecost
for both methods of manufactwrez,
Coraolete llacts.492...%1 ought S oc
geterial Coats, Pt ? f25104 2510-30 end 2510-31 1;2ea
'Labor Costs: Pt. #25104 12 ea. 142 hrs. 0 3.50/hr1
. , Pt. #2510-30 12 ,ea. 195 hrs. 0 3.50/hr.
Pt. n5Io-3t 12 ea. 16 hrs. 0.3.50/15:r.
1
rslig-115N1.11\1
$ 60.00
497.00
682.50
56.00
$1295.50
420.00
52.80
119.00
485.00
91.80
b9.00
$1217.60
Declassified in Part-Sanitized Copy Approved for Release 2012/09/13: CIA-RDP78-03535A000500040015-5
Declassified in Part- Sanitized Copy Approved forRelease2012/09/13 : CIA-RDP78-03535A000500040015-5
, UU11110tr c,
useof inveattont settings vould requite an attimeted
48 hoard hiuiug in theVeehanical Laboratory llohile tompiete
toditnivia ftot vroughr etoeklimuld require an estimated 353 hour of
manbiaieg time. Thuei an taimated 500 hours of labor and mobine
rime can be diverted to other Projeatt if inve0tOdut eetting It uted.
Attachments:
Arwood Estimates #55757 and #55756
Lab/DLC/rkb (1 April 1959)
Distribution:
Original and 1 - Addressee
1 - Lab Subj.i/
1 - R&D Chrono
1 - Dev/s
25X1
OG['lfr7iFLITV\ii
Declassified in Part - Sanitized Copy Approved for Release 2012/09/13: CIA-RDP78-03535A000500040015-5