PROGRESS REPORT NUMBER 16

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-03624A001500010013-0
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 23, 2016
Document Release Date: 
August 14, 2013
Sequence Number: 
13
Case Number: 
Publication Date: 
August 20, 1957
Content Type: 
LETTER
File: 
AttachmentSize
PDF icon CIA-RDP78-03624A001500010013-0.pdf113.37 KB
Body: 
...,Z' Declassified in Part - Sanitized Copy Approved for Release 2013/08/14: CIA-RDP78-03624A001500010013-0 11/1 50X1 20 August 1957 Attention: DOCT NO. UM EN __.(-:-) 11-3---'..---------'--". CLASS Via: NO CHANGE IN . CI CLASS. CHANGE-1D 70: TS SM NEXT REVIEW DATE: --2E-r9114--RVIEWER: - AUTH: HR 70-2 50X1 PLEASE ADDRESS ALL REPLIES TO THE COMPANY IN DUPLICATE REFER TO SERIAL NUMBER: Attention: Subject: Progress Report Number 16 Date 1 July to 31 July 1957 Contract Number: RD77 Task Order "A." References: Enclosure A: Financial Data 7719 1. Considerable progress was made on this project during the month of July. The overall design of the dispenser is rapidly nearing the "freeze" stage. The configuration plus the suspension and bracing methods have been concluded. ? There remains one major component that requires some consideration at this time. This is the selection of two possible solutions to the hoisting problem. The selection requires additional layout time and analysis before it can be con- cluded. 2. Preliminary electrical data obtained from 50X1 was not encouraging regarding the amount ofpower 50X1 available for our emergency operational requirements. It is anticipated, however, that provisions will be made to provide adequate power for all phases of the dis- penser operation. We are proceeding on that basis. 3. Detail design and preparation of fabrication drawings are underway on the following components: (1) Feeder Assembly; (2) Power and control boxes, and (3) the paper cells or "clips". More and more of our engineering effort will be directed into this phase of the project during the next sixty (60) days. : - CONEI,--111141g Declassified in Part - Sanitized Copy Approved for Release 2013/08/14: CIA-RDP78-03624A001500010013-0 Declassified in Part - Sanitized Copy Approved for Release 2013/08/14: CIA-RDP78-03624A001500010013-0 CZtrittilftiKtom--0 ? 0011EIDESTIAL e 2 to Serial 7719 4. Visits to. made on 8 July. 1957 by by were 50X1 and on 24 July 1957 50X1 These visits were made for physical 50X1 and dimensional checks of the B-26 aircraft and for a generalized familiarization of this type of aircraft with the engineers involved in the design and subsequent testing for this development. 5. We trust that the foregoing meets with your approval and invite comment thereto. Eric: Financial Da.ta Air Mail Registered Return Receipt Rqstd. Sincerely, 001131-aa Declassified in Part - Sanitized Copy Approved for Release 2013/08/14: CIA-RDP78-03624A001500010013-0 50X1 50X1 Declassified in Part - Sanitized Copy Approved for Release 2013/08/14: CIA-RDP78-03624A001500010013-0 -ENCLOSURE dONFIDENTIAL Progress Report No. 16 Serial No. 7719 FINANCIAL DATA: TOTAL ESTIMATED COST ( TOTAL ALLOWABLE COST AUTHORIZED (EXCLUSIVE OF FEE) $ 141, 128.50 ( TOTAL COSTS EXPENDED OR COMMITTED TO END OF ( 30 June 1957 ) $ 123,447.21 ( TOTAL COSTS EXPENDED OR COMMITTED DURING PRESENT PERIOD ( 31 July 1957 ) 6, 379.50 ( TOTAL COSTS EXPENDED OR COMMITTED TO END OF PRESENT PERIOD) $ 129, 826. 71 ( TOTAL UNCOMMITTED BALANCE OF AUTHORIZED FUNDS AVAILABLE AT END OF PRESENT REPORT CONFIDENTIAL $ 11, 301.79 Declassified in Part - Sanitized Copy Approved for Release 2013/08/14: CIA-RDP78-03624A001500010013-0