NOTICE: In the event of a lapse in funding of the Federal government after 14 March 2025, CIA will be unable to process any public request submissions until the government re-opens.

ENCLOSED IS THE PROPOSAL FOR THE EXTENSION OF FUNDS ON THE PILOT PRODUCTION OF THE FILE DESTROYERS.

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-03642A000600010040-0
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
5
Document Creation Date: 
December 22, 2016
Document Release Date: 
May 4, 2011
Sequence Number: 
40
Case Number: 
Publication Date: 
October 30, 1959
Content Type: 
LETTER
File: 
AttachmentSize
PDF icon CIA-RDP78-03642A000600010040-0.pdf139.8 KB
Body: 
Sanitized Copy Approved for Release 2011/05/04: CIA-RDP78-03642A000600010040-0 CONH EfVTI,gL U 30 October 1959 Dear Joe, Enclosed is the proposal for the extension of funds on the Pilot Production of the File Destroyers.) Also, enclosed is a request for exte sn on in time on RD 45., Tas'kTOrder L. as r9;gt-?-QOA - f / on.--t-he phone with Mia. CON F11 DEN -- ~~" Sanitized Copy Approved for Release 2011/05/04: CIA-RDP78-03642A000600010040-0 Sanitized Copy Approved for Release 2011/05/04: CIA-RDP78-03642A000600010040-0 PROPOSAL FOR EXTENSION OF FUNDS ON THE PILOT PRODUCTION OF THE FILE DESTROYERS 30 October 1959 Sanitized Copy Approved for Release 2011/05/04: CIA-RDP78-03642A000600010040-0 Sanitized Copy Approved for Release 2011/05/04: CIA-RDP78-03642A000600010040-0 During the early phase of the File Destroyer Production, Contract 067-0111-9, Task Order 1, sevewl problems became apparent which required the expenditure of engineering effort In order to resolve them. The primary problem encountered wag the repeated non-compliance of the drum manufacturer with major specifications which required reshipment of a carload of materials and extensive negotiations with the sub-contractor. In addition, and at the request of the Project Officer, a considerable effort was expended in design detail., which: the sub-contractor was reluctant to solve. After this design was com- pleted and a prototype submitted and accepted, the parts were put out for manufacture. During this period., a further change occurred and the Project Officer authorized the cancelling of the above parts and requested the purchase of 255 new unmodified drum covers. In addition to the above effort, the weight of sodium nitrate per unit wasincreased from 170 to 200 lbs., which necessitated the pur- chase of an additional 7500 lbs. of the oxidiser. Further, on testing the first unit prior to loading the full lot, it was noted that the screen wire was not sufficiently strong, nor was it large enough. A total of three testa were performed before a satisfactory screen was found and authorised for incorporation in the kits. The additional funds requested in the attached cost breakdown do not constitute an overrun in the framework of the original con- tract. Rather, they redact the additional purchases and extra en- gineering effort necessary to effect the changes. For these reasons, it is expected that the additional fee be granted as included in the cost estimate. Sanitized Copy Approved for Release 2011/05/04: CIA-RDP78-03642A000600010040-0 L ? Sanitized Copy Approved for Release 2011/05/04: CIA-RDP78-03642A000600010040-0 ADD IT IORAL 1 TIERIAL? 7500 lbs. of Sodium Nitrate (Change of load from 170 to 200 lbs. ) 265 New Lids Sample Screens Cost of Punching Ignition Holes in 155 Lids 255 High Altitude Port Gaskets Various Cancellation Charges 278.25 295.25 10,50 76.00 23.50 14.50 0 655.00 Sanitized Copy Approved for Release 2011/05/04: CIA-RDP78-03642A000600010040-0 Sanitized Copy Approved for Release 2011/05/04: CIA-RDP78-03642A000600010040-0 COST ESTIMATE 128 hra. Engineering & Shop Labor 0 $5.50 (For design & preparation of modified high covers) 16 hrs. Drafting Labor d 03.00 40 hra. Engineering Labor Q X3.50 (For expedition of the necessary changes, including the testing of different screens) 80 hrs. Supervisory Labor G 04650 Sub Total I Overhead 0 114% Sub Total II Materials 44C. 00 4E.00 140.00 3604 996.00 --i's ?. 2,131.00 695.00 Freight (Shipment of additional 6 drums & 125 High Altitude Covers) 59,00 Sub Total III 3 20885.00 G & A C' ,,. 144 0 00 , Sub Total IV 3 5,v029.00 Fee 0 8% 2421.00 Total $9271.00 Sanitized Copy Approved for Release 2011/05/04: CIA-RDP78-03642A000600010040-0