THIS LETTER REPORT SUMMARIZES THE WORK DONE ON TASK ORDER NO. NN DURING THE PERIOD APRIL 21 TO JUNE 15, 1960.
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-03642A000700020016-5
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
13
Document Creation Date:
December 22, 2016
Document Release Date:
July 6, 2011
Sequence Number:
16
Case Number:
Publication Date:
June 20, 1960
Content Type:
LETTER
File:
Attachment | Size |
---|---|
![]() | 542.73 KB |
Body:
Sanitized Copy Approved for Release 2011/07/06: CIA-RDP78-03642A000700020016-5
`1\ (NIF1NUL11
CONFIDENTIAL
June 20, 196(
25X1
7fA
y (9 MA 2; !s / li61
L
This letter report summarizes the work done on Task Order No. NN
during the period April 21 to June 15, 1960.
During this period, final field testing of the vehicle system was
conducted with you present; a side panel, damaged in a minor accident, was
replaced; and the vehicle was released for delivery.
On April 28, during a radio range test, the vehicle was involved in
a minor accident which damaged the left rear quarter panel, lower side panel,
front quarter panel, and door. Although the actual damage was slight, it
was unsightly, and it was decided that the vehicle should be repaired. The
repair of the lower side panel proved to be difficult, because the space
between the outer panel and the interior wall was filled with plastic foam
insulation. To avoid damage to the insulation that might have occurred from
the heat of normal "leading" and welding operations, the damaged panel was
removed and replaced with a new panel, which was installed with an epoxy-resin
structural adhesive. The other vehicle panels were repaired conventionally,
and the left side of the vehicle was repainted.
On June 1, the vehicle system was demonstrated to you at night.
Excellent radio communication at a range of 26 miles was obtained during this
demonstration of the equipment. Tests of the IR nighttime-viewing device
indicated that a human figure could be recognized as far as 70 yards from the
vehicle.
CONFIDENTIAL
Sanitized Copy Approved for Release 2011/07/06: CIA-RDP78-03642A000700020016-5
Sanitized Copy Approved for Release 2011/07/06: CIA-RDP78-03642A000700020016-5
CONFIDENTIAL
June 20, 1960
On June 2, you conducted the final inspection on the vehicle, and
the vehicle was released to you.
The summary report is under preparation. The Scotchcal adhesive film
required for the vehicle has been ordered from the manufacturer and will be
shipped to you as soon as it is received.
The total appropriation on this Task Order was $36,505. As of
June 1, 1960, the unexpended balance was approximately $750.
Sincerely, Id
In Duplicate
CONFIDENTIAL
LKK T
Sanitized Copy Approved for Release 2011/07/06: CIA-RDP78-03642A000700020016-5
Sanitized Copy Approved for Release 2011/07/06: CIA-RDP78-03642A000700020016-5 -IS
April 28, 1960
,41^ Y,, T
rn ~JFit
This letter report summarizes the work done on Task Order No. NN
during the period March 21 to April 21, 1960.
During this research period, all of the minor vehicle-system tasks
such as painting and cleaning have been accomplished. In addition, a defect
in the electrical system has been corrected, a holder for the IR equipment
and a holder for a water container have been installed, and field tests of
the transceiver have been conducted.
After the evaluation and demonstrations of the air-conditioning and
ventilating system were completed, cleaning and painting of the vehicle
proceeded. The inside of the occupied space was painted a light green
(operating-room color), and the roof of the vehicle was repainted to cover
the sheet-metal work done on the IR roof port.
During a demonstration of the air-conditioning and ventilating
system, an electrical-wiring failure occurred. Continuity tests on the
wiring revealed that the defect was in inaccessible wiring within the conduit
behind the sidewall of the vehicle. Because the exact location of the defect
in the wiring could not be determined readily, all of the wiring in that
particular conduit was replaced with external wiring.
A water container was purchased and installed on one sidewall of
the vehicle. A mounting bracket and cover for the IR equipment were designed,
prepared, and installed in the vehicle.
Field tests of the transceiver were conducted. The results
indicated that a range of 12 miles can be easily obtained.
Sanitized Copy Approved for Release 2011/07/06: CIA-RDP78-03642A000700020016-5
Sanitized Copy Approved for Release 2011/07/06: CIA-RDP78-03642A000700020016-5
April 28, 1960
During the next report period, a summary report will be prepared
that will describe the activity on this project.
The total appropriation on this Task Order was $35,505. As of
April 1, 1960, the unexpended balance was approximately $1,900.
Sincerely,
In Duplicate
Sanitized Copy Approved for Release 2011/07/06: CIA-RDP78-03642A000700020016-5
Sanitized Copy Approved for Release 2011/07/06: CIA-RDP78-03642A000700020016-5
bear Si
This lets
ft don* on krNo.
,ems, sU at the 01 VVU010.0"tom tasks
such a - ,nom c10*4ng have
In Vw electricaj ayataa aJ
. In ad tion, a Se c
t`ur the aquiat
ana a holAw r a w*ter' OOAWVAW have boom to tU, a oU toots of
der the
Kati
e We 000plew,
oeW. The inside o:
( t 0010r), as the roo
the nheet-metes 't k do" an the roof 3
Ong r
,t ,
b ,ad the a 4ev 1 of the mole#
of the airn cc itioning and
sting of the vehicle
mated a Ught n
to co1ier
t uitt tests on va
+tsss .b a within the conduit
au s0 the OW-t xa a of the defeat
in the wiring OMOA not be detex d r .y, a1]. tha wiring in that
su -alr cwt was rogw"
external virt**
Ainter r
our
t,g bxak and c
Ma , *rid star ed in t veUcle,
el tam of the ei
lu1csted that a e of 12 M1160, can be
r1r [
(L l,~ n.;11 U Il
Ono stagy of
uit Ve" des,
W., The results
11 1 Sanitized Copy Approved for Release 2011/07/06: CIA-RDP78-03642A000700020016-5
Sanitized Copy Approved for Release 2011/07/06: CIA-RDP78-03642A000700020016-5
AprU 280 1960
Dur1; the next report Pe '&od, (a e y report . to prOP43ad
that : describe the 4MOUvtty 0 thid pr*J*0t.
tc apgropr$.atton on this k Order vas *35, 50 . As off'
App 3t Qi the unexpended 1e vu +li proxin i t+ $,900.
AMmIm
la DUPUC&te
E
11 Sanitized Copy Approved for Release 2011/07/06: CIA-RDP78-03642A000700020016-5
Sanitized Copy Approved for Release 2011/07/06: CIA-RDP78-03642A000700020016-5
25X1
25X1
NIT?
UU~
March 29, 1960
This letter report summarizes the work done on Task Order
No. NN during the period February 10 to March 21, 1960.
During this research period, the night-viewing equipment was
completed and evaluated; the ceiling was insulated; some of the "base
station" components were received; the location of the communications
equipment in the vehicle was determined; and the air-conditioning and
ventilating equipment was tested in the vehicle evaluation chamber.
The balance of the night-viewing equipment and the associated
roof mount were completed, and tests were conducted to evaluate the
performance of the device. It was found that the specifications were
surpassed; the range of the device is at least 25 to 50 feet more than the
specified range of 50 feet.
After the night-viewing-equipment roof mount was installed,
the ceiling panels were put in place, and the insulation of the ceiling
was completed.
The "base station" transmitting equipment was received, and
the vehicle communications equipment was completed by the supplier. This
latter equipment will probably be received within the next few days.
During a visit by your technical representative on February 25,
a decision was reached on the location of the communications equipment
within the vehicle.
Sanitized Copy Approved for Release 2011/07/06: CIA-RDP78-03642A000700020016-5
Sanitized Copy Approved for Release 2011/07/06: CIA-RDP78-03642A000700020016-5
March 29, 1960
During the latter part of this research period, the evaluation
chamber was constructed, and on March 18, an 8-hour test of the vehicle
air-conditioning and ventilating system was conducted. The results of
this test were most gratifying; an interior-air temperature of 76 F was
achieved with an average vehicle-skin temperature of 175 F and a surrounding-
air temperature of 120 F. During the test, air at 97 F and 90 per cent
relative humidity was fed into the vehicle cab from the Climatizer. A
shorter test on March 21 yielded an interior-air condition of 68 F and
55 per cent relative humidity. These test results indicate that the air-
conditioning and ventilating equipment will meet or surpass the original
design specifications. Furthermore, it appears that one man can occupy the
vehicle during 8 hours with only 250 pounds of ice used in the air-
conditioning system. If, as expected, this continues to be the case, then,
under field conditions, there will be no need for ice storage facilities
beyond those available in the ice-making machine.
During the next research period, it is expected that most of
the minor vehicle-system tasks such as painting and cleaning will be
completed and that most of the communications system will be installed in
the vehicle and tested. Also, the "base station" transmitting and receiving
equipment will probably be in operation.
The total appropriation on this Task Order was $31,265. As of
March 1, 1960, the unexpended balance was approximately $5,200.
Sincerely,
In Duplicate
Sanitized Copy Approved for Release 2011/07/06: CIA-RDP78-03642A000700020016-5
Sanitized Copy Approved for Release 2011/07/06: CIA-RDP78-03642A000700020016-5
a .~
ffcSq r~?`" J.~~ ~ ~ ~; a/ ~L t1i',7 ,nl 25X1
February 16, 1960
cat7
t~) 66
This letter report summarizes the work done under Task Order
No. NN during the period January 12 to February 10, 1960.
During this research period, preliminary design of night-viewing
equipment was initiated, storage cabinets were constructed, the ice-water
tank was insulated, the underpanels were undercoated, and additional
electrical work was completed.
Preliminary design work on the night-viewing system was initiated.
Filters designed to pass IR and not visible light were ordered from the
Corning Glass Company, and pure gold scrap was ordered for evaporative
coating of the IR reflecting mirror of the night-vision apparatus.
Modification of the Metascope (Type T-5) was completed; the unit is now
ready for testing when the rest of the apparatus is completed.
The interior cabinet work and enclosures for the batteries and
air-conditioning equipment were completed during this month. The storage
areas have hinged doors and the battery and air-conditioning equipment are
enclosed with sliding panels. In addition, the insulation around/toe ice-
water tank was poured and the underpanels of the vehicle were.covered with
an automotive undercoating.
A battery charger was purchased for "home base" charging of the
batteries. The specifications for this charger call for operation at 50
and 60 cycles, and 120 and 24+0 volts; 6 and 12-volt output; an adjustable
5-hr timer; and stepped charging rates up to 50 amperes.
F_ h
Sanitized Copy Approved for Release 2011/07/06: CIA-RDP78-03642A000700020016-5
Sanitized Copy Approved for Release 2011/07/06: CIA-RDP78-03642A000700020016-5
Ji',fir;!il`.IL
-2- February 16, 1960
As a result of a meeting with you on January 8, 1959, the
following modifications have been made to the electrical system: (1) the
installation of automatic cut-off switches on the front and rear viewing
ports such that operation of the viewing ports will extinguish the interior
light; (2) the addition of indicator lights on the control panel to signal
visually that the blower or pump is operating; and (3) the addition of a
hooded panel-illumination light.
During the next research period, it is expected that a major
portion of the night-viewing system will be completed and evaluated, and the
antenna will be tuned. Completion of this work will allow insulation of the
ceiling to proceed and painting of the interior to begin. In addition, the
evaluation is expected to be near completion.
The total appropriation on this Task Order was $31,265. As of
February 1, 1960, the unexpended balance was approximately $11,000.
Sincerely, A
In Duplicate
Sanitized Copy Approved for Release 2011/07/06: CIA-RDP78-03642A000700020016-5
Sanitized Copy Approved for Release 2011/07/06: CIA-RDP78-03642A000700020016-5
January 13, 1960
This letter report summarizes the work done under Task Order No. NN
during the period from December 4+, 1959, to January 12, 1960.
During this research period, the air-conditioning system and electrical
control components were installed in the vehicle, the luggage rack was modified
for use as an antenna and re-installed on the vehicle, design work on the day-
time observation ports and the vehicle evaluation chamber was completed, and
construction of the observation ports was started.
The cooler, damper, and blower sections of the air-conditioning system
were installed on the side wall of the vehicle above the back shelf and the
batteries. The dehumidifying coil was located on the side wall above the ice-
water tank, and the water pump was installed on the floor of the vehicle next
to the ice-water tank. Cooling lines and drain lines were fabricated from
copper tubing, and all tube connections were made with solder-type fittings.
Each connection was tested at line water pressure of about 60 psi. Insulation
was applied to the cooling coils and cold-water lines to minimize "sweating"
of these components. The ice-water tank was installed, the access hatch was
fabricated, and the tank sides and top were framed and covered with Masonite in
preparation for insulating. The a-c converter, damper motor, blower motor,
pump motor, and control panel were installed and connected to the 12-volt elec-
trical system.
Although the luggage-rack configuration was satisfactory for antenna
use, some modifications were necessary in order to obtain proper operating
characteristics. The metal parts of the rack were protected against corrosion
I
I .l..J JL1 l-.' L
Sanitized Copy Approved for Release 2011/07/06: CIA-RDP78-03642A000700020016-5
Sanitized Copy Approved for Release 2011/07/06: CIA-RDP78-03642A000700020016-5
CONFINNTIAL
January 13, 1960
by a plating of chromium over nickel over copper over the original plain-carbon-
steel tubing. The original wooden slats which formed the bottom of the rack were
replaced with black lucite to prevent any change in the electrical resistance
or capacitance of the antenna due to moisture absorption. The antenna lead into
the vehicle was prepared with bolts placed through the rubber suction cups on the
bottom of the rack and through nylon insulators in the sheet metal of the roof.
The lead-in bolts also serve to attach the rack to the vehicle.
The observation-port design which is now under construction consists
of a sliding door on a cover placed on both windows of the vehicle cargo chamber.
Sliding the door down exposes a narrow slot in the window cover so that
observation, front and back, can be conducted without detection from outside the
vehicle. An interlock switch will be incorporated in this door so that the
lights in the vehicle will be extinguished when the door is slid down.
The evaluation chamber which was designed during this research period
consists of a Climatizer (a device which produces selected air temperature and
humidity conditions), heat lamps, a plastic envelope to enclose the vehicle,
and a thermostatically controlled blower. The Climatizer will be used to simulate
design outside-air conditions so that the dehumidifier will be properly loaded
during the system evaluation. The heat lamps will be placed around the vehicle
to achieve a 150 F outside skin temperature and to heat the air in the envelope
surrounding the vehicle to the design outside-air temperature of 95 F. This
temperature will be regulated by the thermostatically operated blower, which
will mix cool air with envelope air to obtain the design condition.
During the next research period, it is expected that the ceiling
insulation, storage cabinets, and evaluation chamber will be completed and
evaluation tests of the system begun.
i' L
Sanitized Copy Approved for Release 2011/07/06: CIA-RDP78-03642A000700020016-5
Sanitized Copy Approved for Release 2011/07/06: CIA-RDP78-03642A000700020016-5
CONF9DENTIA
L
January 1, 1960, the unexpended balance was approximately $1,500.
January 13, 1960
The original appropriation on this Task Order was $20,10. As of
Sincerely.
In Duplicate
ONFHDENTRA
--IF - Sanitized Copy Approved for Release 2011/07/06: CIA-RDP78-03642A000700020016-5