TASK ORDER NO. 1

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-03642A001200020014-1
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
6
Document Creation Date: 
December 22, 2016
Document Release Date: 
May 10, 2011
Sequence Number: 
14
Case Number: 
Publication Date: 
November 24, 1958
Content Type: 
LETTER
File: 
AttachmentSize
PDF icon CIA-RDP78-03642A001200020014-1.pdf418.3 KB
Body: 
Sanitized Copy Approved for Release 2011/05/10: CIA-RDP78-03642AO01200020014-1 t ILE- 51+523/C-379 N OV 241958 Subject: Task Order No. 1 Enclosed are two copies of Progress Report No. 4 which sunanarizes the action taken on the subject Task order during the period from 20 October 1958 through 20 November 1958. Also enclosed is a copy of the Project Fiscal Report as of 30 October 1958, and a copy of the current Project Schedule. I-OZ-1"7nil v %mi"-r _ n TJH/jf Enclosures: (A) Progress Report No. 4 (2 pg) 2 copies (B) Project Fiscal Report (1 pg) 1 copy (C) Project Schedule (2 pgs) 1 copy Copy to: Contracting Officer (w/1 copy of enclosures) STAT STAT STAT STAT Sanitized Copy Approved for Release 2011/05/10: CIA-RDP78-03642AO01200020014-1 Sanitized Copy Approved for Release 2011/05/10: CIA-RDP78-03642AO01200020014-1 STAT - TAbf Uhuth NU. 1 PAGE NO. 1 of 2 4 PROGRESS R E P O R T NO. 1. It is anticipated that all drawings will be complete by approxi- mately December 1, 1958. The present status of the major components is as follows: a. Forward Door (1) Drawings: All details are complete and have been released for manufacture except the lower door framing members. (2) Procurement: Approximately 25% of the required items have been received. Quotations on castings have been received and a purchase order will be issued within the next few days. Manufacturing: All intermediate frames have been completed and a protective coating applied. Tooling for the door corners is approximately 50% complete. The use of epoxy resin dies has been abandoned in favor or maple until all contours have been verified. (3) b. Aft Door: Same status as the forward door except that the main assembly and installation drawing has been started. c. Coaming (1) Drawings: All details are complete and have been released for manufacture. Manufacturing: One section of coaming has been completed. Fabrication of tooling has been scheduled during a later period since the tooling is not required until late in the program. (2) Tracks: Since this is the last item required for installa- tion on the aircraft, drawings of the tracks and their manufacture appear latest on the schedule; however, drawings should be complete by about December 1. Action Required: The following items were requested by the Government Project Engineer on his visit to INC. on November 13, 1958. 1. Add hand holes or access plates to the inner door skin to facilitate removal or replacement of broken parts of the mechanism. Sanitized Copy Approved for Release 2011/05/10: CIA-RDP78-03642AO01200020014-1 Sanitized Copy Approved for Release 2011/05/10: CIA-RDP78-03642A001200020014-1 C-379 - TASK URDER NU. 1 STAT PAGE NO. 2 of 2 2. is to consider all ideas which might beSTAT patentable. 3. is to check immediately to determine STAT the desirability of making the door installation at Friendship Airport. (This was done and the following information forwarded by telephone to the Government Project Engineer on November 14, 1958: a. It is anticipated that space will be available at Friendship Airport during the required period. b. The additional cost to the Government for accomplishing the installation at Friendship will-total approximately $4,500.00. This includes hanger heating for extra shifts, police protection and hanger rental. No labor is included in this cost. STAT Sanitized Copy Approved for Release 2011/05/10: CIA-RDP78-03642A001200020014-1 Sanitized Copy Approved for Release 2011/05/10: CIA-RDP78-03642A001200020014-1 Project Manager PROJECT FISCAL REPORT Date: Paid Paid Account End Prior Current Month month -Open Committed Purchase Costs Commitments To Date Structures 9111.11 , a , e 27/. o E.M. s.Des n 9111.21 E.M.Maoh.Deei n 9111.22 o a Electronics s 9111.1. e Electron.Mech. 9111.32 Nuclear Energy 9111.41 Ordnance 9111.51 3 r.Services 9111.1 o , Aer ios 9111.71 Tool r. 9111.81 Pro .Su v. 9111.91 i o / o 'e ,d Eng.Labor 9111 Mechanical 9112.11 Electronic 9112.21 Inspection 9112.31 ;?Y, 2 Mfg. Labor 9112 Total Labor 911 , 2 Structures E.M.S s.Deai n 9111.21 E M.Mech.Design 9111.22 1 3tronics %rs_ 9111 1 Electron,Mech. 9111.32 Nuclear Energy 9111.41 Ordnance 9111.51 2 ;! Engr.Services 9111.61 , Ap 3 ~o ;~2 Aerodynamics 9111.71 Tool r. 9111.81 Pro .Su v. 9111.91 0 ?~ ,no e4 Eng.Labor 9111 a Mechanical 9112.11 z~r' a,e Electronics 9112.21 Inspection 9112.31 A Mf .La r . 9112 2. n AX, -10 7 Total Labor 911 2/ d3G,/C - /. 4w M&PP 9123 no 2,2-7,0`e Sub.Contract 9124 eo G ODC 9125 2/ 27 D, co z Tot.Direct 911 1- 771, 4-4 P o a, Eng?_0 H 9136 Mfg. O /H 9137 G&4 O /H 9138 - otal 91 FT /.J~Xf ;7 3 1-4 ? CONTRACT CHANGES/PROPOSALS INC. IN ESTIMATED COST '- 3 0 0 (-, Y Wor ! Order No. Estimated Estimated Coat To Costs At Coal; lets Completion A T ~V' A , Sanitized Copy Approved for Release 2011/05/10: CIA-RDP78-03642A001200020014-1 Sanitized Copy Approved for Release 2011/05/10: CIA-RDP78-03642A001200020014-1 :ob~son, Di tr r GAk'i ...,.,~. , ... T nfM Na WO N& . // /// 4 U I L I 1 I I I I l I N l I- ~Ll_LL11 Fiji /3STAT Sanitized Copy Approved for Release 2011/05/10: CIA-RDP78-03642A001200020014-1 Sanitized Copy Approved for Release 2011/05/10: CIA-RDP78-03642AO01200020014-1 it Mom I Yom. t am" Na ITEM Na r d Go~ir~iNG f"u/D. 1. a N1E Ti2,4 A mom' TA MW. ~5 , Sanitized Copy Approved for Release 2011/05/10: CIA-RDP78-03642AO01200020014-1