REQUEST FOR ADDTIONAL WORK UNDER TASK C OF CONTRACT RD-26 WITH (SANITIZED) (ED-133G, BALLOON, PORTABLE HYDROGEN GENERATOR)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-03642A001300010017-8
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
May 31, 2012
Sequence Number: 
17
Case Number: 
Publication Date: 
April 9, 1957
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP78-03642A001300010017-8.pdf75.76 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 : CIA-RDP78-03642A001300010017-8 ? jU1vtIUtJ\ I IHL ? 9 April 1957 M ORANDUTA FOR: Chief, Technical Services Staff SUBJECT : Request for Additional Work under Task C of Contract RD-26 with (ED-133G, Balloon, Portable Hydrogen Generator 1. Description of the Program This program is directed toward the development of a lightweight- portable hydrogen generator. A laboratory research program designed to study the feasibility of developing such an item has just been concluded with the evidence indicating that such a generator should in fact be possible. 2. Purpose of the Project The purpose of this project would be to attempt to translate the theoretical capability which has been demonstrated during the conduct of the laboratory research phase of the program into an operational capability by building and testing a full scale generator. If success- ful, such a generator would permit an agent to inflate a personnel balloon and exfiltrate himself from a denied area. This requirement is one of long standing. 3. Recommended Contractor The recommended contractor for this d ve pment is 0 25X1 has done an excellent 25X1 job of reviewing the problem on a laboratory basis and has come up with a very promising chemical reaction and generator design. 4. Support Requirements There are no support requirements with other government agencies. Total Cost The total cost for this second phase of the program is estimated at $18,285.00 for an eight month period. Charges are to be made against Allotment Number 7-2502-10. DOC 12_~_ REV V'7.7 1.1` T-y> OHIO CS VP T pv~ ORIO CLASS ' G. -- 4JUST ILXT REV g2610 Js~ 33.2 Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 : CIA-RDP78-03642A001300010017-8 Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 : CIA-RDP78-03642A001300010017-8 a Jvamut-V I INL ? 6. Security Information Contract RD-26 is an A;ency sterile contract. Task C is also Agency sterile; however Government interest may be shown. The item, except in its full scale testing phase, will be unclassified. Agency interest in all work and material under the contract is classified Secret and may be divulged only on a need-to-know basis to appropriate security approved personnel. 7. Project Engineer The project engineer for this work will be Room 212, West Outbuilding, Chief TSS/Engineering Division DD/P/TSS/E Distribution: Orig - ED-133G when rettd from C/TSS 1 - ED Chrono 1 25X1 25X1 File 25X1 CONFIDENTIAL Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 : CIA-RDP78-03642A001300010017-8