THIS LETTER REPORT DESCRIBES THE ACTIVITY UNDER TASK ORDER NO. C DURING FEBRUARY, 1958.

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-03642A001300010038-5
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 22, 2016
Document Release Date: 
May 31, 2012
Sequence Number: 
38
Case Number: 
Publication Date: 
March 14, 1958
Content Type: 
LETTER
File: 
AttachmentSize
PDF icon CIA-RDP78-03642A001300010038-5.pdf104.12 KB
Body: 
I Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 :CIA-RDP78-03642A001300010038-5 ~~~ G e~~-~{~ ~Uf~ FI DENTIAL March 14, 1958 This letter report describes the activity under Task Order Na. C during February, 1958. During this period, three 1/5-scale runs were made in the small experimental generator. The results are indicated in Table 1. In all three runs, the time for total generation was in excess of the specified maximum of 60 minutes. On the basis of the results obtained from the eight tests conducted thus far in the small generator unit, it is necessary to revise the relationship among catalyst concentration, initial temperature, and time for total generation that had been deduced previously from the small-scale laboratory studies of this system. The data are currently being analyzed to determine the relationship which best expresses the influence of catalyst concentration and temperature on generation time. The 1/5-scale experimental generator is being modified to incorporate some of the design changes that are contemplated for .the full-scale experimental unit. These modifications include the use of neoprene-coated nylon fabric tubing for the generator water inlet and the catalyst feed-tube inlet so as to eliminate the zippers, which have proven unsatisfactory in the 1/5-scale unit. L~ ~ ~ ~ D EST 1 AL pA10 DDJMP .Ge~~++ seDA~IE ~ L' TB? 3.~~~2/2-- .' QAlG CLASS ..a.Z._ F'G_.5 43~V ~L.f~a .~~- JI~S~ ~... HfXT RES A19T41: NR 10.4 ^ Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 :CIA-RDP78-03642A001300010038-5 Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 :CIA-RDP78-03642A001300010038-5 CONFIpENTIAI, TABLE 1. DATA FOR ADDITIONAL RUNS IN 1/5-SCALE GENERATOR UNIT _ Gas Generated. cu ft Time for A2+H2O, Catalyst, Total Method Run H2, Theo?- IIncor- H2, Cor- H2O, Cggr- Per Cent Temp. F CoC12.6H2O Generation of ATo. Scale retical rested rested rest?dt1) Reaction Initial _ Rise , lb , min. Addition 6 1/5 760 $42 720 45 94.5 46 61 2.00 125 Center 7 (2) 1/5 760 937 7J+4 99 97.5 64, 74 1.83 70 Center 8(3) 1/5 760 877 764 45 100 55 47 2.00 125 Center (1) 20 cu ft of H2O (gas) a 1 lb. (2) Concentration of the N~BH4 increased by removing about 10 gallons of water. (3) Concentration of the NaB~, decreased by adding about 10 gallons of water. CQNFIDENTIAL - ~~ Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 :CIA-RDP78-03642A001300010038-5 'Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 :CIA-RDP78-03642A001300010038-5 ~~ -3- March 1~, 1958 CONFIDENTIAL Future tests in the small generator will be run using the procedure that is expected to be followed in the full-size generator, as related to the addition of the sodium borohydride and of the cobalt chloride, and to the tie off of the inlet tubes during the generation period. The full-scale experimental unit has been ordered. Delivery is expected by about June 1, 1958? The total appropriation on this Task Order was X39,375. As of March 1, 1958, the unexpended balance was approximately $8,350. In Duplicate CQN~~IDF.IU~IiAL Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 :CIA-RDP78-03642A001300010038-5