FULL SCALE TEST OF THE PORTABLE HYDROGEN GENERATOR

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-03642A001300010050-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
5
Document Creation Date: 
December 22, 2016
Document Release Date: 
May 31, 2012
Sequence Number: 
50
Case Number: 
Publication Date: 
August 11, 1958
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP78-03642A001300010050-1.pdf272.75 KB
Body: 
Declassified in Part -Sanitized Copy Approved for Release 2012/05/31 :CIA-RDP78-03642A001300010050-1 (~ ~;~ C ~ ~ ~ ~ ~ ~ ~ ~ Lt Auguat ].958 I~MORAN~i FOR THE RS~RD St~JECT t Ftil.l Scale Test of the Pcs"table Hydrogen t3eaerator 1. Oa 5 July 1958 the folloxing tndivid~oals assembled at the for the full scale test and dsma~stratic~ o~'~ portable hydrogen geaeratora FD Personaels 8. Success Achieved The test was the first for the full scale unit and with this is mind it is 8ifficult to characterize the generation as anything less than outstandingl~,~ successful. There were certain time cassumiag operations Which should be Worked c~axt before the wait could be ccs7sidered aperatiaeal. These however are in the preparatory operatioais prior to generaticri. once generatioa~ was begun the reactioai was self-sustaining at a controlled rate. Actual geaeratiaai time for the 3500 cubic feet of hydrogen was 25 minutes. 25X1 25X1 It should be eeagphasized that the generators even is its present stage met all of its requireseeats. (1) total weight of generator shall be leas than 500 pauadas actual weights are NaBH~ 100 CoC1Z 50 NaOH 2 r ~~~ _~'.~~Rc~_v/~o~r~ ~ er ~L~,' Cenerator and Auxiliary equipme~ _ _ -- - -- t ~ .., . _5" ,.,, ~, ? z e C _ q~~~+ ~ ~ t }._ a ~-_ ^'t t ~ i~ ~ i~ ~ 1~1gT _~_ k8%Y 8~..i ~?,,,~-~ - Ayi;B~ HR Tf`-?'s (2) one man portable and operablet the components are packaged in Weights of 0 lbs or less. The satire operation was run through by csse~employee and 25X1 once generation Was begun the balloon was handled essentially by Declassified in Part -Sanitized Copy Approved for Release 2012/05/31 :CIA-RDP78-03642A001300010050-1 Declassified in Part -Sanitized Copy Approved for Release 2012/05/31 :CIA-RDP78-03642A001300010050-1 ~u~l'~ ~~ L+L~~~~~ alone with no ft~rther attention being given to 25X1 3? the generator at a1.1. self-sustaining, self'-controlled reaction in lees tyau 1 hours es pre pointed out earlier, this requirement was met (4) non?a~etallic s with the exception of the pump needed to inflate the air mat, the unit is n~cn~etallic (3) (5) enough hydrogen to provide 250 potmds of lifts Inasmuch as this reaction repeated ly goes to 9596 plus completion it is Pelt that this requirement eas satisfied although a direct measurement of the lift was nat possible due to difficulties with the inflation ducting and anbse- quent loss of gss. The reacticm teas Pollon~ed by a thernmo- couple however and the temperature rise elonfirmed near complete reaction. Sequence of Events ~5 The generator, airpump, and tulweighted sack were laid out at the site. 0950.1005 The generator air mat was pumped up with air. 1OO5.,loi5 The sack was filled with 15 pounds of rock. 1015-+1025 The weighted sack was tied to the bottom of the generator. lo3o.so4o The generator was moved irrto the water and the filling tubes ad.,3usted. lo~~o-u3o The generator Pills unattended. The filling tubes were tied off at 1130. 1050.1130 The ground cloth and balloon were ]aid out and the base of the balloon tied do!Wa. u3o-1230 Lunch 1240-1245 The AaOH was added to the generator. . ?-, Declassified in Part -Sanitized Copy Approved for Release 2012/05/31 :CIA-RDP78-03642A001300010050-1 Declassified in Part -Sanitized Copy Approved for Release 2012/05/31 :CIA-RDP78-03642A001300010050-1 - - ~ 1245-13~ 100 pounds of NaB~~4 was sloshed. 1' added to the generator and the solution 1305 The temperature of the generator pool was talaen (82 F) and the appropriate quantity of CoCl2 (8.6 pounds) ~Leeided on 1305-1325 The inflation tubing adapter was fastened to the generator outlet. 1325a.34o The CoCl2 solutioa was made up. 1340-1410 The system was flushed with nitrogen. 141oa.415 The inflation tubing was fastened to the inflations tubing adapter. 1417-1419 The CoCl2 was added to the generator. 1420 The CoCL, entry tube was tied off. 1420?x.445 t3eneratiou. A leak developed along the edge of the generator where one of the supporti~tg rods had been replaced.. The field expedient inflation tube adapter failed at 1430. The temperature rise was 50oP'. Foam rose to a height dust siu inches below the tap of the generator. 4. Caseents and Aeco~nendations Looking over the time sequence it is evident that there are several rather time ec~+stmting operations that should be imprrnred own s Also there are some operatio?s which could or should be eliminated.. They are discussed beloxt (a) It has been suggested that the pulp used for the air met be replaced by a smntl]. pressure battle. The volusme of air re- gaited is small (less than 10 cubic feet 8TP) and could probably be provided in a lightweight fiberglass sphere with metal liner. The diffusion problem over a period of time should be looked at here. Also, the metal will present somewhat of a radar target. Since the agent will be 'bringing is tools and equipment e.g, radio) of natal, hort~ever, the strict non- metal requiremeat for the generator is probably nart too realistic ~Ye4Y? Declassified in Part -Sanitized Copy Approved for Release 2012/05/31 :CIA-RDP78-03642A001300010050-1 Declassified in Part -Sanitized Copy Approved for Release 2012/05/31 :CIA-RDP78-03642A001300010050-1 ' ? ~ ~V ~~~iV ~~ ~ ^ ~ (b) The filli.ag operation should be speec`Le$ up. This might be done by better or more elliciezrt inlets or weighting the unit. Since the lilting proced,es unattended, Dace the process has begun, hoeever, and the operator can occupy himself in other preparatory operations (e,g. putting in the ground anchor, laying Dart the balloon, tying the halloos dawn, unpacking the borohydrida and. catalept, pre. paring the NaOH solutioa, etc.) it is not too critical that the time oa this tilling operatics be reduced greatly bslw the present 50 ednvtes. (c) The addition o! the IgaBH~ is not an easy procedure and should be i'proved. Rot ashy is it time eossumingf but the possibility o! spilling andlosing the chemical ~i~i: exists. (d) The attacbm~ent o! the inllatias tubing to the generator is most unsatislaetory. Abetter system should be davissd. Also, it would probably be a good id,~ to pronrid~e sn in? llatioa tube with both more length and strength. (e) The !lashing out with nitrogen was simply a precautisaary measure and largel,}r an unnecessary oni ? even for a lust test. The air trapped above the generator is so anal.! that the period during which an explosive mixture exists is ex? tremely small. Also, siaoe the gas is wet the static prob. lam is largely eliminated. It vas remarked that an integral duct was not the best type !or this appliaatioa. Handling the halloos would probably be made easier by use of a reeling Sleeve. 5. F~rture work has been directed to submit an extension proposal. to cover the costs o! writing a tins! report and operations manual The films o! the eration are being processed nor and when this is completed can review them and decide what it any modifications should be made oa the generator. Alan the question o! whether a second lull scale test should be ran has not been settled. 25X1 It is the leeltng of the undersigned that lM~pite the outstanding success achieved on the first full scale run that the unit is still a very marginal unit as far as any operational use is concerned. This for ~ number of reasons and they are enumerated beloars -4 Declassified in Part -Sanitized Copy Approved for Release 2012/05/31 :CIA-RDP78-03642A001300010050-1 Declassified in Part -Sanitized Copy Approved for Release 2012/05/31 :CIA-RDP78-03642A001300010050-1 _ t ? ~ ~T~~~ (a) (b) (c) the generator and chemicals weigh 202 pounds and constitute a considerable bulk. Ths 'balloon weighs 47 pamds. The total weight involved is then 249 pounds. Moreover this does not include packaging and whey packagLng in a manner satisfactory for cashing is figured in, a total weight of at least 500 pounds is involved. This is a considerable weight to bring in. ble fob 25X1 The undersigned estimates that the bulk to be buried is in excess of 25 cubic feet. a pool of water appzbacimately 3 feet deep must be found in order to candutzt the operation. This means a transportation problem of carrying 500 pounds of 'bull~r materials sane distance. The time imrolv~ed is obviously a problem here also for Deice the mowing has begun the items are exposed to possible detection and the longer the time elapsed the more serious this will probabl}r became. (d) wrather is a critical roblem. 3amehow a forecast of the winds must be obtained and can not be expected to obtain thiE25X1 himself. Coaiceivab]y this can be radioed in but this is a rather unsatisfactory procedure unless the agent has all the gear at the site sad ready to begin operations an short ao~tice. This woail.d bring up the problem of exposure cited in (e) above hasever. Even if exposure were not a concern, the problem of forecasting winds in a denied area is riser to say the least. (e) handling the ballooai by one man is no simple problem under very light wind canditioa3s and is virtually impossible wader gusty coaidttions. Therefore even if everything up to the point of generatioan we:rt satisfactorily, the remaining problem of a successful launch is a serious cx;e. In view of the operational problems described above, it is the re? caa-endation of the undersigned that this project be terminated as soon as is practicable. A total of $44,000 has als~eac~y been expended on this program and a further expenditure of same $6,000 more might be justified in order to put the pro~eet in satisfactory shape. If it is decided to run a second full scale test, it is the recammendatian of the undersigned that this be dome at the low temperature conditiaa (i.e. e water temperature of 45oF) as the catalapt requirement is mooch gpeater here and the generatbn problems might not be the same as those experienced in the test dust completed.. 25X1 Declassified in Part -Sanitized Copy Approved for Release 2012/05/31 :CIA-RDP78-03642A001300010050-1