REQUEST FOR EXTENSION OF TEST AND EVALUATION, AND FOR REDESIGN AND MODIFICATION OF A TSS HYDROGEN GENERATOR

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-03642A001300030032-9
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
May 2, 2012
Sequence Number: 
32
Case Number: 
Publication Date: 
December 10, 1957
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP78-03642A001300030032-9.pdf75.34 KB
Body: 
Declassified in Part -Sanitized Copy Approved for Release 2012/05/02 :CIA-RDP78-03642A001300030032-9 ZO December 1957 CQNFIDENTIAI. MEMORANDUM FOR: Chief, Technical Services Staff StTBJF~CT : Request for Extension of Test and Evaluation, and for Redesign and Modification of a TSS Hydrogen Gen- erator REFERENCE : Memorandum dated 21 August 1957 for C~TSS, Subject: Request for Initiation of Test and Evaluation of Hydrogen Generator 1. Description of the Project Redesign, modification and roof testing of the TSS Hydrogen Gen- erator developed by Thia work was necessitated by 25X1 failure of a basic generator retort section in the test and evaluation work described in the referenced memorandum. A section of the retort will be tested to obtain temperature time data involved in the heating and cooling of this piece during intermittent operation of the generator. From this data a stress analysis of this part will be made and a new piece designed. The generator retorts will then be modified and proof tested. 2. Purpose of the Project The purpose of this project is to eliminate the one problem area re- maining in the operation of the generator and to insure its satisfactory performance to meet an area division need. Two area divisions are con- cerned: SR and EE and they are currentl in need of a supply of lifting gas for propaganda balloon purposes Should the subject 25X1 generator performance prove reliable it would satisfy all the lifting gas requirements of these two area divisions in this area. 3. Recommended Contractor The recommended contractor for this work will be the Industrial Gas Branch of the Mechanical Division, ERDL, Fort Belvoir, Virginia. Assis- ~+. Total Cost The total cost of this work at ERDL is estimated at $18,000.00. will incur some costs also in support of this program, and these 25X1 funds will be requested separately. CC~'~FIDENT'~AL I DOC ~L_ R;Y~ ,DATE BY 7~ e~sr~ noMp ~ oPi ~'~3~~-- fR'G CtASSC~Z~pGEE ~_ REY CLJtSS __L____ i dUS7 ^~,~~REXT REY ~p?_ py111t Ht ii,Z Declassified in Part -Sanitized Copy Approved for Release 2012/05/02 :CIA-RDP78-03642A001300030032-9 Declassified in Part -Sanitized Copy Approved for Release 2012/05/02 :CIA-RDP78-03642A001300030032-9 5. Support Requirements S ~. 6. Project Engineer The project engineer for this program will be 210 West Outbuilding, extension 7. Security Information Room 25X1 25X1 DD~P~TSS~ID Distribution: Orig - Prod File when ret'd from C~TSS 1 CC~f~~IDEIVT~r~L Chief TS3~Engineering Mvision -~, Declassified in Part -Sanitized Copy Approved for Release 2012/05/02 :CIA-RDP78-03642A001300030032-9