PLACEMENT OF MODEL 2 AIR-FED INCINERATOR
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-03642A001700010020-0
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
4
Document Creation Date:
December 22, 2016
Document Release Date:
May 30, 2012
Sequence Number:
20
Case Number:
Publication Date:
July 29, 1960
Content Type:
MEMO
File:
Attachment | Size |
---|---|
![]() | 100.78 KB |
Body:
Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 : CIA-RDP78-03642AO01700010020-0
TRANSMITTAL SLI% TE
M NO.
BUILDI
RE
L . IF I
~~- ~J titi~ 1j'1~~~yt~tat_
Y 4-,
FROM:
ROOM NO.
BUILDING
EXTE SION
FORM NO .11 A 1 REPLACES FONM '-#~ I. ''~? ,~ ! ~. llfl
Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 CIA-RDP78-03642AO01700010020-0
H ll I. I ~
Declassified in Part Sanitized Copy Approved for Release 2012/05/31 : CIA-RDP78-03642AO01700010020-0
I ' III
Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 : CIA-RDP78-03642AO01700010020-0
Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 : CIA-RDP78-03642AO01700010020-0
25X1
25X1
Ili
Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 : CIA-RDP78-03642AO01700010020-0
Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 : CIA-RDP78-03642AO01700010020-0
R A CONFIULNJJAL
T
29 July 1960
MEM)RAZW[ FOR: Chief, TSD/Support Staff
SUBJECT : Placesent of Model 2 Air Fed Incinerator
plated and is presently sitting at the receiving dock
1. The first prototype Model 2 Air-Fed Incinerator has been cos-
This sodel incinerator has been brought in to the headquarters
area in order to be set up in an office for dessnstration and test pur-
poses.
2. This incinerator is 64 inches high (not including the stack) and
24 inches outside diaseter. A 220 volt, 3 phase, 60 cycle, 1. HP electric
aster is located in the bettea section of the unit which enables the
operator to destroy between 75 and 125 pounds of classified paper files
per hour. A 9 inch disaster stack protrudes free the top of the incinerator
which out be outletted free the roes or building to enable the hot com-
bustion gasses to be exhausted. A roes at least 8 feet square and ten
feet high is desireable for the installation of this incinerator.
3. It is requested that a revs be selected for the placesent of this
prototype Model 2 Air-Fed Incinerator. If further inforsation is requested
please contact the undersigned or the project engineer for this progras,
25X1
25X1
NEXT RAV AUTHi HA 1841 e
D/Engineering Branch
:at CONFI F,
CRtC COMP C~;i TYPE _Q
DOC REV DATE BYL!
flii CLA&a_-5 .. REV CLn&s `r -
Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 : CIA-RDP78-03642AO01700010020-0