LETTER TO (SANITIZED) FROM (SANITIZED)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-03642A001700020013-7
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
5
Document Creation Date: 
December 22, 2016
Document Release Date: 
May 31, 2012
Sequence Number: 
13
Case Number: 
Publication Date: 
August 22, 1957
Content Type: 
LETTER
File: 
AttachmentSize
PDF icon CIA-RDP78-03642A001700020013-7.pdf177.8 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 : CIA-RDP78-03642A001700020013-7X1 August 22, 1957 25X1 CONFIDENTIAL This reports progress during July, 1957, on tthee(develo meat of an Equipment Safeguard Unit which h 1 mee We foIlawirit -re-quir-e-manta s 1. The unit shall be wholly contained in a weather-tiht enclosure of diiensions approximately b x 5-3/14." x L" (dimensions to most AN rack mounted equipment specifi- cations), 2. The unit shall initiate two strands of Primacord turough reliable independent explosive trains. 3. The unit shall be so designed as to prevent accidental initiation by requiring two-handed operation. 4. The unit shall rovide a reliable time delay of at least conds between actuation and initiation. J5?5 5. The unit shall pass environmental tests necessary for qualification under Military Specification MIL-E-5272A, titled "Environmental resting, Aeronautical and Associated Equipment, General Specifications for," -71 Doc HL Y (i~rF O, T d y C _ lt ~ Q~ Qf,lu Cs; in .QED t i tY Q d cl., L 04;f .SS ONF L., IA -` ~XT -- FiEY Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 : CIA-RDP78-03642A001700020013-7 Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 : CIA-RDP78-03642AO01700020013-7 6. The unit shall be so designed as to permit surveillance and replacement of explosive and pyrotechnic components periodically. 7. `"7e unit shall be detonator safe; that is, initiation of the detonators in the safe position shall not initiate the succeeding elements in the explosive train, nor shall such initiation throw fragments or particles from the weather- tight enclosure. PROGRESS During the period covered by this report, a new design was made incorporating the features outlined in last month's report (namely, L1. delay columns, two boosters, and new lever and safety button combination). '."his design is shown on Drawing E12502. The rotor, having 1 delay columns located two each in parallel planes at 900 to each othsq, is shown on Drawing D12503 and the rotor housing with the two boosters and primacord entrances is shown on Drawing D12513. A model was made of this design and is shown in the picture attached to this report. "'his model was made with teflon bearings and teflon faced firing pins to out down on friction, and :ias a rotor return spring. The teflon bearings were replaced with bronze bearings without affecting the functioning of the .odel. The model functions well mechanically and will be used for immersion tests. The loading of the delay column and boosters was discussed with loading engineers at Atlas' Reynolds Experimental !laboratory. As a result of this discussion, the booster length was shortened to 3/4" and four test blocks simulating the booster containing portion of the rotor housing, with the exit portion of the delay columns in rotor, were fabricated for the purposes of testing booster propagation (since leads enter side of booster) and fragmentation, if any, caused by booster detonation. Pending.,; satisfactory results of these tests, five rotor and rotor housing combinations will be fabricated and used for delay column testing and static safety tests. Any design changes and model fabrication are being held pendir the results of these tests. Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 : CIA-RDP78-03642AO01700020013-7 Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 : CIA-RDP78-03642AO01700020013-7 - 3 - A series of primacord fittings has been designed, molds fabricated, and limited quantities of fittings fab- ricated. These fittings are shown in simulated use on inert primacord, and separately in the photographs attached to this report. Used with each Is a primacord end cup, as sh,.wn in Drawing A12514. Drawings of the fittings are as follows: Long Nut Drawing A12516 Long Union - Drawing A12520 Short Union Drawing A12519 Split Tee - Drawing A12517 Propagation tests using t ,ese fittin s will be performed in the near future. In the immediate future, limited explosive tests of various types for propagation and static safety will be performed to determine if design changes are necessary in Design E12502. Also, propagation tests using the primacord fittings will be performed. Satisfactory results of these tests will mean that fabrication of models for test and delivery can be started immediately, STATUS OF FUNDS Funds Allocated $ 33,685.62 Previous Expenditures 49948,48 Balance at Beginning of Period 28,737.14 Expend' ture During Period 8,526.86 Bala ice at- end of Period 20,210.28 Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 : CIA-RDP78-03642AO01700020013-7 Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 : CIA-RDP78-03642AO01700020013-7 -4- Very truly yours Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 : CIA-RDP78-03642AO01700020013-7 Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 : CIA-RDP78-03642AO01700020013-7 Iq Next 2 Page(s) In Document Denied Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 : CIA-RDP78-03642AO01700020013-7