WEEKLY ACTIVITY REPORT (31 JANUARY 1955 TO 4 FEBRUARY 1955)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-03991A000500020028-4
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
5
Document Creation Date:
December 14, 2016
Document Release Date:
March 7, 2003
Sequence Number:
28
Case Number:
Publication Date:
February 10, 1955
Content Type:
MEMO
File:
Attachment | Size |
---|---|
![]() | 238.11 KB |
Body:
STANDARD FORM No. 64 A proves r Release 20 : CIA-RDP78-09991 A000500020028-4
Office Memorandum ? UNITED STATES GOVERNMENT
TO Chief of Logistics
FROM : Acting Chief, Transportation Division
DATE: 10 February 1955
suBJ$CT: Weekly Activity Report (31 January 1955 to 4 February 1955)
1. GENERAL
25X1A
b. Special Truck Runs (New Item - Completed)
Two non-scheduled truck runs were made during the week as
(1) On 3 February 1955' 4000 pounds of machinery were
25X1 A moved from
(2) A second trip was made during the
week to deliver 12,000 pounds of general cargo.
c. Movement of Agency Records Center
25X1A
(New Item - Continued) 25X1A
Plans have been completed and arrangements made for the
movement of the Agency Records Center from[ I to
25X1 A Actual imple-
25X1A
25X1
25X1
mentation of the plan began on Friday, 4 February 1955, when the
first two truckloads of shelving were delivered to the new build-
2. PROJECTS AND STUDIES IN PROCESS
a. He uarters Regulations on Motor Vehicle Accidents
(Continued Item)
1 draft of the Headquarters Regulation has been completed an
is in the process of informal collaboration,
Approved For Release 200 IrAf IA-RDP78-03991A000500020028-4
25X1
25X1
25X1
Approver Release 2 / : CIA-RDP78-0 1A000500020028-4
Headquarters
Re ations on Preparation and Sub-
mission of Tables o Vehicular Allowances 25X1
These regulations are currently in the process of formal
coordination.
c. Requests for Vehicle Actions (New Item - Completed)
25X1 requests processed
during tan. reporting period.
d. Survey of Motor Vehicle Operations (New Item -
Completed
25X1A
Two representatives of this office surveyed the vehicle
operations at Project l during the period 17 to 21 January 25X1A
1955. A report of this inspection has been prepared and submitted
through the Chief of Logistics to the Director of Training. This
report contains recommended action to improve motor vehicle opera-
tions at this installation and correct deficiencies which were
found to exist.
3. OTHER ITEMS OF INTEREST
a. Air Shipments (New Item - Completed
Twenty air shipments, weighing a total of 1,275 pounds,
were made as follows:
25X1A
Approved For Release 20Q
CIA-RDP78-03991 A000500020028-4
Approvedr Release 2003RDP78-03"1A000500020028-4
25X1A
Railway Express Shipments (New Item - Completed)
Only one shipment was made by Railway Express during the
week. This shipment consisted of 75 pounds of office equipment
25X1 A which was shipped
c. Bus Transportation for Agency Personnel (New Item - Completed)
Arrangements were made to provide Agency bus transportation
service for three separate groups of Agency personnel. These services
included:
(1) Transportation for fifteen persons from
N.W., to the Office of the Chief, Signal Officer,
and return. This bus left the point of origin at 08+5 hours and
returned at ll30 hours.
fro(2) On 1 and to thee South 9Agriculture Building and leftstheeted
25X1 A pointo origin a 0815 hours and returned at 1200 hours.
(3) A second Agency bus transported twelve personnel from
Central Building to the South Agriculture Building on 1 and 2
February 1955. This bus left the point of origin at 0800 hours
and returned at 1210 hours,
d Safety Training Program for Drivers (New Item - Completed)
Arrangements for a Safety Training Program for Drivers was
discussed with the Agency Safety Officer. A program suitable for
presentation to all drivers assigned to this Division, as well as
drivers assigned to other components of the Agency, is being prepared.
e. European Trip (New Item - Continued)
Action has been completed on all items contained in the Report
of Field Trip by Mr. Garrison and with the following
25X1A
25X1A
Approved For Release 20( `CIA-RDP78-03991A000500020028-4
ApprovedY.dr Release 2003/04/1q:CIA-RDP78-01A000500020028-4
25X1A
has been queried regarding the discontinuance of
channels for shipments to his station. In a lisp ?e
January 1955, the Senior Representative,II stated that the sta-
tion "did not wish to discontinue the use of
facilities for receipt of non-sensitive material". Based on this
information, it appears that shipments are currently. being handled
in accordance with the desires of the WE Division. Therefore, no
changes will be made in current procedures unless otherwise re-
quested.
4. SPECIAL PROBLEMS
exceptions;
a. Reference Tab A, Paragraph 3 --- The TVA of the
has not yet been submitted to the Transportation Divi-
received.
~
sion. No action can be taken on this item until the TVA is
will be reported in subsequent Weekly Activity Reports,
E on. scheduled cargo runs to all areas in
ope s e studied and the results of these studies
b. Reference Tab F, Paragraph 1. ---
c Reference Tab J, Paragraph 3 --- The Senior Representative,
None
MAJOR OBJECTIVES
a Development of contracts with three packing and storage
companies in the Washington, D C., area for the purpose of
utilizing their facilities and services in processing and storing
baggage,. personal effects, household effects, and privately owned
automobiles of Agency employees who are transferred from the
United States to a field station in an overseas area or are
returning from overseas.
PERCENTAGE COMPLETED: 55%
b. Establishment of an agreement with Supply and Procurement
Divisions concerning coordination with the Transportation Division
of all matters regarding transportation of materiel and supplies
with emphasis on those transportation arrangements with commercial
vendors for delivery of materiel and supplies to Agency installa-
tions
PERCENTAGE COMPLETED: 20%
25X1A
25X1
25X1 C
25X1A
25X1 C
Approved For Release 2003/0417 : CIA-RDP78-03991A000500020028-4
SECRET
Approved'iWe Release %&17: CIA-RDP78-03IA000500020028-4
c. Re-edit and reproduce the Cargo Branch film as a presentation
of the basic activities of the Cargo Branch to be utilized at future
sessions of the Logistics Support Course and similar courses, as well
as for indoctrination of Logistics personnel of various Agency compo-
nents:
PERCENTAGE COMPLETED: 70%
d Review of current laws and regulations relative to the movement
of persons and their personal effects, and the development of additional
implementing regulations to insure their movement in a manner that is
consistent with security, economy and efficiency.
PERCENTAGE COMPLETED: 450
e. Preparation of necessary basic issuances for the control of the
allocation, operation, use and maintenance of Agency motor vehicles.
PERCENTAGE COMPL=:
1 -
f. Development of a records management program to record and
reflect vehicular maintenance and operation costs.
PERCENTAGE Cam: 25%
g. Preparation of Plans for the complete rehabilitation of office
space at the Que Building Motor Pool for use as a dispatcher's office
and chauffeur's waiting room, to correct a condition which is wholly
inadequate and detrimental to economical and efficient operations.
PERCENTAGE COMPLETED: 35%
h. Study and development of a plan to improve the preventive
maintenance program within the full scope of the policy presently
established.
PERCENTAGE COMPLETED: 30%