SEMIANNUAL REPORT OF OBJECTIVES AND ACCOMPLISHMENTS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-04608A000300020011-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
5
Document Creation Date: 
December 22, 2016
Document Release Date: 
August 1, 2008
Sequence Number: 
11
Case Number: 
Publication Date: 
January 18, 1963
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP78-04608A000300020011-1.pdf255.22 KB
Body: 
Approved For Release 2008/08/01 : CIA-RDP78-04608A000300020011-1 OPTIONAL FORM NO. 10 UNITED STATES GOVERNMENT DATE: 18 ,JAN 196- SUBJECT: Semiannual Report of Objectives and Accomplishments REF : Memorandum from Chief, Administrative Staff, dated 26 December 1962, subject as above (OL 2 7457) 1. The following report of accomplishments covering the period since 30 June 1962 is submitted in response to reference: a. All Headquarters Controlled Accounts which were selected for co ver~;~>,--t e.,Tvne II FPA have been commp eted. eludes i eo'Ewo HeadquaiXters Contro etY'Accounts y 1962 report. b. Four chapters of the Supply Division Instructional Manua ve now been published. These include: (1) a listing o all the codes use upply system, (2 procedures \pOZa_ conducti nventories (3) due-in ed , and (4) due-out procedures. Further progress in this program will be delayed until the new procedures are developed for the conversion of CONK depots to Type I accountable activities. c.' The plans for utilizing the computer for the complete calculation of requirements for ordering stock r Ata"t a seco f--Yie??cte -have been delayed WET CON H E T L ` is project would entail a major revis on which w' be considered during Phase II and which will encompass the changes involved in the establishment of decentralized accountability at the domestic depots. d. The program for reduc' the master nomenclature ile by tilt ing the ilitie of the conZutpr bas een /,a com fished. is ' now considered a c5uine function, and >n ther report will be rendered. -CROUP 1 Exclrseu caw classl'Ica~iaa Approved For Release 2008/08/01 : CIA-RDP78-04608A000300020011-1 Approved For Release 2008/08/01 : CIA-RDP78-04608A000300020011-1 SUBJECT: Semiannual Report of Objectives and Accomplishments e. A computer program was established to develop :test I teriel L . s-ard also to provide information no requzsements exist. This pregs.ara. n effective management tool for future excess lists and any subse- v '-quent disposal action necessary. f. The relocation of the Packing and Crating Unit and the centralize iorof the Packing and Sh! Section have b n completed. The new ing equipme and conveyor system have be ~.nC ed and are in full Gi,~/L`yY6r ne pai? ing methods and procedures will result in increased output. g. isbe ing ccupie on a temporary us5,permt neral Serviced Administration. We plan ,,to retain this facility until uch time as another-satisfactory storage arrangement Approved For Release 2008/08/01 : CIA-RDP78-04608A000300020011-1 y be Approved For Release 2008/08/01 : CIA-RDP78-04608A000300020011-1 SEJai~T a L SUBJECT: Semiannual Report of objectives and Accomplishments I i. We now have 41 Supply Catalogs refined and in th normal maintenance stage. This leave ma .~.,. u field of licatio to refine, pr;mamily in c Equ El ctron' th re Components. In addition, a/e approximately eight minor publications to j. Stock purification, i.e., elimination of obsolete,,~er iceable, and difficuluppo ai - o tver, this ms has been prog esess~:ng'aidly; h is a continuing project. 2. The following objectives were established and completed during the reporting period: a. A preliminary study was made to determine the feasibility of as a field forms stocksga center. is s y in di t there are out 135 fields .Qzk- .corms re esenting 00 or in a'c zs , g0 of these forms could be reproduced by the station for distribution throughout the area. b. An Economic Order Quantity Table was developed for the use the Building..& 1pOffice for replenish- -,ing its sh f s ck. St a~dies indi the average inventor value w rdd a reduced by 19 percent, while the wo oad in connection with stock replenishment ties would be reduced by approximately 46 percent. c. As rec ended by Suppl Division and concurred in by the Planni Staff and the pecial Operations Division, a stocks objective st y has been finalized is ready for sub 'scion to the irector of Logistics. This study recommends tke stock obje tives for para- military type items which re conside d necessary to adequately support paramili ry activities in a more efficient and economical manner. Also the study incor-oorates all special project requirements, such as, and Senior War Planner, Europe. 'Sawn' F'r 3 Approved For Release 2008/08/01 : CIA-RDP78-04608A000300020011-1 Approved For Release 2008/08/01 : CIA-RDP78-04608A000300020011-1 SUBJECT: Semiannual Report of Objectives and Accomplishments 3. The following are objectives for the last half of Fiscal Year 1963: a. Property in use accounts will be reviewed to ect those which ma y mar ant conversion to Type II indicates er management a of property through the installation of Type II. Finan 1 Acco ility if n analysis ea aunt b. The stock list fort I will be expanded to include additional items of office supplies, hand tools, housekeeping and communication expendable ems. This depot should have approximately 1,000 items of suppl for issue dire ctly? M-04ee field by the end-of of recurrin nd items in the afo? t6k categorie will be completed and stocks will be positioned at the The field stations who are authorized d. Establish a Headquarters Inventory.CQntropint for overall management of C ONUS depot.-stock and the - Processing of requisitions fromfield activities. This accountability referred to in item c. above. ac ' ity.~w}11 complement the decentralization of e. A complete revision of surveillance rocedures, cable to Agencyetandar s, fo chnica ivision s~ 'al ces has been completed and will be implement6d-on a priority basis. to draw directly from this depot will be advised by dispatch and furnished a stock list of items available. &" d act ies Approved For Release 2008/08/01 : CIA-RDP78-04608A000300020011-1 SUBJECT: Semiannual Report of Objectives and Accomplishments f. Develop a survei g. Proceed with plans and implementation o - Approved For Release 2008/08/01 : CIA-RDP78-04608A000300020011-1 ~,,Cv4- Europe~arr and Middle ~Eatations . Distribution : Orig & 1 - Addressee 1 - OL/SD 1 - OL/SD/FSB (Official) (17 January 63) Approved For Release 2008/08/01 : CIA-RDP78-04608A000300020011-1