MOVE TO BUILDING 213
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-04608A000400070012-4
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 23, 2016
Document Release Date:
November 6, 2013
Sequence Number:
12
Case Number:
Publication Date:
December 11, 1962
Content Type:
MEMO
File:
Attachment | Size |
---|---|
![]() | 91.09 KB |
Body:
Declassified in Part - Sanitized Copy Approved for Release @50-Yr 2013/11/06:
CIA-RDP78-04608A000400070012-4
6.es
c
ORM
10
Acting Director of Logistics
Chief, Planning Staff, GI,
Move to Building 213
it 1 DEC 1962
1. advised the Planning Staff on 7 December that SI-AT
Government occupancy of Building 213 would take place an 31 December.
Be also stated that Mr. Cunningham agreed that the "Operational" phase
of the move could be initiated an 1 January 1963. The establishment
of these dates was a result of a meeting held by with SI-AT
the building contractor and other individuals having prime interest in
completion of the building.
2.agreed that the external elevators at the Steuart
Building, necessary ramps, and other required unloading parapher-
nalia can be ready to initiate the "Operational" phase of the move
on 1 January. Be can schedule the required Libor and trucks to
move from daily requirements now being developed by
These daily requirements will be based on the manifests
be moved, which were submitted by each element of BPIC to
and on the decision to be mede on aomement of classified
materiel, i.e., move all classified materiel on the first day of the
"Operational" phase or move complete elements each day.
3. In further ;reparation for the move, held a
meeting on 5 December with repres element of
from Security and tram OL Planning
Staff also attended this nesting. questions Imre answered on
previous instructions that were issued for organisation of the
movement "Task Forces" and for final preparation of the menifests
of items to be moved. The problems related to Packing, Taping and
Labeling, and to Controls for Classified Materiel were discussed.
Instructions that were issued on these netters and on surplus safes
are enclosed. completely covered securitrpcalcies to be SI-AT
observed during move and identified security requirements that
must be met.
STAT
STAT
STAT
STAT
STAT
h. Actions to be accomplished during the "Preliminary" phase
of the move will be initiated this month as the areas to be utilised
become available. War instance, the mmteriel now stored with the
Aragrlimp Service in Alexandria is tentatively planned for movement
after 20 Docetber using GSA transportation.
DOC 1/ REV DATE L1BY n/CP Cif I
CMG COMP DPI . TYPE 42_42_ 1
ORM LASS-. PAGES PAGES _422_ REV CLASS
JUST NEXT SLY o20// AUTH HR 10-2
"
t.L
Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/11/06:
CIA-RDP78-04608A000400070012-4
r
C73,,
ettt*,,,1
Declassified in Part - Sanitized Copy Approved for Release VsLY...r 2013/11/06:
CIA-RDP78-04608A000400070012-4
BUBaCT: Move to Building 213
- 5. The required details of planning fire the "Operational"
phase of the move are nearing completion. believes STAT
that these plans v111 be finalised by 21 December.
Enclosure:
As stated above
Dietributiont
Original - Addressee
OL/PB (Offi
1 -1IFIO CAtt:
w/o one .
1 (m/o encl.)
1 - CLAD (w/o encl.
1 - OL/PD w/o encl.)
1 - OL/TD w/o encl.)
/,/
STAT
STAT
OL/PS, (11 Dec. 62) STAT ?