PARKING LOT AND ACCESS ROAD / (Sanitized)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-04720A000100040041-0
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
November 17, 2016
Document Release Date: 
July 14, 2000
Sequence Number: 
41
Case Number: 
Publication Date: 
March 16, 1954
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP78-04720A000100040041-0.pdf76.81 KB
Body: 
Approved For Release 2000/08/17 : CIA- 8& 00100040041-0_. '-c- - 935, 16 March 1954 MEMORANDUM TO Acting Deputy Director / Administration FROM SUBJECT : Parking Lot and Access Road 1. Authority is requested for the expenditure of approximately $15,250.00 for the construction of an access road automobile parking area This parking 25X1A6d area will be ON a R provide au omobile parking for vehicles of employees and students and to provide increased parking facilities in case of an emergency. 2. The estimate prepared by the Engineering Division at the was $13,646.60. The Real Estate and cons ruc on Division, Logistics Office, increased the figure to $15,250.00, because of the rock formation generally found throughout the area. The funds are available in the Budget. 25X1A6d 3. The parking area would be 117' x 250' and would accommodate 103 automobiles. The access road would be approximately 370' long. The road would be 8 wide, including shoulders, 12' of which would be paved. A breakdown of the estimated costs is attached. Acting Duty Diector / Administration Approved For Release 2000/08/17 F, P Approved For Release 2000/08/17 CII*Rr7P78-04720A000100040041-0. PROPOSED PARKING AREA AND ACCESS ROAD ACCESS ROAD Excavation (Bulldozer) 400 cu. yds. Q .50 Base - 2-4" compacted layers of crushed stone or gravel 738 sq. yds. @ $1.85 Surface i" Class A Surface Treatment Designation AT-50 492 sq. yds. 0 .40 Culverts 40' of 18" corrogated iron S $5.00 .per lineal ft. in place Seeding 2220 sq, ft. @ $14 per 1,000 sq. ft. $ 200.00 1360.00 197.00 200.00 _ 31.00 TOTAL ESTIMATE FOR ACCESS ROAD $1,988.00 PARKING AREA Excavation (including stockpiling topsoil) 8264 cu. yds. 0 .30 $2480.oo Pavement 3250 sq. yds. 0 $2 25 . 7313.00 Drainage Ditch 737 lineal feet @ .50 369.00 Painting Lines 3408 lineal feet 0 .075 256.00 TOTAL ESTIMATE FOR PARKING AREA 10 418.00 GRAND TOTAL $12,406.00 Plus 10% Contingency 12240.60 U3,646-.To- Parking Area (117' X 250') Access Road (370' long , $10,418.00 x 12 wide) 1,988.00 Real Estate & Construction (Add. for rock & contingency) 2 844.00 TOTAL $15,250.00